Loading...
HomeMy WebLinkAboutAPPROVED PVV1 PLANSPV-1FREEDOM FOREVER INDY 7.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075GREG ALBRIGHTDESCRIPTIONDATENO:SHEET:REVISIONS:JOB NO:F097052DESIGNED BY:GREGCLIENT:RANDALL WARNACK5410 HICKORY DRIVE, FORT PIERCE, FL34982AHJ: COUNTY OF ST. LUCIEUTILITY: FPL - FLORIDA POWER & LIGHTSYSTEM:SYSTEM SIZE (DC): 31 x 360 = 11.160 kWSYSTEM SIZE (AC): 7.600 kW @ 240VPOI: LINE SIDE TAPMODULES: 31 x LONGI SOLAR:LR4-60HPH-360MOPTIMIZERS: P401INVERTER: SE7600H-US [SI1]DATE:7/15/2021THIS PROJECT COMPLIES WITH THE FOLLOWING:2020 7TH EDITION FLORIDA BUILDING CODE: BUILDING2020 7TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL2020 7TH EDITION FLORIDA BUILDING CODE: MECHANICAL2020 7TH EDITION FLORIDA BUILDING CODE: PLUMBING2020 7TH EDITION FLORIDA BUILDING CODE: FUEL GAS2020 7TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION2020 7TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING2020 7TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY2017 NATIONAL ELECTRIC CODE (NEC)AS ADOPTED BY COUNTY OF ST. LUCIESITE LOCATIONCODES:VICINITY MAP:TABLE OF CONTENTS:CONSTRUCTION NOTES:PHOTOVOLTAIC SYSTEMPV-1SITE LOCATIONPV-2SITE PLANPV-2AROOF PLAN WITH MODULES LAYOUTPV-2BSTRUCTURAL CALCULATIONSPV-3MOUNTING DETAILSPV-4THREE LINE DIAGRAMPV-5CONDUCTOR CALCULATIONSPV-6EQUIPMENT & SERVICE LISTPV-7LABELSPV-7ASITE PLACARDPV-8OPTIMIZER CHARTPV-9 & 10SAFETY PLANCONDUIT AND CONDUCTOR SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS ANDARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS.ALL SOLAR ENERGY SYSTEM EQUIPMENT SHALL BE SCREENED TO THE MAXIMUM EXTENTPOSSIBLE AND SHALL BE PAINTED A COLOR SIMILAR TO THE SURFACE UPON WHICH THEY AREMOUNTED.MODULES SHALL BE TESTED , LISTED AND INDENTIFIED WITH FIRE CLASSIFICATION INACCORDANCE WITH UL 2703. SMOKE AND CARBON MONOXIDE ALARMS ARE REQUIRED PERSECTION R314 AND 315 TO BE VERIFIED AND INSPECTED BY INSPECTOR IN THE FIELD.DIG ALERT (811) TO BE CONTACTED AND COMPLIANCE WITH EXCAVATION SAFETY PRIOR TO ANYEXCAVATION TAKING PLACEPHOTOVOLTAIC SYSTEM GROUND WILL BE TIED INTO EXISTING GROUND AT MAIN SERVICE FROMDC DISCONNECT/INVERTER AS PER 2017 NEC SEC 250.166(A).SOLAR PHOTOVOLTAIC SYSTEM EQUIPMENT WILL BE INSTALLED IN ACCORDANCE WITHREQUIREMENTS OF ART. 690 OF THE 2017 NECSYSTEM GROUNDING ELECTRODE CONDUCTOR FOR PV SYSTEM TO BE SIZED TO MEET THEREQUIREMENTS OF 2017 NECTHE EXISTING MAIN SERVICE PANEL WILL BE EQUIPPED WITH A GROUND ROD OR UFERSOLAREDGE OPTIMIZERS ARE LISTED TO IEC 62109-1 (CLASS II SAFETY) AND UL 1741 STANDARDSINSTALL CREW TO VERIFY ROOF STRUCTURE PRIOR TO COMMENCING WORK. EMT CONDUITATTACHED TO THE ROOF USING CONDUIT MOUNT.SITE LOCATION MSPACINVJBUMSITE PLANSCALE: 1/16" = 1'-0"1PV-2FREEDOM FOREVER INDY 7.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075GREG ALBRIGHTDESCRIPTIONDATENO:SHEET:REVISIONS:JOB NO:F097052DESIGNED BY:GREGCLIENT:RANDALL WARNACK5410 HICKORY DRIVE, FORT PIERCE, FL34982AHJ: COUNTY OF ST. LUCIEUTILITY: FPL - FLORIDA POWER & LIGHTSYSTEM:SYSTEM SIZE (DC): 31 x 360 = 11.160 kWSYSTEM SIZE (AC): 7.600 kW @ 240VPOI: LINE SIDE TAPMODULES: 31 x LONGI SOLAR:LR4-60HPH-360MOPTIMIZERS: P401INVERTER: SE7600H-US [SI1]DATE:7/15/2021ROOF AREA : 3227 SQ FTSITE PLAN151'-4"79'-9"50'-8"7'-10" 7'-6"49'-7"DRIVEWAYHICKORY DRIVEUTILITY METERLEGEND:OBSTRUCTIONPIPE VENT31 LONGI SOLAR:LR4-60HPH-360MCONDUITSETBACKMSP AC VISIBLELOCKABLELABELED ACDISCONNECTMSPJUNCTIONBOXINVSE7600H-US [SI1] JB UM TOTAL ROOF AREA RIDGE SETBACK CALCS:TOTAL ROOF AREA: 3227 SQ FTSINGLE MODULE AREA: 19.65 SQ FTTOTAL NUMBER OF MODULES: 31TOTAL AREA OF MODULES: 609.15 SQ FTROOF COVERAGE: 18.88%FIRE SPRINKLERS : NOBOS WILL BE AS CLOSE AS POSSIBLE TO MSP WITHIN 10'THIS SYSTEM DESIGNED WITH:WIND SPEED: WIND EXPOSURE: CSNOW LOAD: 0ROOF LINEPROPERTY LINE(E) MAIN SERVICE PANEL(N) 31 LONGI SOLAR: LR4-60HPH-360M(E) UTILITY METER(N) JUNCTION BOX(N) SOLAREDGE SE7600H-US [SI1]INVERTER WITH RAPID SHUTDOWN(N) UTILITY DISCONNECT SQUARE DD222NRB 1 60 0 MSPACINVJBUMROOF PLANSCALE: 1/8" = 1'-0"1LEGEND:OBSTRUCTIONPIPE VENTMODULESCONDUITSETBACKMSP AC JBACDISCONNECTMAIN SERVICEPANELJUNCTIONBOXINVINVERTERPMPRODUCTIONMETERNOTES:1.EMT CONDUIT ATTACHED TO THE ROOF USING CONDUIT MOUNTS2.ATTACHED CLAMPS AT 25% FROM THE EDGE AND 50% FROM THE CENTER OF THE MODULES3.JUNCTION BOX IS MOUNTED TO THE RAIL.PV-2AFREEDOM FOREVER INDY 7.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075GREG ALBRIGHTDESCRIPTIONDATENO:SHEET:REVISIONS:JOB NO:F097052DESIGNED BY:GREGCLIENT:RANDALL WARNACK5410 HICKORY DRIVE, FORT PIERCE, FL34982AHJ: COUNTY OF ST. LUCIEUTILITY: FPL - FLORIDA POWER & LIGHTSYSTEM:SYSTEM SIZE (DC): 31 x 360 = 11.160 kWSYSTEM SIZE (AC): 7.600 kW @ 240VPOI: LINE SIDE TAPMODULES: 31 x LONGI SOLAR:LR4-60HPH-360MOPTIMIZERS: P401INVERTER: SE7600H-US [SI1]DATE:7/15/2021ROOF AREA : 3227 SQ FTROOF PLAN WITH MODULES LAYOUTFIRE ACCESSPATHWAYSFIRE ACCESSPATHWAYS3'-0" 3'-0"(N) 31 LONGI SOLAR: LR4-60HPH-360MMODIFIED SETBACKS PROPOSED AT RIDGE:TOTAL ARRAY AREA = 609.15 SFTOTAL ROOF AREA = 3227 SFTOTAL ARRAY AREA AS A % TO ROOF AREA = 18.88%18.88% < 33%BOS WILL BE AS CLOSE AS POSSIBLE TO MSP WITHIN 10'THIS SYSTEM DESIGNED WITH:WIND SPEED: 1 WIND EXPOSURE: CSNOW LOAD: 0By Yuri at 9:32:07 AM, 7/16/20210 60 ROOF AREA STATEMENTROOFMODULE QUANTITYROOF PITCHARRAY PITCHAZIMUTHROOF AREAARRAY AREA13118°18°90°1151 SQ FT609.15 SQ FTPV-2BFREEDOM FOREVER INDY 7.