Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PHOTOVOLTAIC SYSTEM
PHOTOVOLTAIC SYSTEM CODES: CONSTRUCTION NOTES: THIS PROJECT COMPLIES WITH THE FOLLOWING: CONDUIT AND CONDUCTOR SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND 2020 7TH EDITION FLORIDA BUILDING CODE: BUILDING ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. 2020 7TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL 2020 7TH EDITION FLORIDA BUILDING CODE: MECHANICAL ALL SOLAR ENERGY SYSTEM EQUIPMENT SHALL BE SCREENED TO THE MAXIMUM EXTENT 2020 7TH EDITION FLORIDA BUILDING CODE: PLUMBING POSSIBLE AND SHALL BE PAINTED A COLOR SIMILAR TO THE SURFACE UPON WHICH THEY ARE 2020 7TH EDITION FLORIDA BUILDING CODE: FUEL GAS MOUNTED. 2020 7TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION 2020 7TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING MODULES SHALL BE TESTED , LISTED AND INDENTIFIED WITH FIRE CLASSIFICATION IN 2020 7TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY ACCORDANCE WITH UL 2703. SMOKE AND CARBON MONOXIDE ALARMS ARE REQUIRED PER 2017 NATIONAL ELECTRIC CODE (NEC) SECTION R314 AND 315 TO BE VERIFIED AND INSPECTED BY INSPECTOR IN THE FIELD. AS ADOPTED BY ST. LUCIE COUNTY DIG ALERT (811)TO BE CONTACTED AND COMPLIANCE WITH EXCAVATION SAFETY PRIOR TO ANY EXCAVATION TAKING PLACE PHOTOVOLTAIC SYSTEM GROUND WILL BE TIED INTO EXISTING GROUND AT MAIN SERVICE FROM DC DISCONNECT/INVERTER AS PER 2017 NEC SEC 250.166(A). VICINITY MAP: SOLAR PHOTOVOLTAIC SYSTEM EQUIPMENT WILL BE INSTALLED IN ACCORDANCE WITH REQUIREMENTS OF ART. 690 OF THE 2017 NEC E SYSTEM GROUNDING ELECTRODE CONDUCTOR FOR PV SYSTEM TO BE SIZED TO MEET THE Bartow s earcow sr IQPubrc swrage REQUIREMENTS OF 2017 NEC CLIENT: L PaarntiaLn ° THE EXISTING MAIN SERVICE PANEL WILL BE EQUIPPED WITH A GROUND ROD OR UFER Joseph J DONNA GOON Green Wise Landscape ' 654 PONYTAIL LANE,FORT PIERCE,FL Q Management Nursery 3 Bravo:A01410D 00 34982 Ga`tle"Ce"`° a SOLAREDGE OPTIMIZERS ARE LISTED TO IEC 62109-1 (CLASS II SAFETY)AND UL 1741 STANDARDS AHJ:ST.LUCIE COUNTY <P 000177CA32C5A UTILITY:FPL-FLORIDAPOWER&LIGHT eanara� aurotis Ln s p D0001228B R SYSTEM: - Columbine Accounting Services - SYSTEM SIZE(DC):20 x 350=7.000 kW 654 Ponytail Ln,Fort Buddy's Holiday Mobility Q • SYSTEM SIZE(AC):5.000 kW @ 240V Motor scooter denier Pierce,FL 34982 Digitally signed by Joseph POI:PV BREAKER TIES IN MSP Q AI—M.Or Alexendrie 0' Ponytail Ln J MODULES:20 x LONGI SOLAR: LR4-60HPB-350M Bravo:A01410D00000177C OPTIMIZERS:P401 Q Neves Crystal DVM - > INVERTER:SE5000H-US[SI1] A32C5AD0001228B � 0 el:rat Easy St Ea�"s' r,`�`' rea."