Loading...
HomeMy WebLinkAboutTermite Treatment d. r Planning Development Services Building &Code Regulation Division 2300 Virginia Ave !Fort Pierce, FL 34962 ' 772-462-2172 Fags 772.462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SGIL TREATMENT PERMIT #: l'1 Da - a l I�r, 70E ADDRESS: ��l BUILDER/CONTRACTOR. _�auAe�n Poop r PEST CONTROL CONTRACTOR: EVICT-A-BUG TERMITE&PEST CONTROL INC. PEST CONTROL LICENSE #:JB17ST76 We, the undersigned, hereby certify,that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association, ��ti Square feet If area treated:366 Chemicals used: BASELINE Percentage of solution: .06%u Total gallons used: Date of Treatment: r Z? l Time of Treatment: Footing - --- Slab � - -- - -- - — - ist Treatment 1st Treatment Re-Treat Re-Treat Driveway Pools —1st Treatment_1St Treatment Re-Treat Re-Treat Other Perimeter for Final I Edon ISrTreatment Re-Treat Signature of Exterminator Date !vote: There must be a completed form for each requ/red treatment or re-treatment and this form must be on me,/ob site to be picked up by the inspector at time of each Inspection or the scheduled Inspection MY fall and a re-Inspection fee charged. FBC104.2.6 Cerf/frcate of Protectlive 7'eatment far prevention of termites A weather resistant jobslte posting board shall be provided to recelve duplicate Treatment Certificates as each requlred protective treatment Is completed, providing a copy for the person the permit Is Issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, Identity of the applicator, time and date of the treatment,site location, area treated,chemical used,percent concentration and number ofgallons used, to establish a vedflable record of protective treatment. If the loll chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final bulld/ng approval. St Lucia(County requires for the final inspection for Co,a Permanent Sticker to be planed on the electrical panel box cover, listing all the treatments and dates of applOcations. Revised 7/24/2014