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075GREG ALBRIGHTDESCRIPTIONDATENO:SHEET:REVISIONS:JOB NO:F097052DESIGNED BY:GREGCLIENT:RANDALL WARNACK5410 HICKORY DRIVE, FORT PIERCE, FL34982AHJ: COUNTY OF ST. LUCIEUTILITY: FPL - FLORIDA POWER & LIGHTSYSTEM:SYSTEM SIZE (DC): 31 x 360 = 11.160 kWSYSTEM SIZE (AC): 7.600 kW @ 240VPOI: LINE SIDE TAPMODULES: 31 x LONGI SOLAR:LR4-60HPH-360MOPTIMIZERS: P401INVERTER: SE7600H-US [SI1]DATE:7/15/2021STRUCTURAL CALCULATIONS:TOTAL ROOF AREA: 3227 SQ FTARRAY COVERAGE: 18.88%SYSTEM DISTRIBUTED WEIGHT: 2.19 LBSS-5!: PROTEA POINT-LOAD: 23.77 LBSSTRUCTURAL CALCULATIONSBy Yuri at 9:32:09 AM, 7/16/2021 PROTEABRACKETPROTEABRACKET(E) TRAPEZOIDAL METALROOF PROFILE1" SELF TAPPING SCREWFACTORY APPLIEDEPDM WITH STICKY ADHESIVE(E) TRAPEZOIDAL METALROOF PROFILE(N) LONGI SOLAR:LR4-60HPH-360MUNIRAC SM LIGHT RAIL SOLAR MOUNTRACKING SYSTEMGROUNDING END/MIDCLAMP2X4 TRUSS @ 24" O.C.UNIRAC SM LIGHT RAIL RACKING SYSTEM(N) LONGI SOLAR: LR4-60HPH-360M(E) METAL SEAMS@ 12" O.C.ROOF ATTACHMENT'ATTACHMENT DETAILScale: NTSSOLAR PV ARRAY SECTION VIEWScale: NTSPARTIAL ROOF FRAMING PLANScale: NTSPV-3FREEDOM FOREVER INDY 7.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075GREG ALBRIGHTDESCRIPTIONDATENO:SHEET:REVISIONS:JOB NO:F097052DESIGNED BY:GREGCLIENT:RANDALL WARNACK5410 HICKORY DRIVE, FORT PIERCE, FL34982AHJ: COUNTY OF ST. LUCIEUTILITY: FPL - FLORIDA POWER & LIGHTSYSTEM:SYSTEM SIZE (DC): 31 x 360 = 11.160 kWSYSTEM SIZE (AC): 7.600 kW @ 240VPOI: LINE SIDE TAPMODULES: 31 x LONGI SOLAR:LR4-60HPH-360MOPTIMIZERS: P401INVERTER: SE7600H-US [SI1]DATE:7/15/2021MOUNTING DETAILS2By Yuri at 9:32:12 AM, 7/16/2021 SOLAREDGE P401 POWER OPTIMIZERSJUNCTIONBOXSTRING-12 - #10 AWG, PV WIRE1 - #6 AWG IN FREE AIR OR#8 AWG MUST BE IN EMT CONDUITSTRING-2SOLAREDGE P401POWER OPTIMIZERS2 - #10 AWG,PV WIRE15 LONGI SOLAR:LR4-60HPH-360M16 LONGI SOLAR:LR4-60HPH-360M4 - #10 AWG, THWN-21 - #8 EGC, THWN-2IN 3/4" ORLARGER EMT CONDUITUM(E) 150A / 2PMAIN BREAKER(END FED)(E) 150A RATEDMAIN SERVICE PANEL1PH, 120/240V 60HZ(E) UTILITYMETER(N) LINESIDE TAP VIA ULLISTED CONNECTORS1 - #6 GEC, BARE COPPERFREE AIR BONDEDEXISTING UFER TIE INTO UTILITYOVERHEADFEED(N) 60A FUSEDAC DISCONNECTSQUARE D D222NRB2 - 40 AMP FUSES3 - #8 AWG, THWN-21 - #8 EGC, THWN-2IN 3/4" OR LARGER EMT CONDUITA TAPBOX MAY BE USED IN LIEU OF PERFORMING THE LINESIDETAP IN THE MAIN SERVICE PANEL. THIS IS DEPENDENT UPON SITECONDITIONS.3 - #6 AWG, THWN-21 - #8 EGC, THWN-2IN 3/4" OR LARGER EMT CONDUIT(N) SOLAREDGESE7600H-US [SI1]INVERTERACDCRAPIDSHUTDOWNSWITCHCONNECT TO EXISTING UFERNOTE:CONDUIT AND CONDUCTORS SPECIFICATIONS ARE BASEDON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANTTO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONSBACKFEED FUSE SIZINGMAX. CONTINUOUS OUTPUT 32A @ 240V32.00X1.25=40AMPS40A FUSES - OKPV SYSTEM11.160 kW-DC7.600 kW-ACPV-4FREEDOM FOREVER INDY 7.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075GREG ALBRIGHTDESCRIPTIONDATENO:SHEET:REVISIONS:JOB NO:F097052DESIGNED BY:GREGCLIENT:RANDALL WARNACK5410 HICKORY DRIVE, FORT PIERCE, FL34982AHJ: COUNTY OF ST. LUCIEUTILITY: FPL - FLORIDA POWER & LIGHTSYSTEM:SYSTEM SIZE (DC): 31 x 360 = 11.160 kWSYSTEM SIZE (AC): 7.600 kW @ 240VPOI: LINE SIDE TAPMODULES: 31 x LONGI SOLAR:LR4-60HPH-360MOPTIMIZERS: P401INVERTER: SE7600H-US [SI1]DATE:7/15/2021THREE LINE DIAGRAM DCMODULETOOPTIMIZERROOF / FREE-AIR2101.250.9411.351DCOPTIMIZERTOJUNCTION BOXROOF / FREE-AIR2101.250.9411.351DCJUNCTION BOXTOINVERTEREXTERIOR WALL481.250.9434.050.8ACINVERTERTOAC DISCONNECTEXTERIOR WALL381.250.94321ACAC DISCONNECTTOPOIEXTERIOR WALL381.250.94321PV-5FREEDOM FOREVER INDY 7.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075GREG ALBRIGHTDESCRIPTIONDATENO:SHEET:REVISIONS:JOB NO:F097052DESIGNED BY:GREGCLIENT:RANDALL WARNACK5410 HICKORY DRIVE, FORT PIERCE, FL34982AHJ: COUNTY OF ST. LUCIEUTILITY: FPL - FLORIDA POWER & LIGHTSYSTEM:SYSTEM SIZE (DC): 31 x 360 = 11.160 kWSYSTEM SIZE (AC): 7.600 kW @ 240VPOI: LINE SIDE TAPMODULES: 31 x LONGI SOLAR:LR4-60HPH-360MOPTIMIZERS: P401INVERTER: SE7600H-US [SI1]DATE:7/15/2021CONDUCTOR AMPACITY DE-RATE CALCULATIONEQUIPMENTWIRE LOCATIONCONDUCTORQTY.AWG WIRESIZENEC FACTORSTABLE310.15(B)(16)NEC FACTORSTABLE310.15(B)(2)(a)CONDUCTORAMPACITY@75C ADJ.NEC FACTORSTABLE310.15(B)(3)(a)CONDUCTOR CALCULATIONS MATERIAL LIST:PV-6FREEDOM FOREVER INDY 7.