Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Creekside Lot 1 Temp Toilet.pdf
DU IRV f; VvE Eft ELL Ek,GWEERIING SCIENCES INSPECTION RESULTS Inspection Date: �JV �� Permit No. Project: Address: 3 4/ zn__t� a/o.S'- U Ff70 Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL I JELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -in Slab Floor Rough -in Rough -in Steam Piping & Te Masonry Wall Rough -in Stack Piping & Test HW Piping &Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping &Test Framing Panel/Feeder Gas Piping & Test C_- - Piping & Tesi Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall &Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type Area Inspected/Code: 4/J .7 l c7f SCO Inspection Resultsj(AP-Approved D AE-Approved with Exceptions 0 DA-Disallowed ❑ DP -Disapproved O Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name: Lic.#: L-A) q�� 5r u OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St, Lucie, Florida 34986 • (772) 924-3575 - (772) 924-3580 (fax) www.teamefa.com