Loading...
HomeMy WebLinkAboutCreekside Lot 47 Bond Bem-2nd Lift.pdfL�L V?L a E`Lc, ,ENGINEERING SCIENCES [o t L 7 INSPECTION RESULTS Inspection Date: / Permit No Project: 2 Address: AIa3-09�33 Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection: 01 / Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW piping & 7es- Wall/Ceiling Ceiling Rough -In Water Piping & Test CHVd Piping V. Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & 7est Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofine I aphtine Protection I Equpment I Ic ..: Final Building f Final Electrical Final Plumbing i Final Mechanical Other Inspection Type: > � L Area Inspected/Code: / P AAA' ✓f Inspection Results:XAP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. S. 6. 7. Inspector's Name: /(��� �- I�t�C[r Lic.#1: )5,�J y 9 sal OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 9243580 (fax) www.teamefa.com