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075GREG ALBRIGHTDESCRIPTIONDATENO:SHEET:REVISIONS:JOB NO:F097052DESIGNED BY:GREGCLIENT:RANDALL WARNACK5410 HICKORY DRIVE, FORT PIERCE, FL34982AHJ: COUNTY OF ST. LUCIEUTILITY: FPL - FLORIDA POWER & LIGHTSYSTEM:SYSTEM SIZE (DC): 31 x 360 = 11.160 kWSYSTEM SIZE (AC): 7.600 kW @ 240VPOI: LINE SIDE TAPMODULES: 31 x LONGI SOLAR:LR4-60HPH-360MOPTIMIZERS: P401INVERTER: SE7600H-US [SI1]DATE:7/15/2021QTY.PARTPART #DESCRIPTION31MODULES114-360WLONGI SOLAR: LR4-60HPH-360M31OPTIMIZERS130-401P401 SOLAREDGE POWER OPTIMIZER - FRAME MOUNTED MODULE ADD-ON1JUNCTION BOX480-276600VDC NEMA 3R UL LISTED JUNCTION BOX2CONNECTORS240-300STAUBLI / MULTI-CONTACT MC4 CONNECTORS (FEMALE)2CONNECTORS240-301STAUBLI / MULTI-CONTACT MC4 CONNECTORS (MALE)1INVERTER120-761SE7600H-US [SI1] 240V INVERTER UL1741 SA CERTIFIED INTEGRATED ARC FAULT PROTECTION AND RAPID SHUTDOWN1AC DISCONNECT323-06560A RATED 240VAC NEMA 3R UL LISTED1FUSES330-04040A FUSE 1 PH 240VAC1FUSE REDUCER330-53060A-30A FUSE REDUCER38ROOF ATTACHMENT 1240-401S-5!: PROTEA18RAIL 1211-100UNIRAC SM LIGHT RAIL 168 INCH (TOTAL 242 FEET NEEDED)21RAIL HARDWARE 1261-517BND T-BOLT AND NUT SS23MODULE CLAMPS 1221-101SM MIDCLAMP PRO DRK23MODULE CLAMPS 1221-202SM ENDCLAMP PRO W/ END CLAMP8SPLICE 1261-600BND SPLICE BAR PRO SERIES MILL23MLPE MOUNT 1261-510MICRO MNT BND TBOLT SS6ACCESSORIES 1211-202E-BOSS CONDUIT MOUNT COMP KIT12ACCESSORIES 1211-200E-BOSS RAIL TRAY4ACCESSORIES 1211-206E-BOSS BRIDGE TRAY7ACCESSORIES 1211-207E-BOSS BRIDGE CLIPS36GROUNDING LUG 1260-300BURNDY GROUND WEEB-LUG36L-FOOT 1241-100UNIRAC L-FOOT SERRATED W/T-BOLT CLEAR (KIT)BREAKER SIZES:SERVICE LIST:NONEEQUIPMENT & SERVICE LIST 1.NEC ARTICLES 690 AND 705 AND IBC SECTION R324MARKINGS SHOWN HEREON.2.ALL MARKING SHALL CONSIST OF THE FOLLOWING:A.UV RESISTANT SIGN MATERIAL WITH ENGRAVED ORMACHINE PRINTED LETTERS OR ELECTRO-PLATING.B.RED BACKGROUND COLOR WHITE TEXT AND LINEWORK.C.AERIAL FONT.3. ALL SIGNS SHALL BE SIZED APPROPRIATELY AND PLACED INTHE LOCATIONS SPECIFIED. SIGNAGE CANNOT BEHAND-WRITTEN.3.SIGNS SHALL BE ATTACHED TO THE SERVICE EQUIPMENTWITH POP-RIVETS OR SCREWS.NOTES:M690.54705.12(B)(2)(3)(b)"WARNING"DUAL POWER SOURCESSECOND SOURCE IS PHOTOVOLTAIC SYSTEM RATED AC OUTPUT CURRENT - 32.00 AMPSAC NORMAL OPERATING VOLTAGE - 240 VOLTSWARNING:POWER SOURCE OUTPUTCONNECTIONDO NOT RELOCATE THISOVERCURRENT DEVICE.TURN RAPIDSHUTDOWN SWITCH TOTHE "OFF" POSITION TOSHUT DOWN PV SYSTEMAND REDUCE SHOCKHAZARD IN THE ARRAY690.56(C)(1)(A)SOLAR PV SYSTEM EQUIPPEDWITH RAPID SHUTDOWNAC 690.15, 690.54PV SYSTEM AC DISCONNECT RATED AC OUTPUT CURRENT - 32.00 AMPSAC NORMAL OPERATING VOLTAGE - 240 VOLTSRAPID SHUTDOWN SWITCH FORSOLAR PV SYSTEM690.56(C)(3)INVERTERARRAYJ/BDC"WARNING"PHOTOVOLTAIC POWER SOURCEEVERY 10' ON CONDUIT AND ENCLOSURES"WARNING"ELECTRICAL SHOCK HAZARD.TERMINALS ON BOTH LINE AND LOAD SIDESMAY BE ENERGIZED IN THE OPEN POSITION690.13 (B)690.53PV SYSTEM DC DISCONNECTMAXIMUM VOLTAGE: 480VMAXIMUM CIRCUIT CURRENT: 32AMAX RATED OUTPUT CURRENT OFTHE CONTROLLER OR DC-TO-DCCONVERTER: 15ANEC 690.31(G)(3) & (4)PMPV METERSOLAR ELECTRICPV PANELSPV-7FREEDOM FOREVER INDY 7.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075GREG ALBRIGHTDESCRIPTIONDATENO:SHEET:REVISIONS:JOB NO:F097052DESIGNED BY:GREGCLIENT:RANDALL WARNACK5410 HICKORY DRIVE, FORT PIERCE, FL34982AHJ: COUNTY OF ST. LUCIEUTILITY: FPL - FLORIDA POWER & LIGHTSYSTEM:SYSTEM SIZE (DC): 31 x 360 = 11.160 kWSYSTEM SIZE (AC): 7.600 kW @ 240VPOI: LINE SIDE TAPMODULES: 31 x LONGI SOLAR:LR4-60HPH-360MOPTIMIZERS: P401INVERTER: SE7600H-US [SI1]DATE:7/15/2021LABELS MSPACINVJBUMCAUTION:MULTIPLE SOURCES OF POWER LOCATED AS SHOWN.DANGEROUS VOLTAGE MAY BE PRESENT AT ALL TIMES6X8" TYP - NEC 705.10PV-7AFREEDOM FOREVER INDY 7.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075GREG ALBRIGHTDESCRIPTIONDATENO:SHEET:REVISIONS:JOB NO:F097052DESIGNED BY:GREGCLIENT:RANDALL WARNACK5410 HICKORY DRIVE, FORT PIERCE, FL34982AHJ: COUNTY OF ST. LUCIEUTILITY: FPL - FLORIDA POWER & LIGHTSYSTEM:SYSTEM SIZE (DC): 31 x 360 = 11.160 kWSYSTEM SIZE (AC): 7.600 kW @ 240VPOI: LINE SIDE TAPMODULES: 31 x LONGI SOLAR:LR4-60HPH-360MOPTIMIZERS: P401INVERTER: SE7600H-US [SI1]DATE:7/15/20211.NEC ARTICLES 690 AND 705 AND IBC SECTION R324 MARKINGS SHOWN HEREON.2.ALL MARKING SHALL CONSIST OF THE FOLLOWING:A.UV RESISTANT SIGN MATERIAL WITH ENGRAVED OR MACHINE PRINTED LETTERS OR ELECTRO-PLATING.B.RED BACKGROUND COLOR WHITE TEXT AND LINE WORK.C.AERIAL FONT.3. ALL SIGNS SHALL BE SIZED APPROPRIATELY AND PLACED IN THE LOCATIONS SPECIFIED. SIGNAGE CANNOT BE HAND-WRITTEN.4. SIGNS SHALL BE ATTACHED TO THE SERVICE EQUIPMENT WITH POP-RIVETS OR SCREWS.NOTES:SITE PLACARDAC DISCONNECTMAIN SERVICE PANELINVERTER EQUIPPEDWITH RAPID SHUTDOWNUTILITY METERHICKORY DRIVE 31 PV MODULE 123456789101-1011-2021-3031-4041-5051-60123456789101-1011-2021-3031-4041-5051-60PV-8FREEDOM FOREVER INDY 7.