Florida Energy Efficiency Code For Building Construction
Florida Department of Community Affairs
EnergyGauge Summit® Fla/Com-2008, Effective: March 1, 2009 -- Form 40OA-2008
Method A: Whole Building Performance Method11for Commercial Buildings,
Short Desc: GENESIS
Owner:
Addressl: U.S. HWY. #1
Address2:
PROJECT SUMMARY
Description: GENESIS COMMUNITY
City:
State:
Zip:
Type: Religious Building Class:
Jurisdiction: PORT ST LUCIE, ST LUCIE COUNTY, FL (661200)
Conditioned Area: 6742 SF Conditioned & UnConditioned Area:
No of Stories: 1 Area entered from Plans
Permit No: 0 Max Tonnage
If different, write in:
,or - 9 20
PORT ST.LUCIE
FLhere
0
New Finished building
6742 SF
0 SF
9.2
EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009
8/31/2009
Page 1 of 8
Compliance Summary
Component Design Criteria Result
Gross Energy Cost (in $) 15,948.0 16,260.0 PASSED
LIGHTING CONTROLS
EXTERNAL LIGHTING
HVAC SYSTEM
PLANT
WATER HEATING SYSTEMS
PIPING SYSTEMS
Met all required compliance from Check List?
PASSES
PASSES
PASSES
None Entered
PASSES
None Entered
Yes/No/NA
IMPORTANT MESSAGE
Info 5009 -- -- -- An input report of this design building must be submitted along with this
Compliance Report
,r
8/31/2009
EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009
Page 2 of 8
CERTIFICATIONS
I hereby certify that the plans and pecifications cover y this calculation are in compliance with the
y Florida Energy Code
Prepared By: _P/ Building Official:
Date Date:
I certify that this building is in compliance with the FLorida Energy Efficiency Code
Owner Agent: Date:
If Required by Florida law, I hereby certify (*) that the system design is in compliance with the FLorida
Energy Efficiency Code
Architect: Reg No:
Electrical Designer: Reg No:
Lighting Design : Reg No:
Mechanical Designer. v Reg No: oC
Plumbing Design�/f Reg No:
(*) Signature is required where Florida Law requires design to be performed by registered design
professionals.
r.
V r EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009
Page 3 of 8
Project: GENESIS
Title: GENESIS COMMUNITY CHURCH
Type: Religious Building
(WEA File: FL_ST_LUCIE_CO_INTL.tm3)
Building End Uses
I)Proposed
2) Baseline
Total
I,080.00
1,285.10
$15,948
$19,129
ELECTRICITY(MBtu/kW
1,080.00
1,285.10
h/$)
316425
376563
$15,948
$19,129
AREA LIGHTS
57.50
169.10
16843
49550
$849
$25517
MISC EQUIPMT
33.70
33.70
9878
9878
$498
$502
PUMPS & MISC
0.30
0.10
86
30
��J
$2
SPACE COOL
4 '.00
575.50
't 209
168632
6,512
$8,567
SPACE HEAT
201.60
117.60
59070
34461
$2,977
$1,751
VENT FANS
345.90
389.10
101339
114012
$5,107
$5,792
Passing requires Proposed Building cost to be at most 85%
PASSES
of Baseline cost. This Proposed Building
is at 83.4%
r.
w{
8/31/2009
EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009
Page 4 of 8
C.
*1
Project: GENESIS
Title: GENESIS COMMUNITY CHURCH
Type: Religious Building
(WEA File: FL ST LUCIE CO INTL.tm3)
External Lighting Compliance
Description Category Tradable? Allowance Area or Length ELPA CLP
(W/Unit) or No. of Units (W) (W)
(Sgft or ft)
Ext Light 1 Main entries Yes 30.00 20.0 600 40
Tradable Surfaces: 40 (W) Allowance for Tradable: 600 (W) PASSES
All External Lighting: 40 (W)
Project: GENESIS
Title: GENESIS COMMUNITY CHURCH
Type: Religious Building
(WEA File: FL ST LUCIE CO INTL.tm3)
Lighting Controls Compliance
Acronym Ashrae
Description
Area
Design Min Compli-
ID
(sq.ft)
CP CP ance
PrOZo1Sp1 24,001
Worship -Pulpit, Choir
1,450
1 1 PASSES
PrOZo2Spl 24,001
Worship -Pulpit, Choir
1,493
1 1 PASSES
PrOZo3Sp1 24,001
Worship -Pulpit, Choir
3,798
2 2 PASSES
PASSES
8/31/2009
EnergyGauge Summit@ Fla/Com-2008. Effective: March 1, 2009
Page 5 of 8
A.
