HomeMy WebLinkAboutCreekside Lot 114 Column 2nd lift-not ready.pdf2 -M" I V '- E A,L
31ENGINEERAM SClr-f?Cr=s
INSPECTION RESULTS
Inspection Date: l I a l Permit No. a 1 d - d e 3 7
Project:
9 Address: _ O tiL�
Check one:
XRegular inspection:
O Reinspection Date of Initial Inspection: Fr - I / "C9
Inspection Type Requested (check):
MECHANICAL
Slab floor Rough-►n RouB h-in �V�s[I-In
Masonryh-In
Stack Piping & Test
Steam Piping & 7t
HW Piping & Test
Wall/Ceilin5MService/Ground
ugh -in
Water Piping & Test
CHW Pipin &Ter
Framinger
Gas Piping & Test
Cond, piping & Tes
Structuralund
Storm Piping & Test
nsulatSheet
RockEquimentWail
&Ceiline
Final Electrical Final Plumbing Final
Other Inspection Type:
Area Inspected/Code: _ ( �? — r__,el_ i A �f,M,., M
Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions
❑ DP -Disapproved XNot Ready
Conditions/Comments: &Qo_z
1.
2.
3.
4.
5.
6.
7.
❑ DA-Disallowed
Inspector's Name:
OFFICES THROUGHOUT FLORIDA
607 N W Co d"t C P
mimo y ove, ort St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com