Loading...
HomeMy WebLinkAboutCreekside Lot 114 Bond Beam 2nd lift-not ready.pdfENGINEERING SCIENCES /1 k/ INSPECTION RESULTS Inspection Date: ` 1 I — / Permit No. a l & -J y- 0 8- 3 Project: 11 Address: / Check one: N( Regular inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): PLUMBING rocung unaergrouna I I unaergrounci Dud Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping 8& Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical I Final Plumbing Final Mechanical Other Inspection Type: Y /1 Area Inspected/Code: Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed XDP-Disapproved Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name: ! ::. i_ \ !� IX to joIZ4, Lic.#i: _ I �/ V l / ��✓ OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 - (772) 924-3580 (fax) www.teamgfa.com