Loading...
HomeMy WebLinkAboutROOFINGg1ra LLC�I�GL�. ST. LUCIE WORKS ST LUCIE COUNTY ROOFING PERMIT INFORMATION SHEET Florida Building Code 7th Edition (2020) Based on Section 1525 of the Florida Building Code - Building INSTRUCTION PAGE COMPLETE THE NECESSARY SECTIONS OF THE UNIFORM ROOFING SHEET APPLICATION FORM AND ATTACH THE REQUIRED DOCUMENTS AS NOTED BELOW: Roof System Required Sections of the Permit Application Form Attachments Required See List Below Low Slope Application A, B, C 1,2,3,4,5,6,7 Prescriptive BUR-RAS 150 A, B, C 2,4,5,6,7 Asphaltic Shingles A, B, D 1,2,4,5,6,7 Concrete or Clay Tile A, B, D, E 1,2,3,4,5,6,7 Metal Roofs A, B, D Wood Shingles and Shakes A, B, D 1,2,4,5,6,7 Other As Applicable 1,2,3,4,5,6,7 ATTACHMENTS REQUIRED As Applicable): 1. Fire Directory Listing Page 2. From Product Approval: Front Page Specific System Description Specific System Limitations General Limitations Applicable Detail Drawings 3. Design Calculations per Chapter 16, or if applicable, RAS 127 or RAS 128 4. Other Component of Product Approval 5. Municipal Permit Application 6. Owners Notification for Roofing Considerations (Reroofing Only) 7. Any Required Roof Testing/Calculation Documentation Form RooflnfoFeb21 Rev Feb 18, 2021 ST. LUCIE WORKS Section A (General Information) Master Permit No. Process No. Contractors Name: JV3QCQO��j ('Kk(q'(A 0 License # Job Address i&�Zi2 =-1 � cs-� QZs—A ROOF CATEGORY ❑ Low Slope ❑ Mechanically Fastened Tile ❑ Mortar/Adhesive Set Tiles sphaltic Shingles ❑ Metal Panel/Shingles ❑Wood Shingles/Shakes ❑ Prescriptive BUR-RAS 150 ROOF ROOF TYPE. ❑ New roof ❑ Repair ❑ Maintenance Reroofing ❑Recovering ROOF SYSTEM INFORMATION Low Slope Roof Area (SF) Steep Sloped Roof Area (SF) & 1 bo Total (SF) �J Section B (Roof Plan) Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains. Include dimensions of sections and levels, clearly identify dimensions of elevated pressure zones and location of parapets. ST. LUCIE WORKS Section C (Low Slope Roofl Fill in specific roof assembly components and identify manufacturer (If a component is not used, identify as "NA") System Manufacturer. Product Approval No.: Design Wind Pressures, From RAS 123 Or Calculations, Zone 1': _ Zone 1: Zone 2: _Zone 3: Max. Design Pressure, from the specific product approval system: Deck: Type: Gauge Thickness: Slope: Anchor/Base Sheet & No. df Ply(s): Anchor/Base Sheet Fastener/Bonding Material: Insulation Base Layer: Base Insultation Size and Thickness: Base Insulation Fastener/Bonding Material: / Top Insulation Layer: Top Insulation Size and Thickness: Top Insulation Fastener/Bonding M Base Sheet(s) & No. of Ply(s): Base Sheet Fastener/Bonding Ply Sheet(s)' & No. of P Ply Sheet Fastener/Boo Top Ply: Material: Top Ply FastOer/Bonding Material: Surfacing: Fastener Spacing for AncAor/BYA11Zone 1' _" oc @ Lap, p RoZone 1,_" oc lap, # RoZone 2;_" oc Lap, # RoZone 3_" oc @ Lap. tt Ro Number of Fasteners Per Insu ion Board: Zone 1', Zone 1 Zone 2; Zone 3, Illustrate Components ted and Details as Applicabka: Woodblocking, Gu r, Edge