Loading...
HomeMy WebLinkAboutCreekside Lot 94 Eufer.pdfENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: Permit No. 3 1 Project: CA,2,9_ Address: 3_� a Dvr oD D'Q� Check one: )K Regular Inspection: O Reinspection Date of Initial Inspection: Inspection Type Requested (check): p C a BUILDING/STRUcruRAL ELEcrRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofine I iehtine Protection Equipment I I Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type Area Inspected/Code: I©3 Inspection Results:,lel AP -Approved 0 AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved CJ Not Ready Conditions/Comments: 1. 2. 3. 4. S. 6. 7. yy�� Inspector's Name: Lic..: AM OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com