HomeMy WebLinkAboutCreekside Lot 1 UG Plumbing.pdfR3 U M V V L9 It 8� A L--
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: 80 — / U
Project: 4
Address: 3 y A -7 TA
Check one:
XRegular Inspection:
❑ Reinspection
Permit No.
)/y5 - o 97a
Date of Initial Inspection:
Inspection Type Requested (check):
Bt1tLDiNGjS7RtifCfuRAt iiECFRItAl _ _ PIIIMRINf. —_ —
s:..:uDucRoughIn
oor Rough -In
Rough -In
team Piping & Tes
all Rough -In
Stack Piping &Test
HW Piping&Test
k;M4FJxtures
iling Rough -in
Water Piin& Test
CHW Piping & Test
nel/Feeder
Gas Pipin&Test
Cond. Piping &Test
rvice/Ground
Storm Piping & Test
Insulation
pliance/Equipment
Fixtures
Final Building I I Final Electrical Final Plumbing Final Mechanical
Other Inspection Type:
Area Inspected/Code: a%
Inspection Results:XAP-Approved ❑ AE-Approved with Exception ❑ DA-Disallowed
0 DP -Disapproved ❑ Not Ready
Condit ions/Comments:
1.
2.
3.
4.
5.
6.
7.
Inspector's Name:
Licit:
J OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.team¢fa.com