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075GREG ALBRIGHTDESCRIPTIONDATENO:SHEET:REVISIONS:JOB NO:F097052DESIGNED BY:GREGCLIENT:RANDALL WARNACK5410 HICKORY DRIVE, FORT PIERCE, FL34982AHJ: COUNTY OF ST. LUCIEUTILITY: FPL - FLORIDA POWER & LIGHTSYSTEM:SYSTEM SIZE (DC): 31 x 360 = 11.160 kWSYSTEM SIZE (AC): 7.600 kW @ 240VPOI: LINE SIDE TAPMODULES: 31 x LONGI SOLAR:LR4-60HPH-360MOPTIMIZERS: P401INVERTER: SE7600H-US [SI1]DATE:7/15/2021SOLAREDGE OPTIMIZER CHARTOPTIMIZER CHARTHICKORY DRIVE SAFETY PLANMARK UP KEYINSTRUCTIONS:1.USE SYMBOLS IN KEY TO MARK UP THIS SHEET.2.SAFETY PLAN MUST BE MARKED BEFORE JOBSTARTS AS PART OF THE PRE-PLAN3.DOCUMENT ALL ADDITIONAL HAZARDS ON THIS PAGE& MAKE NOTES ON THE JHA SHEETIN CASE OF EMERGENCYNEAREST HOSPITAL OR OCCUPATIONAL/INDUSTRIAL CLINICNAME: _______________________________________________ADDRESS: ___________________________________________SAFETY COACH CONTACT INFORMATIONNAME: _______________________________________________ADDRESS: ___________________________________________ALL EMPLOYEES ON SITE SHALL BE MADE AWARE OF THESAFETY PLAN AND SIGN INDICATING THAT THEY AREAWARE OF THE HAZARDS ON-SITE AND THE PLAN FORWORKING SAFELY. NAME SIGNATURE__________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ ________________DATE: ______________ TIME:___________________________PERMANENT ANCHORTEMPORARY ANCHORINSTALLER LADDERJUNCTION / COMBINER BOXSTUB-OUTSKYLIGHTNO LADDER ACCESS (STEEPGRADE OR GROUND LEVELOBSTRUCTIONS)RESTRICTED ACCESSCONDUITGAS SHUT OFFWATER SHUT OFFSERVICE DROPPOWER LINESPTILBS7ZGASH2OPV-9FREEDOM FOREVER INDY 7.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075GREG ALBRIGHTDESCRIPTIONDATENO:SHEET:REVISIONS:JOB NO:F097052DESIGNED BY:GREGCLIENT:RANDALL WARNACK5410 HICKORY DRIVE, FORT PIERCE, FL34982AHJ: COUNTY OF ST. LUCIEUTILITY: FPL - FLORIDA POWER & LIGHTSYSTEM:SYSTEM SIZE (DC): 31 x 360 = 11.160 kWSYSTEM SIZE (AC): 7.600 kW @ 240VPOI: LINE SIDE TAPMODULES: 31 x LONGI SOLAR:LR4-60HPH-360MOPTIMIZERS: P401INVERTER: SE7600H-US [SI1]DATE:7/15/2021SAFETY PLANHICKORY DRIVE JOB HAZARD ANALYSISCrew leader to fill out all sections below, hold a pre-job safety meeting with all personnel, and upload this completed document and the Safety Plan to Site CaptureLadder Access·Ladders must be inspected before each use.·Extension ladders must be set up on a firm and level surface ata 4-to-1 rise to run angle (or 75 degrees) and the top must besecured to the structure. Extension style ladders placed onuneven, loose or slippery surfaces must additionally have thebase firmly anchored or lashed so the base will not slip out.·Extension ladders must be used with walk-through devices orthe ladder must extend 36" above the stepping off point.·A-frame ladders must only be climbed with the ladder spreaderbars locked in the open position; A-frame ladders shall not beclimbed while in the closed position (ex, closed and used whileleaned against a structure).·Additional notes:Mobile Equipment·Only Qualified operators will operate equipment; operators mustmaintain a certification on their person for the equipment beingoperated.·Type(s) of mobile equipment (Type/Make/Model):·Qualified operator(s):Material Handling and Storage·Materials will be staged/stored in a way that does not present ahazard to client, personnel or public. Materials stored on theroof will be physically protect from failing or sliding off.Fall Protection·A site-specific plan for fall prevention and protection is requiredprior to starting work and must remain onsite at all times untilwork is complete; a fall rescue plan must be outlined anddiscussed among the crew prior to work start.·First-person-Up (FPU) must install their anchor and connectbefore any other task, including installing other anchors. TheLast-Person-Down (LPD) must be the only person on a roofuninstalling fall protection.·FPCP (name and title):·FPU and LPD (name and title):Electrical Safety·The Electrical Qualified Person (EQP) is required onsite toperform electrical work.·All electrical work will be performed with equipment in anelectrically safe condition (de-energized) unless approval hasbeen granted prior to work.·Service drops and overhead electrical hazards will be indentifiedand protected from contact, as neccessary.·EQP (name and tile):Public Protection·The safety of the Client and Public must be maintained at alltimes.·The Client and the Public shall be prevented from entering thework zone through the use of barriers and/or signage, asrequired.·Company, Client and Public property shall be protected fromfalling objects.·Pets (including dogs) shall be secured by their owners prior towork start.·The Client should not leave pets, family members, or others incharge or care of Employees, Contractors, or TemporaryWorkers.·Crew leader responsible for communication with the client:·Client and public is excluded from work area by barricades (N/A,Yes, No):Training and Pre-Job Safety Briefing·All employees onsite shall be made aware of the specific hazardsof this project and review this HJA during a pre-job briefing, andtheir signature indicates awareness of site conditions and theplan to eliminate any hazards identified prior to and during theproject.