Loading...
HomeMy WebLinkAboutEnergy Code0 o Florida Energy Efficiency Code For Building Construction Florida Department of Community Affairs EnergyGauge Summit® Fla/Com-2008, Effective: March 1, 2009 -- Form 40OA-2008 Method A: Whole Building Performance Method11for Commercial Buildings, Short Desc: GENESIS Owner: Addressl: U.S. HWY. #1 Address2: PROJECT SUMMARY Description: GENESIS COMMUNITY City: State: Zip: Type: Religious Building Class: Jurisdiction: PORT ST LUCIE, ST LUCIE COUNTY, FL (661200) Conditioned Area: 6742 SF Conditioned & UnConditioned Area: No of Stories: 1 Area entered from Plans Permit No: 0 Max Tonnage If different, write in: ,or - 9 20 PORT ST.LUCIE FLhere 0 New Finished building 6742 SF 0 SF 9.2 EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009 8/31/2009 Page 1 of 8 Compliance Summary Component Design Criteria Result Gross Energy Cost (in $) 15,948.0 16,260.0 PASSED LIGHTING CONTROLS EXTERNAL LIGHTING HVAC SYSTEM PLANT WATER HEATING SYSTEMS PIPING SYSTEMS Met all required compliance from Check List? PASSES PASSES PASSES None Entered PASSES None Entered Yes/No/NA IMPORTANT MESSAGE Info 5009 -- -- -- An input report of this design building must be submitted along with this Compliance Report ,r 8/31/2009 EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009 Page 2 of 8 CERTIFICATIONS I hereby certify that the plans and pecifications cover y this calculation are in compliance with the y Florida Energy Code Prepared By: _P/ Building Official: Date Date: I certify that this building is in compliance with the FLorida Energy Efficiency Code Owner Agent: Date: If Required by Florida law, I hereby certify (*) that the system design is in compliance with the FLorida Energy Efficiency Code Architect: Reg No: Electrical Designer: Reg No: Lighting Design : Reg No: Mechanical Designer. v Reg No: oC Plumbing Design�/f Reg No: (*) Signature is required where Florida Law requires design to be performed by registered design professionals. r. V r EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009 Page 3 of 8 Project: GENESIS Title: GENESIS COMMUNITY CHURCH Type: Religious Building (WEA File: FL_ST_LUCIE_CO_INTL.tm3) Building End Uses I)Proposed 2) Baseline Total I,080.00 1,285.10 $15,948 $19,129 ELECTRICITY(MBtu/kW 1,080.00 1,285.10 h/$) 316425 376563 $15,948 $19,129 AREA LIGHTS 57.50 169.10 16843 49550 $849 $25517 MISC EQUIPMT 33.70 33.70 9878 9878 $498 $502 PUMPS & MISC 0.30 0.10 86 30 ��J $2 SPACE COOL 4 '.00 575.50 't 209 168632 6,512 $8,567 SPACE HEAT 201.60 117.60 59070 34461 $2,977 $1,751 VENT FANS 345.90 389.10 101339 114012 $5,107 $5,792 Passing requires Proposed Building cost to be at most 85% PASSES of Baseline cost. This Proposed Building is at 83.4% r. w{ 8/31/2009 EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009 Page 4 of 8 C. *1 Project: GENESIS Title: GENESIS COMMUNITY CHURCH Type: Religious Building (WEA File: FL ST LUCIE CO INTL.tm3) External Lighting Compliance Description Category Tradable? Allowance Area or Length ELPA CLP (W/Unit) or No. of Units (W) (W) (Sgft or ft) Ext Light 1 Main entries Yes 30.00 20.0 600 40 Tradable Surfaces: 40 (W) Allowance for Tradable: 600 (W) PASSES All External Lighting: 40 (W) Project: GENESIS Title: GENESIS COMMUNITY CHURCH Type: Religious Building (WEA File: FL ST LUCIE CO INTL.tm3) Lighting Controls Compliance Acronym Ashrae Description Area Design Min Compli- ID (sq.ft) CP CP ance PrOZo1Sp1 24,001 Worship -Pulpit, Choir 1,450 1 1 PASSES PrOZo2Spl 24,001 Worship -Pulpit, Choir 1,493 1 1 PASSES PrOZo3Sp1 24,001 Worship -Pulpit, Choir 3,798 2 2 PASSES PASSES 8/31/2009 EnergyGauge Summit@ Fla/Com-2008. Effective: March 1, 2009 Page 5 of 8 A. Project: GENESIS Title: GENESIS COMMUNITY CHURCH Type: Religious Building (WEA File: FL_ST_LUCIE_CO_INTL.tm3) System Report Compliance PrOSyl System 1 Constant Volume Packaged No. of Units System 1 Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 13.00 12.00 8.00 PASSES < 65000 Btu/h Cooling Capacity Heating System Electric Furnace 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 0.80 0.90 PASSES System -Supply Constant Volume PrOSy2 System 2 Constant Volume Packaged No. of Units System 1 Component