HomeMy WebLinkAboutCreekside Lot 114 Bond Beam 2nd lift-not ready.pdfENGINEERING SCIENCES
/1 k/
INSPECTION RESULTS
Inspection Date: ` 1 I — / Permit No. a l & -J y- 0 8- 3
Project: 11
Address: /
Check one:
N( Regular inspection:
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
PLUMBING
rocung
unaergrouna
I I unaergrounci
Dud Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping 8& Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
I Final Plumbing
Final Mechanical
Other Inspection Type:
Y /1
Area Inspected/Code:
Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
XDP-Disapproved Not Ready
Conditions/Comments:
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: ! ::. i_ \ !� IX to joIZ4, Lic.#i: _ I �/ V l / ��✓
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 - (772) 924-3580 (fax)
www.teamgfa.com