·Crew leader (name/title):·Crew member (name/title):·Crew member (name/title):·Crew member (name/title):·Crew member (name/title):·Crew member (name/title):Airborne Contaminants:·Asbestos-containing (Transite) piping (ACP) - Do not disturb(move, drill, cut fracture, etc.)·Asbestos-containing thermal insulation (ACI) andAsbestos-containing duct wrapping (ACW) - do not disturb, noattic or crawlspace access is allowed if work to be performedcould cause exposure to personnel, client or public.·If yes, list specific tasks and protection in place:Weather and Environment·The site supervisor shall forecast the weather conditions at thejob site, prior to crew arrival, in order to mitigate any hazardsassociated with inclement weather (heat, cold, wind, rain, etc.)·The site supervisor will utilized a portable wind meter(anemometer) to verify actual onsite wind conditions, by checkingat the ground and on any elevated work surface (ex, rooftop)prior to work start, at midday and prior to solar panel staging on aroof.·Elevated work involving the moving or maneuvering of solarpanels shall cease at 25mph (sustained wind) until windsubsides.·Forecasted weather maximum temp (degrees f):Heat Related Illness Prevention·Employees shall have access to potable drinking water that isfresh, pure, and suitably cool. The water shall be located asclose as practicable to the areas where employees are working.Water shall be supplied in sufficient quantity at the beginning ofthe work shift to provide at least one quart per employee perhour for drinking for the entire shift. Employees may begin theshift with smaller quantities of water if they identify the locationand have effective means for replenishment during the shift toallow employees to drink on quart or more per hour. Thefrequent drinking of water shall be encouraged.·Shade shall be present when temperature exceeds 80 degreesFahrenheit. When the outdoor temperature in the work exceeds80 degrees Fahrenheit, employees shall have and maintain oneor more areas with shade at all times.·New employees must be acclimatized. New employees will bemonitored by their Crew Leader (site supervisor) for the first two(2) weeks of employment or longer when necessary.·Employees will be allowed and encouraged to implementscheduled breaks during each shift. Employees must takecool-down breaks in the shade any time they feel the need to doso to protect them from overheating. Supervisors areREQUIRED to allow employees any break period they needduring high heat conditions.·Cool Vests are encouraged for all employees at all times duringperiods of high heat.·Identify the location of the closet Occupational/Industrial Clinicor Hospital in case a crew member becomes ill.What is the specific plan to provide and replenish sufficient water forall employees on site?·If offsite replenish is necessary, where will you go to replenishwater (location/address):·Who will replenish the drinking water (name):Restroom facilities·Employees shall have access to restroom facilities withhand-washing stations. Use of onsite restroom is at the client'sdiscretion (location is annotated below). If client does not givepermission, location of suitable restroom facilities withhand-washing stations offsite will be provided. The onsitesupervisor will identify location and make arrangements toensure all employees have access at any point.·Restroom facilities will be (circle one): Onsite - Offsite·If Offsite, add location name and address:Incident Reporting Procedure·Contact your Site SupervisorName:Phone:·Contact your ManagerName:Phone:·Contact your Site SupervisorName:Phone:With: Your full name, phone number, office location, brief descriptionof what happen and when.NOTE ADDITIONAL HAZARDS NOT ADDRESSED ABOVE(add as many as necessary by using additional sheets)Define the Hazard:Method/steps to prevent incident:Define the Hazard:Method/steps to prevent incident:Define the Hazard:Method/steps to prevent incident:Define the Hazard:Method/steps to prevent incident:PV-10FREEDOM FOREVER INDY 7.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075GREG ALBRIGHTDESCRIPTIONDATENO:SHEET:REVISIONS:JOB NO:F097052DESIGNED BY:GREGCLIENT:RANDALL WARNACK5410 HICKORY DRIVE, FORT PIERCE, FL34982AHJ: COUNTY OF ST. LUCIEUTILITY: FPL - FLORIDA POWER & LIGHTSYSTEM:SYSTEM SIZE (DC): 31 x 360 = 11.160 kWSYSTEM SIZE (AC): 7.600 kW @ 240VPOI: LINE SIDE TAPMODULES: 31 x LONGI SOLAR:LR4-60HPH-360MOPTIMIZERS: P401INVERTER: SE7600H-US [SI1]DATE:7/15/2021SAFETY PLAN S-5!® ProteaBracket™ is a versatile bracket that adjusts easily to most WUDSH]RLGDOURRISUR¿OHVThe right way to attach almost anything to metal roofs! ProteaBracket™_ZZZ6FRPProteaBracket™ProteaBracket™ is the most versatile standing seam metal roof attachment solution on the market, fitting most trapezoidal sheet profiles with and without intermediate insulation. It features an adjustable attachment base and multiple solar module attachment options (illustrated on back) to accommodate varying widths and heights. There are no messy sealants to apply and no chance for leaks; the ProteaBracket comes with factory-applied, adhesive rubber sealant to ensure quick installation and a weather-proof fit. Installation is simple! The ProteaBracket is mounted directly onto the crown of the panel, straddling the profile. No surface preparation is necessary; simply wipe away excess oil and debris, align, and apply. Secure ProteaBracket through its pre-punched holes, using the hardened drill point S-5!