Category Capacity Design Eff Design l PLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 13.00 12.00 8.00 PASSES < 65000 Btu/h Cooling Capacity Heating System Electric Furnace 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 0.80 0 0 PASSES System -Supply Constant Volume Munstant PrOSy3 System 3 Volume Packaged No. of Units System 1 Component Catego Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 10.60 10.30 8.00 PASSES 65000 to 135000 Btu/h Cooling Capacity Heating System Electric Furnace 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 0.80 0.90 PASSES System -Supply Constant Volume PrOSy4 System 4 Constant Volume Packaged No. of Units System 1 Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance "Jr EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009 8/31/2009 Page 6 of 8 Cooling System Heating System Air Handling System -Supply Air Conditioners Air Cooled 10.60 10.30 65000 to 135000 Btu/h Cooling Capacity Electric Furnace 1.00 1.00 .Air Handler (Supply) - 0.80 0.90 Constant Volume 8.00 PASSES PASSES PASSES PASSES Jll Plant Compliance Description Installed Size Design Min Design Min Category Comp No Eff Eff IPLV IPLV liance None Project: GENESIS Title: GENESIS COMMUNITY CHURCH Type: Religious Building (WEA File: FL ST LUCIE CO INTL.tm3) Water Heater Compliance Description Type Category Design Min Eff Eff Design Max Comp Loss Loss liance Water Heater 1 Electric water heater <= 12 [kW] 0.90 0.86 e PASSES PASSES Pi g S to _ ompliance Category I—np'e Operating Ins Cond Ins Req Ins Compliance e out? Temp [Btu-in/hr Thick [in] Thick [in] [F] .SF.F] None Y. "r EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009 8/31/2009 Page 7 of 8 A: GENESIS GENESIS COMMUNITY CHURCH Religious Building File: FL_ST_LUCIE_CO INTL.tm3) Other Required Compliance 11 Category Section Requirement (write N/A in box if not applicable) Check 11 Report Operations Manual Windows & Doors 13-101 13-102.1, 13-410,13-413 13-406.AB.1.1 Joints/Cracks 13406.AB.1.2 Dropped Ceiling Cavity 13406.AB.3 System 13407 Reheat 13407.B HVAC Efficiency 13-407, 13-408 HVAC Controls 13407.AB.2 Ventilation Controls 13-409.AB.3 ADS f4.LYT4011m, Balancing Piping Insulation Water Heaters Swimming Pools Hot Water Pipe Insulation Water Fixtures Motors Lighting Controls 8/31/2009 13-410 13-410.AB 13-410.AB.4 13-41 LAB 13-412.AB Input Report Print -Out from EnergyGauge FlaCom attached Operations manual provided to owner Glazed swinging entrance & revolving doors: max. 1.0 cfnvftl; all other products: 0.4 cfim/ft' To be caulked, gasketed, weather-stripped or otherwise sealed Vented: seal & insulated ceiling. Unvented seal & insulate roof & side walls HVAC Load sizing has been performed Electric fesistance reheat prohibited Minimum efficiences: Cooling Tables 13407.AB.3.2.1A-D; Heating Tables 13-407.AB.3.2.1B, 13-407.AB.3.2.1D, 13-408.AB.3.2.1E, 13-408.AB.3.2F Zone controls prevent reheat (exceptions); simultaneous heating and cooling in each zone; combined HAC deadband of at least 50F (exceptions) Motorized dampers reqd, except gravity dampers OK in: 1) exhaust systems and 2) systems with design outside air intake or exhaust capacity <_300 cfm Duct sizing and Design have been performed Air ducts, fittings, mechanical equipment & plenum chambers shall be mechanically attached, sealed, insulated & installed per Sec. 13-410 Air Distribution Systems HVAC distribution system(s) lanced. Report in construction documents In accordance P& with Table 13-412.AB.3. 13-412. ver , eated swimming pools: Time switch (exceptions); �essible on/off switch 13-41 LAB. a 13-41 LAB.2 for circulating systems, first 8 feet of outlet pipe from storage tank and between inlet pipe and heat trap 13-412.AB.2.5 Shower hot water flow restricted to 2.5 gpm at 80 psi. Public lavatory fixture how water flow 0.5 gpm max; if self -closing valve 0.25 gallon recirculating, 0.5 gallon non recirculating 13414 Motor efficiency criteria have been met 13415.AB Automatic control required for interior lighting in buildings >5,000 s.f.; Space control; Exterior photo sensor; Tandom wiring with 1 or 3 linear fluuorescent lamps>30W EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009 0 Page 8 of 8