HomeMy WebLinkAboutCreekside Lot 76 Sewer Connect.pdfI�jtWER,
-ENGINEERING SCIENCES
INSPECTION RESULTS
inspecli
Project:
Address:
Check one:
XRegular Inspection:
mit No. a �-1101
❑ Reinspection Date of Initial Inspection: 37 /�
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -in
Rough -in
Steam Piping & Te.
Masonry
Wall Rough -in
Stack Piping &Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -in
Water Piping & Test
CHW piping & Test
Framing
Panel/Feeder
Gas Piping & Test
I Cond. Piping & Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
I Wail & Ceilinp
Final Building I f Final Electrical I I Final Plumbing I I Final Mechanical
Other Inspection Type:
Area Inspected/Code:
Inspection Results:*AP-Approved ❑ AE-Approved with Exceptions 0 DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments:
1.
2.
3.
4.
5.
6.
7.
Inspectors Name:E� 6_6e4Lic4l:►J X-) Z 7 57S�
v OFFICES THROUGHOUT FLORIDA
607 I4W Commodity Cove, Port St. Lucie, Florida 34986 - (772) 924-3575 • (772) 9243580 (fax)
www.teamgfa.com