=' EEaaYSr Date: 2021.07.2814:33:46 it Discount A Quality Fencing Inc REVISIONS: ience51ote —06r00r NO: DESCRIPTION DATE SITE LOCATION TABLE OF CONTENTS: PV-1 SITE LOCATION PV-2 SITE PLAN PV-2A ROOF PLAN WITH MODULES LAYOUT PV-2B STRUCTURAL CALCULATIONS PV-3 MOUNTING DETAILS '�' freedom PV-4 THREE LINE DIAGRAM �- F O R E V E R FREEDOM FOREVER FLORIDA LLC PV-5 CONDUCTOR CALCULATIONS 2619 CONSULATE DR SUITE 800,ORLANDO, FL 32819 PV-6 EQUIPMENT&SERVICE LIST Tel:(800)385-1075 PV-7 LABELS GREG ALBRI J�HT PV-7A SITE PLACARD ) i[p,( I�— PV-8 OPTIMIZER CHART U�"��"��II PV-9& 10 SAFETY PLAN CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 SITE LOCATION JOB NO: I DATE: DESIGNED BY: SHEET: F098661 7/27/2021 YS PV-1 LEGEND: Joseph J Digitally signed b Joseph J WIND SPEED: 152 Bravo:A01410 Bravo:A01410D00 ❑ OBSTRUCTION D000001 77CA 00177CA32C5AD 0 32C5AD00012 01228E O PIPE VENT Date:2021.07.28 28B 14:34:03-06'00' MODULES 57'-0" CONDUIT ® SETBACK — — — — AC] AC DISCONNECT MsP MSP 0 PB JUNCTION I 1 BOX 7'-N3" NN INVERTER I 1 uM UTILITY METER ROOF AREA:2678 SO FT CLIENT: DONNA GOUIN 654 PONYTAIL LANE,FORT PIERCE,FL 34982 AHJ:ST.LUCIE COUNTY UTILITY:FPL-FLORIDA POWER&LIGHT ROOF LINE PROPERTY LINE SYSTEM: SYSTEM SIZE(DC):20 x 350=7.000 kW SYSTEM SIZE(AC):5.000 kW @ 240V POI:PV BREAKER TIES IN MSP 00 1 o MODULES:20 x LONGI SOLAR: ih o in LR4-60HPB-350M I (E) MAIN SERVICE PANEL PTIMIZ P R:S 000H-US[SI1] I I REVISIONS: � NO: DESCRIPTION DATE - (E) UTILITY METER 15-5" 1 I a w NCC) I 1 M freedom F O R E V E R FREEDOM FOREVER FLORIDA LLC 2619 CONSULATE DR SUITE 800,ORLANDO, FL 32819 Tel:(800)385-1075 GREG ALBRIGHT 57'-0" CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 PONYTAIL LANE SITE PLAN 1 SCALE: 1/16" — 1 F_On SITE PLAN rF091661 NO DATE: DESIGNED BY: SHEET: 7/27/2021 YS PV-2 LEGEND: WIND SPEED: 152 PN�0 YUR%,�'', FL E N SF OBSTRUCTION TO No•86261 O PIPE VENT '* '* MODULES ��O STATE OF O R I - - CONDUIT ® By Yuri at 1:23:11 PM, 712812021 SETBACK This item has been digitally signed and sealed by CI Yurianto Yurianto on the date adjacent to the AC AC seal. Printed copies of this document are not DISCONNECT considered signed and sealed and the signature MSP MAIN SERVICE must be verified on any electronic copies. PANEL Di II si d 5y Va,aamvan— giia y DN:cn=V—unanio VA.