® screws.ProteaBracket is the perfect match for our S-5-PV Kit and spares you the hassle of cold-bridging! For a solar attachment solution that is both economical and easy to use, choose ProteaBracket.**When ProteaBracket is used in conjunction with the S-5-PV Kit, an additional nut is required during installation.S-5!® Warning! Please use this product responsibly!Products are protected by multiple U.S. and foreign patents. For published data regarding holding strength, bolt torque, patents, and trademarks, visit the S-5! website at www.S-5.com.Copyright 2013, Metal Roof Innovations, Ltd. S-5! products are patent protected. S-5! aggressively protects its patents, trademarks, and copyrights. Version 112513.Distributed byProteaBracket™ is the perfect solar attachment solution for most trapezoidal H[SRVHGIDVWHQHGPHWDOURRISUR¿OHV1RPHVV\VHDODQWVWRDSSO\7KHfactory-applied adhesive rubber sealant weather-proofs and makes installation easy!ProteaBracket™([DPSOH3UR¿OH PP  PP  PP  PP  PP  PP  PP  PP Factory Applied SealantThru Hole 4x PP PP Each ProteaBracket™ comes with a factory-applied, adhesive rubber sealant on the base. A structural A2 stainless steel bimetal attachment bracket, ProteaBracket is compatible with most common metal roofing materials. All four pre-punched holes must be used to achieve tested strength. Mounting hardware is furnished with the ProteaBracket. For design assistance, ask your distributor, or visit www.S-5.com for the independent lab test data that can be used for load-critical designs and applications. Also, please visit our website for more information including metallurgical compatibilities and specifications. S-5!® holding strength is unmatched in the industry.Example ApplicationsS-5-PV Kit demonstrated with a ProteaBracket on a trapezoidal SUR¿OHMultiple Attachment Options:Side Rail OptionTop Rail OptionS-5-PV Kit Option3OHDVHQRWH$OOPHDVXUHPHQWVDUHURXQGHGWRWKHVHFRQGGHFLPDOSODFH DQD 507 Rev. 2016-02-18 Page 1 Certificate of Compliance Certificate: 70131735 Master Contract: 266909 (266909) Project: 70185553 Date Issued: 2018-10-08 Issued to: Unirac 1411 Broadway NE Albuquerque, New Mexico 87102 USA Attention: Klaus Nicolaedis The products listed below are eligible to bear the CSA Mark shown with adjacent indicators 'C' and 'US' for Canada and US or with adjacent indicator 'US' for US only or without either indicator for Canada only. Issued by: Michael Hoffnagle Michael Hoffnagle PRODUCTS CLASS - C531302 - POWER SUPPLIES- PHOTOVOLTAICS--PV Racking CLASS - C531382 - POWER SUPPLIES- PHOTOVOLTAICS-PV Racking and clamping systems-Certified to US Standards Models: SM SOLARMOUNT Flush-to-Roof is an extruded aluminum rail PV racking system that is installed parallel to the roof in landscape or portrait orientations. ULA Unirac Large Array is a ground mount system using the SolarMount (SM) platform for the bonding and grounding of PV modules. SOLARMOUNT The system listed is designed to provide bonding/grounding, and mechanical stability for photovoltaic modules. The system is secured to the roof with the L-Foot components through the roofing material to building structure. Modules are secured to the racking system with stainless steel or aluminum mid clamps and Aluminum end clamps. The modules are bonded to the racking system with the stainless steel bonding mid clamps with piercing points. The system is grounded with 10 AWG copper wire to bonding/grounding lugs. Fire ratings of Class A with Type 1, 2, 3, or 10 for steep slope. Tested at 5” interstitial gap which allows installation at any stand-off height. Certificate: 70131735 Project: 70185553 Master Contract: 266909 Date Issued: 2018-10-08 DQD 507 Rev. 2016-02-18 Page 2 The grounding of the system is intended to comply with the latest edition of the National Electrical Code, to include NEC 250 & 690. Local codes compliance is required, in addition to national codes. All grounding/bonding connections are to be torqued in accordance with the Installation Manual and the settings used during the certification testing for the current edition of the project report. The system may employ optimizers/micro-inverters and used for grounding when installed per installation instructions. Mechanical ratings: Downward Design Load (lb/ft²) 113.4 Upward Design Load (lb/ft²) 50.4 Down-Slope Load (lb/ft²) 14.7 Conditions of acceptability: Installation is subject to acceptance of the local inspection authorities having jurisdiction. The certification of these products relates only to the methods of installation, bonding, and grounding