Loading...
HomeMy WebLinkAboutCreekside Lot 114 Column 2nd lift-not ready.pdf2 -M" I V '- E A,L 31ENGINEERAM SClr-f?Cr=s INSPECTION RESULTS Inspection Date: l I a l Permit No. a 1 d - d e 3 7 Project: 9 Address: _ O tiL� Check one: XRegular inspection: O Reinspection Date of Initial Inspection: Fr - I / "C9 Inspection Type Requested (check): MECHANICAL Slab floor Rough-►n RouB h-in �V�s[I-In Masonryh-In Stack Piping & Test Steam Piping & 7t HW Piping & Test Wall/Ceilin5MService/Ground ugh -in Water Piping & Test CHW Pipin &Ter Framinger Gas Piping & Test Cond, piping & Tes Structuralund Storm Piping & Test nsulatSheet RockEquimentWail &Ceiline Final Electrical Final Plumbing Final Other Inspection Type: Area Inspected/Code: _ ( �? — r__,el_ i A �f,M,., M Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions ❑ DP -Disapproved XNot Ready Conditions/Comments: &Qo_z 1. 2. 3. 4. 5. 6. 7. ❑ DA-Disallowed Inspector's Name: OFFICES THROUGHOUT FLORIDA 607 N W Co d"t C P mimo y ove, ort St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com