Loading...
HomeMy WebLinkAboutCreekside Lot 10 Sewer Connect.pdf2 3ENGWEERING SCIENCES 119SPECTION RESULTS Inspection Date: 1� —1 U - pl Permit No. Project: v ,,(� Address: c/ Y D i I � Ati�rJ Check one: XRegular Inspection: 14:-�tinl D Reinspection Date of Initial Inspection: S--//D -- R) Inspection Type Requested (check): ELECTRICAL o c / Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW piping &Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW piping & Tesi Framing Panel/Feeder Gas Piping & Test Cond. Piping &Test Structural Service/Ground Storm Piping & Test insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Eauioment ..:____. Final Other Inspection Type: Final Final Final Mechanical Area Inspected/Code: I a -5— S (sPJI C,A M D iel" Inspection Results:IKAP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved El Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name: J Lic.fi: 6) VV OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com