as outlined in the Installation Manual for each product. Unirac Large Array ULA is a ground mount system using the SolarMount (SM) platform for the bonding and grounding of PV modules. ULA aluminum components merge with SM rails and installer-supplied steel pipe. The SM rail system is secured to the horizontal Pipe using the Rail Bracket components. The Rear and Front cap secures the horizontal Pipe to the vertical Pipe. The Front cap is also used to secure the Cross brace. A Slider is attached to the vertical Pipe to secure the Cross brace. The SM rails, caps, slider, rail brackets, and cross braces materials are 6105-T5 aluminum extrusion. Fasteners materials are 304 stainless steel. Horizontal and vertical pipe materials meet the minimum requirements of ASTM A53 for galvanized steel pipe in 2” and 3” diameter. The mechanical load ratings from the SM test data will be applied to the ULA model. Fire Testing is not applicable due to being a ground mount system. APPLICABLE REQUIREMENTS UL 2703-1st Edition - Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat-Plate Photovoltaic Modules and Panels. LTR AE-001-2012 - List of Technical Requirements for Photovoltaic Module and Panel racking Systems MARKINGS The manufacturer is required to apply the following markings: x Products shall be marked with the markings specified by the particular product standard. x Products certified for Canada shall have all Caution and Warning markings in both English and French. Address: Intertek 3933 US 11 Cortland NY 13045 Telephone: 607-758-6516 www.intertek.com This information is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense, or damage occasioned by the use of this information. Any observations and results in this report are relevant only to the sample evaluated. Only the Client is authorized to copy and distribute this information and only then in its entirety. © 2018 Intertek Version: 8-September-2016 Page 1 of 3 GFT-OP-10a Subject: ETL Evaluation of SolarEdge Products to NEC 2017 Rapid Shutdown Requirements To, whom it may concern This letter represents the testing results of the below listed products to the requirements contained in the following standards: National Electric Code, 2017, Section 690.12 requirement for rapid shutdown. UL 1741, UL 1741 CRD for rapid shutdown The evaluation was done on the PV Rapid Shutdown System (PVRSS), and covers installations consisting of optimizers and inverters with part numbers listed below. The testing done has verified that controlled conductors are limited to: x Not more than 30 volts and 240 voltamperes within 30 seconds of rapid shutdown initiation outside the array. x Not more than 80 volts and 240 voltamperes within 30 seconds of rapid shutdown initiation inside the array. The rapid shutdown initiation is performed by either disconnecting the AC feed to the inverter, or – if the inverter DC Safety switch is readily accessible – by turning off the DC Safety switch. Applicable products: x Power optimizers: o PB followed by 001 to 350; followed by -AOB or -TFI. OP followed by 001 to 500; followed by -LV, -MV, -IV or -EV. P followed by 001 to 850. SP followed by 001 to 350. *When optimizers are connected to 2 or more modules in series, the max input voltage may exceed 80V. Following the implementation of the NEC 2017 rapid shutdown value of 80V max inside of the array at the beginning of 2019 , modules exceeding this combined input max voltage will be required to use optimizers with parallel inputs. x 1-ph Inverters: Address: Intertek 3933 US 11 Cortland NY 13045 Telephone: 607-758-6516 www.intertek.com This information is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense, or damage occasioned by the use of this information. Any observations and results in this report are relevant only to the sample evaluated. Only the Client is authorized to copy and distribute this information and only then in its entirety. © 2018 Intertek Version: 8-September-2016 Page 2 of 3 GFT-OP-10a o SE3000A-US / SE3800A-US / SE5000A-US / SE6000A-US / SE7600A-US / SE10000A-US / SE11400A-US / SE3000H-US / SE3800H-US / SE5000H-US / SE6000H-US / SE7600H-US / SE10000H-US / SE11400H-US when the following label is labeled on the side of the inverter: Inverter part number may be followed by a suffix x 3-ph Inverters: o SE9KUS / SE10KUS / SE14.4KUS / SE20KUS / SE30KUS / SE33.3KUS /SE43.2KUS / SE66.6KUS / SE100KUS ; when the following label is labeled on the side of the inverter: Inverter part number may be followed by a suffix If there are any questions regarding the results contained in this report, or any of the other services offered by Intertek, please do not hesitate to contact the undersigned. TÜV Rheinland PTL, LLC, 1107 W. Fairmont Drive, Building A, Tempe, Arizona 85282, Tel (480) 966-1700, Fax (775) 314-6458 January 20, 2021 Unirac 1411 Broadway Blvd. NE Albuquerque, NM 87102 Attn.: Unirac - Engineering Department Re: Engineering Certification for the Unirac U-Builder 2.0 SOLARMOUNT Flush Rail PZSE, Inc. - Structural Engineers has reviewed the Unirac SOLARMOUNT rails, proprietary mounting system constructed from modular parts which is intended for rooftop installation of solar photovoltaic (PV) panels; and has reviewed the U- builder Online tool. This U-Builder software includes analysis for the SOLARMOUNT LIGHT rail, SOLARMOUNT STANDARD rail, and SOLARMOUNT HEAVY DUTY rail with Standard and Pro Series hardware. All information, data and analysis contained within are based on, and comply with the following codes and typical specifications: 1. 