—US Yurianto -M 410D00000176B07CBF25000 Je JUNCTION FIRE ACCESS Reon:lam iha aulM1or aphis BOX PATHWAYS (N)20 LONGI SOLAR: LR4-60HPB-350M Yurianto a1 Data:202-7-2813:23-05:00 INV INVERTER uM UTILITY METER ROOF AREA:2678 SQ FT CLIENT: DONNA GOUIN O 654 PONYTAIL LANE,FORT PIERCE,FL 34982 AHJ:ST.LUCIE COUNTY (N)JUNCTION BOX UTILITY:FPL-FLORIDAPOWER&LIGHT C0 SYSTEM: V-6" SYSTEM SIZE(DC):20 x 350=7.000 kW o O I SYSTEM SIZE(AC):5.000 kW @ 240V POI:PV BREAKER TIES IN MSP MODULES:20 x LONGI SOLAR: LR4-60HPB-350M O I OPTIMIZERS:P401 � ROOF LINE INVERTER:SE5000H-US[SI1] REVISIONS: NO: DESCRIPTION DATE FIRE ACCESS i a PATHWAYS L - - > z 0 freedom F O R E V E R FREEDOM FOREVER FLORIDA LLC 2619 CONSULATE DR SUITE 800,ORLANDO, FL 32819 Tel:(800)385-1075 GREG AEI-1 LBRIIGHT CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 ROOF PLAN NOTES: 1. EMT CONDUIT ATTACHED TO THE ROOF USING CONDUIT MOUNTS SCALE: 1/8" = V-0" 2. ATTACHED CLAMPS AT 25% FROM THE EDGE AND 50% FROM THE CENTER OF THE MODULES ROOF PLAN WITH MODULES LAYOUT 3. JUNCTION BOX IS MOUNTED TO THE RAIL. JOB NO: DATE: DESIGNED BY: SHEET: F098661 712712021 YS PV-2A ``I\111 1 111//,,' FL A!0 YVR!q��'�. `•`�JQ�, CENSF41 i * No.86261 '* ,0 STATE OF FtORIDp•'G��.� ,,',S,`/ZDNALE��`��` '/11111111%\ By Yuri at 1:23:13 PM, 7/28/2021 This item has been digitally signed and sealed by Yurianto Yurianto on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature STRUCTURAL CALCULATIONS: electronic must be verified on any copies. D9l iY Yurianto A-10D00000176,07.M., OOOA]A2 TOTAL ROOF AREA: 2678 SQ FT R°°s°°'°m1h°a°`h°'°""'s Yurianto a�-rt ARRAYCOVERAGE: 13.48% Date 2021- 281323-050 SYSTEM DISTRIBUTED WEIGHT: 2.31 LBS UNIRAC: FLASHKIT PRO POINT—LOAD: 23.15 LBS ROOF AREA STATEMENT CLIENT: DONNA GOUIN ROOF MODULE QUANTITY ROOF PITCH ARRAY PITCH AZIMUTH ROOF AREA ARRAY AREA 654 PONYTAIL LANE,FORT PIERCE,FL 34982 1 20 23' 23' 90, 947 SQ FT 361 SQ FT AHJ:ST.LUCIE COUNTY UTILITY:FPL-FLORIDA POWER&LIGHT SYSTEM: SYSTEM SIZE(DC):20 x 350=7.000 kW SYSTEM SIZE(AC):5.000 kW @ 240V POI:PV BREAKER TIES IN MSP MODULES:20 x LONGI SOLAR: LR4-60HPB-350M OPTIMIZERS:P401 INVERTER:SE5000H-US[SI1] REVISIONS: NO: DESCRIPTION DATE freedom F O R E V E R FREEDOM FOREVER FLORIDA LLC 2619 CONSULATE DR SUITE 800,ORLANDO, FL 32819 Tel:(800)385-1075 GREG ArL�B�RIIG+HT CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 STRUCTURAL CALCULATIONS JOB NO: DATE: DESIGNED BY: SHEET: F098661 7/27/2021 YS PV-2B MAX ATTACHMENT SPAN - 4' �,,�iI 0 YUrrr, FL •�JQ �`C E IV No.8626 '* LEL7EI1'YD — I STATE OF O R 1 D P ���� �.