Loading...
HomeMy WebLinkAboutFlorida Department of Regulation (FDEP) Permit or Exemption Florida Department of Rick Scott Governor MIN SETBACK REQ, Environmental Protection FROIIT SIDES Carlos Lopez-Cantera C14R SIDE Bob Martinez Center Lt. Governor REAR 2600 Blair Stone Road Tallahassee, Florida 32399-2400 TE k, :b' Ryan E. Matthews Interim Secretary Receipt for Submission SELF CERTIFICATION FOR A PROJECT AT A PRIVATE, SINGLE-FAMILY RESIDENCE 04/05/2017 Self Certification File No.: 0352766001EE File Name: 469 SE Naranja Ave Port Saint Lucie,FL 34983 - Self Certification Boat Lift(Aquatic Preserves) Dear Bruce Jerner: On, 04/05/2017,you used the Florida Department of Environmental Protection's electronic Self Certification Process to certify compliance with the terms and conditions of the Federal State Programmatic General Permit(SPGP) Self Certification Process for a project at private, single-family residence located at: THESE PLANS AND ALL PROPOSED woRK ARE SUBJECT TO ANY CORRECTIONS LAT-Degrees: 27 Minutes: 19 Seconds: 22.8603 REQUIRED BY FIELD INSPECTORS THAT MAY BE NECESSARY IN ORDER TO LONG-Degrees: -80 Minutes: 20 Seconds: 4.0788 COMPLY WITH ALL APPLICABLE CODES. SITE ADDRESS: 469 SE Naranja Ave Port Saint Lucie,FL 34983 COUNTY: St. Lucie o For: �1"fY$�I�L\G DI�'[ 1Qti ST.LUCIE IA�C REVIENNrED FOR CO REy�,%0+ED BY DATE E p T 1 ST BE K>tP`f Cj�i�� O Ah'D �iI PLANS E)�E, OR NO I1VS ,. BRENDA HOLLAND 469 SE NARANJA AVE Port Saint Lucie,FL 34983 You have certified that the project you propose to construct"at the above location meets all the conditions of the Self-Certification Process. A project that is built in.conformance to those conditions (attached for reference)will: 1. Qualify for a regulatory exemption under Section 403.813(1)(b) of the Florida Statutes (F.S.) and Chapter 62-330,-Florida Administrative Code(F.A.C.). As such, it is exempt -from the need to obtain a DEP Environmental.Resource Permit.; 2. Qualify for Consent by Rule or Letter of Consent(as applicable)under Chapter 253, F.S. and Chapter 18-21, F.A.C. (and Chapter 258, F.S. and Chapter 18-20, F.A.C., if applicable),when the project is located on submerged lands owned by the State of Florida.; Your Self-Certification is based solely on the information you provided under this process, and applies only to the statutes and rules in effect when your certification was completed. The certification is effective only for the specific project proposed, and only if the project is constructed, operated, and maintained in conformance with all the terms, conditions, and limitations stated in the Self-Certification Process. In addition, any substantial modifications in your plans should be submitted to the Department for review, as changes may result in a permit being required. You have acknowledged that this Self Certification will automatically expire if: 1. Construction of the project is not completed within one year from the self-certification date; 2. site conditions materially change; 3. the terms, conditions, and limitations of the Self Certification are not followed; or 4. the governing statutes or rules are amended before construction of the project. Completion of the Self Certification constitutes your authorization for Department or Corps personnel to enter the property for purposes of inspecting for compliance. Receipt of this Self-Certification constitutes authorization to use sovereignty/state-owned submerged lands, as required by rule 18-21.005, F.A.C. The authorization must be visibly posted during all construction activities. In waters that are accessible to manatees,obtain information on your mandatory Manatee Protection sign by clicking here. E 11. FEDERAL STATE PROGRAMMATIC GENERAL PERMIT (SPGP) You have certified that the project you propose to construct at the above location meets all the conditions of the SPGP Self-Certification Process and will be built in conformance to those conditions (attached for reference). Your proposed activityas-°certified is in compliance with the-SPGP program.U:S:Army Corps,of Engineers (Corps)_Specific conditions apply to.your project, attached.No further permitting for this activity is required by the Corps. In the event of the transfer of ownership of the property by sale or by any other means, when the structures or work authorized by this SPGP Self-Certification are still in existence at the time the property is transferred,the terms and conditions of this SPGP Self-Certification will continue to be binding on the new owner(s)of the property. Although the construction period for works authorized by Department of the Army permits is finite,the permit itself, with its limitations, does not expire. To validate the transfer of this SPGP Self-Certification and the associated responsibilities associated with compliance with its terms and conditions,the attached transfer of SPGP Self-Certification request must be completed and submitted to the Department at the time