2020 Florida Building Code, by Florida Building Commission 2. Minimum Design Loads for Buildings and other Structures, ASCE/SEI 7-16 3. 2018 International Building Code, by International Code Council, Inc. w/ Provisions from SEAOC PV-2 2017. 4. 2018 International Residential Code, by International Code Council, Inc. w/ Provisions from SEAOC PV-2 2017. 5. AC428, Acceptance Criteria for Modular Framing Systems Used to Support Photovoltaic (PV) Panels, November 1, 2012 by ICC-ES. 6. 2015 Aluminum Design Manual, by The Aluminum Association, 2015 Following are typical specifications to meet the above code requirements: Design Criteria: Ground Snow Load = 0 - 100 (psf) Basic Wind Speed = 85 - 190 (mph) Roof Mean Height = 0 - 60 (ft) Roof Pitch = 0 - 45 (degrees) Exposure Category = B, C & D Attachment Spacing: Per U-builder Engineering report. Cantilever: Maximum cantilever length is L/3, where “L” is the span noted in the U-Builder online tool. Clearance: 2” to 10” clear from top of roof to top of PV panel. Tolerance(s): 1.0” tolerance for any specified dimension in this report is allowed for installation. Installation Orientation: See SOLARMOUNT Rail Flush Installation Guide. Landscape - PV Panel long dimension is parallel to ridge/eave line of roof and the PV panel is mounted on the long side. Portrait - PV Panel short dimension is parallel to ridge/eave line of roof and the PV panel is mounted on the short side. 8150 Sierra College Boulevard, Suite 150, Roseville, CA 95661 T 916.961.3960 F 916.961.3965 W www.pzse.com Experience | Integrity | Empowerment 1478 Stone Point Drive, Suite 190, Roseville, CA 95661 T 916.961.3960 F 916.961.3965 W www.pzse.com Experience | Integrity | Empowerment Components and Cladding Roof Zones: The Components and Cladding Roof Zones shall be determined based on ASCE 7-16 Component and Cladding design. Notes: 1) U-builder Online tool analysis is only for Unirac SM SOLARMOUNT Rail Flush systems only and do not include roof capacity check. 2) Risk Category II per ASCE 7-16. 3) Topographic factor, kzt is 1.0. 4) Array Edge Factor ƳE = 1.5 5) Average parapet height is 0.0 ft. 6) Wind speeds are LRFD values. 7) Attachment spacing(s) apply to a seismic design category E or less. Design Responsibility: The U-Builder design software is intended to be used under the responsible charge of a registered design professional where required by the authority having jurisdiction. In all cases, this U-builder software should be used under the direction of a design professional with sufficient structural engineering knowledge and experience to be able to: • Evaluate whether the U-Builder Software is applicable to the project, and • Understand and determine the appropriate values for all input parameters of the U-Builder software. This letter certifies that the Unirac SM SOLARMOUNT Rails Flush, when installed according to the U-Builder engineering report and the manufacture specifications, is in compliance with the above codes and loading criteria. This certification excludes evaluation of the following components: 1) The structure to support the loads imposed on the building by the array; including, but not limited to: strength and deflection of structural framing members, fastening and/or strength of roofing materials, and/or the effects of snow accumulation on the structure. 2) The attachment of the SM SOLARMOUNT Rails to the existing structure. 3) The capacity of the solar module frame to resist the loads. This requires additional knowledge of the building and is outside the scope of the certification of this racking system. If you have any questions on the above, do not hesitate to call. Prepared by: PZSE, Inc. – Structural Engineers Roseville, CA 8150 Sierra College Boulevard, Suite 150, Roseville, CA 95661 T 916.961.3960 F 916.961.3965 W www.pzse.com Experience | Integrity | Empowerment 1478 Stone Point Drive, Suite 190, Roseville, CA 95661 T 916.961.3960 F 916.961.3965 W www.pzse.com Experience | Integrity | Empowerment EXP. 02/28/2023 ZACH E RPAULK. E NSECIL A R I D AOLF NOISS E FORP L E N G INEERSTATE OF No. 73522 THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY PAUL K. ZACHER, PE ON 01/20/2021 USING A SHA-1 AUTHENTICATION CODE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SHA-1 AUTHENTICATION CODE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. 01/20/2021 DIGITAL SIGNATURE