Project: GENESIS
Title: GENESIS COMMUNITY CHURCH
Type: Religious Building
(WEA File: FL_ST_LUCIE_CO_INTL.tm3)
System Report Compliance
PrOSyl System 1
Constant Volume Packaged
No. of Units
System
1
Component
Category
Capacity
Design Eff Design
IPLV Comp-
Eff Criteria IPLV Criteria liance
Cooling System
Air Conditioners Air Cooled
13.00 12.00 8.00
PASSES
< 65000 Btu/h Cooling
Capacity
Heating System
Electric Furnace
1.00 1.00
PASSES
Air Handling
Air Handler (Supply) -
0.80 0.90
PASSES
System -Supply
Constant Volume
PrOSy2 System 2
Constant Volume Packaged
No. of Units
System
1
Component
Category
Capacity
Design Eff Design
l PLV Comp-
Eff Criteria IPLV Criteria liance
Cooling System
Air Conditioners Air Cooled
13.00 12.00 8.00
PASSES
< 65000 Btu/h Cooling
Capacity
Heating System
Electric Furnace
1.00 1.00
PASSES
Air Handling
Air Handler (Supply) -
0.80 0 0
PASSES
System -Supply
Constant Volume
Munstant
PrOSy3 System 3
Volume Packaged
No. of Units
System
1
Component
Catego
Capacity
Design Eff Design
IPLV Comp-
Eff Criteria IPLV Criteria liance
Cooling System
Air Conditioners Air Cooled
10.60 10.30 8.00
PASSES
65000 to 135000 Btu/h
Cooling Capacity
Heating System
Electric Furnace
1.00 1.00
PASSES
Air Handling
Air Handler (Supply) -
0.80 0.90
PASSES
System -Supply
Constant Volume
PrOSy4 System 4
Constant Volume Packaged
No. of Units
System
1
Component
Category
Capacity
Design Eff Design
IPLV Comp-
Eff Criteria IPLV Criteria liance
"Jr EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009
8/31/2009 Page 6 of 8
Cooling System
Heating System
Air Handling
System -Supply
Air Conditioners Air Cooled 10.60 10.30
65000 to 135000 Btu/h
Cooling Capacity
Electric Furnace 1.00 1.00
.Air Handler (Supply) - 0.80 0.90
Constant Volume
8.00 PASSES
PASSES
PASSES
PASSES Jll
Plant Compliance
Description
Installed Size Design Min Design Min Category Comp
No Eff Eff IPLV IPLV liance
None
Project: GENESIS
Title: GENESIS COMMUNITY CHURCH
Type: Religious Building
(WEA File: FL ST LUCIE CO INTL.tm3)
Water Heater Compliance
Description
Type Category Design Min
Eff Eff
Design Max Comp
Loss Loss liance
Water Heater 1
Electric water heater <= 12 [kW] 0.90 0.86
e
PASSES
PASSES
Pi g S to _ ompliance
Category
I—np'e Operating Ins Cond Ins Req Ins Compliance
e out? Temp [Btu-in/hr Thick [in] Thick [in]
[F] .SF.F]
None
Y.
"r EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009
8/31/2009 Page 7 of 8
A: GENESIS
GENESIS COMMUNITY CHURCH
Religious Building
File: FL_ST_LUCIE_CO INTL.tm3)
Other Required Compliance
11 Category Section Requirement (write N/A in box if not applicable) Check 11
Report
Operations Manual
Windows & Doors
13-101
13-102.1,
13-410,13-413
13-406.AB.1.1
Joints/Cracks 13406.AB.1.2
Dropped Ceiling Cavity 13406.AB.3
System 13407
Reheat 13407.B
HVAC Efficiency 13-407, 13-408
HVAC Controls 13407.AB.2
Ventilation Controls 13-409.AB.3
ADS
f4.LYT4011m,
Balancing
Piping Insulation
Water Heaters
Swimming Pools
Hot Water Pipe
Insulation
Water Fixtures
Motors
Lighting Controls
8/31/2009
13-410
13-410.AB
13-410.AB.4
13-41 LAB
13-412.AB
Input Report Print -Out from EnergyGauge FlaCom attached
Operations manual provided to owner
Glazed swinging entrance & revolving doors: max. 1.0 cfnvftl; all
other products: 0.4 cfim/ft'
To be caulked, gasketed, weather-stripped or otherwise sealed
Vented: seal & insulated ceiling. Unvented seal & insulate roof &
side walls
HVAC Load sizing has been performed
Electric fesistance reheat prohibited
Minimum efficiences: Cooling Tables 13407.AB.3.2.1A-D;
Heating Tables 13-407.AB.3.2.1B, 13-407.AB.3.2.1D,
13-408.AB.3.2.1E, 13-408.AB.3.2F
Zone controls prevent reheat (exceptions); simultaneous heating
and cooling in each zone; combined HAC deadband of at least 50F
(exceptions)
Motorized dampers reqd, except gravity dampers OK in: 1) exhaust
systems and 2) systems with design outside air intake or exhaust
capacity <_300 cfm
Duct sizing and Design have been performed
Air ducts, fittings, mechanical equipment & plenum chambers shall
be mechanically attached, sealed, insulated & installed per Sec.
13-410 Air Distribution Systems
HVAC distribution system(s) lanced. Report in
construction documents
In accordance P&
with Table 13-412.AB.3.
13-412. ver , eated swimming pools: Time switch (exceptions);
�essible on/off switch
13-41 LAB. a 13-41 LAB.2 for circulating systems, first 8 feet of outlet
pipe from storage tank and between inlet pipe and heat trap
13-412.AB.2.5 Shower hot water flow restricted to 2.5 gpm at 80 psi. Public
lavatory fixture how water flow 0.5 gpm max; if self -closing valve
0.25 gallon recirculating, 0.5 gallon non recirculating
13414 Motor efficiency criteria have been met
13415.AB Automatic control required for interior lighting in buildings >5,000
s.f.; Space control; Exterior photo sensor; Tandom wiring with 1 or
3 linear fluuorescent lamps>30W
EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009