of transfer of ownership. The address is given below on the attached transfer form. This SPGP Self-Certification is based solely on the information you provided under this process, and applies only to the statutes and rules in effect when your certification was completed. You have recognized that your certification is effective only for the specific project proposed, and provided the project is constructed, operated, and maintained in conformance with all the terms, conditions, and limitations stated in the SPGP Self-Certification Process. This Self- Certification will not apply if any substantial modifications are made to the project. You agree to contact the Department for review of any plans to construct additional structures or to modify the project, as changes may result in a permit being required. You have acknowledged that this Self-Certification will automatically expire if: 1. construction of the project is not completed by midnight, July 25, 2021, unless construction commenced or a contract to construct was executed before July 25, 2021, in which case the time limit for completing the work authorized by the SPGP ends at midnight, July 25, 2022. However, in no case can construction continue for more than one year beyond the Self-Certification date; 2. site conditions materially change; 3. the terms, conditions, and limitations of the Self-Certification are not followed; or 4. the governing statutes or rules are amended before construction of the project. Completion of the Self-Certification constitutes your authorization for Department or Corps personnel to enter the property for purposes of inspecting for compliance. If you have any questions,please contact your local Department District Office. Contact information can be found at: http://www.dep.state.fl.us/water/wetlands/dots/sler_contacts.pdf. For further information, contact the Corps directly at: http://www.saj.usace.army.mil/N4issions/Regulatory.aspx. When referring to your project, please use the SPGP Self-Certification file number listed above. Authority for review- an agreement with the U.S. Army Corps of Engineers entitled Coordination Agreement between the U. S. Army Corps of Engineers (Jacksonville District) and the Florida Department of Environmental Protection State Programmatic General Permit, Section 10 of the Rivers and Harbor Act of 1899 and Section 404 of the Clean Water Act. FILE COPY ADDITIONAL INFORMATION This Self-Certification Process does not relieve-you from the responsibility of obtaining other permits or authorizations from other agencies (federal, state, Water Management District, or local)that may be required for the project. Failure to obtain all applicable authorizations prior to construction of the may result in enforcement. project Y If you have any problems with the attached documents,please call the ERP Coordinator at (850) 245-8495 or by e-mailing us at ERP eAnns(aden.state.fl.us. Sincerely,Florida Department of Environmental Protection FILE COPY. ' ._ 50 MOUNTING OPTIONS: E F TOP MOUNT SIDE MOUNT za C A (A)2X 1/2"SS LAG BOLT 3 m 2"MN.I LENGTH x oO W U � ° L.. w � ZO \ �^ QQ I JZI \ 'r i o f Oz� Qp (D - -; '"Qw w (A� . ¢p�z pmx B �o= D CABLE ARRANGEMENT OPTIONS: o NOTE:LOAD SHOULD BE EVENLY DISTRIBUTED BY � lz BUNKS POSITIONING THE CENTER OF GRAVITY DIRECTLY DOUBLE PULL �Q ALUMINUM-STANDARD -'U Z CARPETED WOOD-OPTIONAL IN THE CENTER OF HE LIFTING BEAMS AS SHOWN ?�x O IN THE ILLUSTRZATION ABOVE, w a-O Bow to Stem Port To Starboard a Four imin"g Lifts (Ousidde To Outside) (Center To Center), :[ U C3 O 5,000•Ib. N 12116in tOft �pm 7,000 Ib. 12ft6in 12ft6in ® NCO 10,000Ib. 12ft6in 12ft6in m')z t]-i 12ft6in 12ft61n �wQ 16,000 Ib. 12ft6in 12ft6in Z N V) 4 PILRJG BOAT LIFT SPEMICATIOhJ SHEET Cradle Mi imum Top Beam Cabo H P.Motor' Yelorit�Pea 20T8 Top Beam[A j Length Cradle Bcasr(B) Beam' Bucks(C j C54le Size (D] ���� `Drive.-(E I (p] Drive SbaFl Pifins(Six 6 "Travel Length Pon R4lI Min. 1. t 7"HI+2-11U'IV112.541PPF' 12It 4in 2"-5"(7.02PPFI Cft Gin 9-Atvr.mm 6it6"SL7it91.217"1 ❑mNePu7 DIRECT 7Hp(4T.21 11t2"[Seh4D1 t0"IQtg41 :91t � 22' E I 22DH&S,A EACH ® ENGINEERS SEAL PH:800-325-1116 NAME DATE TITL FAX:252-747-4377 PAUL WELCH INC. (LING BOAT LIFT s TIDETAMER.COM DRAWN ACC 5-15-15 NECM4NICAL F x••acA Crm EwamrEgAma IFICATION SHEET P.O.BOX ILL,NC 8 1984£�W.AwrI-ucn-,FL l/TE4 1tldd6>fEa1FR®?'d'f FijID1IeI�TS SNOW HILL,NC 28580 CHECKED ������� UNLESS OTHERWISE SPECIFIED: ENG APPR. ?lPJ 785-9B89PWMLCNWC0A0LC0M PROPRIETARY AND CONFIDENTIAL PAIL WEGars,P.F—FLA LIC NO.29945 DIMENSIONS ARE IN INCHES COMMENTS: SIZE DWG. NO. REV THE INFORMATION CONTAINED IN THIS TOLERANCES: DRAWING IS THE SOLE PROPERTY OF FRACTIONAL± ENGINEERING TIDE TAMER INDUSTRIES.ANY ANGULAR:MACH± BEND± REPRODUCTION IN PART OR AS A WHOLE TWO PLACE DECIMAL ± WITH OUT THE WRITTEN PERMISSION OF THREE PLACE DECIMAL ± *'---�WOV j t o �o�U SCALE:AS NOTED SHEET 1 OF 1 TIDE TAMER INDUSTRIES IS PROHIBITED. DO NOT SCALE DRAWING 5 4 3 2 1