HomeMy WebLinkAboutCreekside Lot 47 Bond Bem-2nd Lift.pdfL�L V?L a E`Lc,
,ENGINEERING SCIENCES
[o t L 7
INSPECTION RESULTS
Inspection Date: / Permit No
Project: 2
Address:
AIa3-09�33
Check one:
Regular Inspection:
❑ Reinspection
Date of Initial Inspection:
01 /
Inspection Type Requested
(check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW piping & 7es-
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHVd Piping V. Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & 7est
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofine
I aphtine Protection I
Equpment I
Ic ..:
Final Building f Final Electrical Final Plumbing i Final Mechanical
Other Inspection Type:
> � L
Area Inspected/Code: / P AAA' ✓f
Inspection Results:XAP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments:
1.
2.
3.
4.
S.
6.
7.
Inspector's Name: /(��� �- I�t�C[r Lic.#1: )5,�J y 9 sal
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 9243580 (fax)
www.teamefa.com