Termination, Stripping, Flashing, Contin s Cleat. Cant Strip, Base Fiashk% Counterflashin oping, Etc, Indicate: Mea oof Height, Parapet Height, Height of Bass Flashing, Co ponent Malarial, Material' Thickness, Rastener Type, Fas ter Spacing or Submit Manufacturers Details that Comply Ith RAS 111 and Chapter 16— ST. LUCIE WORKS Section D (Steep Slope Roof System) Roof System Manufacturer: %--- \ Notice of Acceptance Number: Minimum Design Wind Pressures, if Applicable (From RAS 127 or Calculations): A - Zone 1: Zone 2e: Zone 2n:_Zone 2r: Zone 3e: Zone 3r: Deck Type: Type Underlayment: ` Roof lope: Insulation: Fire Barrier: Ridge Ventilation? Fastener Type & Spacing: Adhesive Type: Type Cap Sheet Mean Roof Height: Roof Covering: Type & Size Drip Edge: ST. LUCIE WORKS Section E (Tile Calculations) For Moment based the systems, choose either Method 1 or 2. Compare the values for Mr with the values from Me. If the Mf values are greater than or equal to the Mrvalues, for each area of the roof, then the the attachment method is acceptable. Method 1'Moment Based Tile Calculations Per RAS 12T (Zone 1: _ x X_ _ _ Mg = Ma _ Product Approval Mi (Zone 2e: =x)4 = -Mg: _=Ma. Product Approval Mf (Zone 2n: x.X-= Mg: =M,a_ Product Approval Mr (Zone 2r: -xI-= Mg:_=M&_ Product Approval Mf (Zone3e: -x).-= Mg'. -=Me.-- Product Approval Mf- (zone 3r: _x1-= Mg: -= Ka, - Product Approval M Method 2 "Simplified Tile Calculations Per Table Below" Required Moment of Resistance (MA From Table Below -Product Approval Mr Mr required Moment Resistance" Mean Roof Height Roof Slope 15' 20' 25' 30' 40' 2:12 34.4 36.5 38.2 3 42.2 3:12 32.2 34.4 36.0 7.4 39.8 4:12 30.4 32.2 33.8 35.1 37.3 5:12 28.4 30.1 31.6 32.8 34.9 6:12 26.4 28.0 29.4 30.5 32.4 7:12 1 24.4 1 25.9 1 27.1 28.2 30.0 'Must be used in conjunction with a list of moment based tile system • For Uplift based tile systems use Method 3. Compare the values f F' with the values for Fr If the F' values are greater than or equal to the Fr values, for each area of the roof, then the tile att ment method is acceptable. Method "alculations Per RAS 12T (Zone 1: x L =x W:=) -W:Fri Product Approval F' (Zone 2e: x L =x W:=� -W:=Fr2e Produd Approval F' (Zone 2n: /Ba x L =x W:=� -W:=Fr2� Produd Approval F' (Zone 2r: x L =x W:=� -W:=Frzr Produd Approval F' (Zone 3e: x L=x W:=� -W:=Fr3e Product Approval F' (Zone 3r: x L =x W:=) W:=Fr9r Product Approval F' Where to Obtain Information Description Z Symbol Where to find Design Pressure Zo s 1, 2e, 2n, 2r, 3e, 3r From applicable table in RAS 127 or by an engineering analysis prepared by PE based on ASCE 7 Mean Roof Height H Job Site Roof Slope Of0 Job Site Aerodynamic Multiplier a Product Approval Restoring Moment due to Grav' Mg Product Approval Attachment Resistance Mf Product Approval Required Moment Resist ce Me Calculated Minimum Attachmen esistance F' Product Approval Required Uplift Re ' tance Fr Calculated Average Tile We" ht W Product Approval Tile Dimensio L = length W = width Product Approval All calculat ns must be submitted to the building official at the time of permit application. II