�`. tI/1111111\ Module (Roof Zones) By Yuri at 1:23:15 PM, 712812021 This item has been digitally signed and sealed by Yurianto Yurianto on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. Exposed Non-Exposed Yurianto cn= DigitaiiysignedbyYudanloYudanio DI: Yurianto Yurianto c=US o=Unaffiliated ou=A01410D000001 76B07CBF2500 ...2 R I Reason:I am tM1e author of this Yurianto do�at Dale:2021-07-28 1323-05:00 21 10 I I CLIENT: DONNA GOUIN I 1 I I 1 1 1 I I 1 I I I 1 654 PONYTAIL LANE,FORT PIERCE,FL 34982 AHJ:ST.LUCIE COUNTY UTILITY:FPL-FLORIDA POWER&LIGHT PARTIAL ROOF FRAMING PLAN Scale: NTS SYSTEM: SYSTEM SIZE(DC):20 x 350=7.000 kW SYSTEM SIZE(AC):5.000 kW @ 240V POI:PV BREAKER TIES IN MSP MODULES:20 x LONGI SOLAR: LR4-60HPB-350M 6 W, OPTIMIZERS:P401 ?i INVERTER:SE5000H-US[SI1] SFM MICRORAIL REVISIONS: NO: DESCRIPTION DATE SFM TRIMRAIL SFM MICRORAIL LONGI SOLAR. iz"M�N�Me�D LR4-60HPB 350M LR4-60HP6 350M LR4-60HPB-350M SFM SLIDER AND TRIMRAIL ROOF FLASHING ATTACHMENT ROOF/DECK MEMBRANE UNIRAC SLIDERS zs ROOF DECK/ zs MEMBRANE ROOF DECK MEMBRANE zs°MIN.EMBED. FLASHING zs MIN.eneeD. UNIRAC SLIDERS SFM TRIMRAIL 5/16"STAINLESS STEEL LAG FLASHING BOLT OR STRUCTURAL SCREW WITH 2-1/2"MIN.EMBEDMENT 5/16"STAINLESS STEEL AND FLAT WASHER LAG BOLT OR 2X4 TRUSS @ 24"O.C. STRUCTURAL SCREW freedom WITH 2-1/2"MIN. EMBEDMENT AND FLAT WASHER F O R E V E R BUILDING STRUCTURE FREEDOM FOREVER FLORIDA LLC BUILDING STRUCTURE N gEa. SFM SLIDER AND TRIMRAIL 2619 CONSULATE DR SUITE 800,ORLANDO, zs M�_EM ROOF ATTACHMENT FL 32819 FLASHING Tel:(800)385-1075 5/16"STAINLESS STEEL LAG GREG ALBRIGHT BOLT OR STRUCTURAL SCREW qq WITH MIN.EMBEDMENT 1 AND FLATLAT WASHER .yV� CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 SOLAR PV ARRAY SECTION VIEW ATTACHMENT DETAIL Scale: NTS Scale: NTS MOUNTING DETAILS JOB NO: I DATE: DESIGNED BY: SHEET: F098661 7/27/2021 YS PV-3 BACKFEED BREAKER SIZING MAX. CONTINUOUS OUTPUT 21A @ 240V Joseph J 21 X 1.25 = 26.25AMPS 30A BREAKER-OK Bravo:AO SEE 705.12 OF 2017 NEC Digitally signed ly 200 X 1.20 = 240 1410D00 Bravo A01410DO 000177 240 - 150 = 90A ALLOWABLE BACKFEED 000177C CA32C as Date:20AD021.07.2.28 A32C5AD 14:34:19-06'00' PV SYSTEM 0001228B 7.000 kW-DC 5.000 MAC CLIENT: DONNA GOUIN 654 PONYTAIL LANE,FORT PIERCE,FL 34982 AHJ:ST.LUCIE COUNTY (E)UTILITY METER UTILITY:FPL-FLORIDA POWER&LIGHT (E)200A RATED STRING-1 MAIN SERVICE PANEL 10 LONGI SOLAR: 1 PH,120/240V 60HZ LR4-60HPB-350M U SYSTEM: SYSTEM SIZE(DC):20 x 350=7.000 kW SYSTEM SIZE(AC):5.000 kW @ 240V POI:PV BREAKER TIES IN MSP SOLAREDGE P401 MODULES:20 x LONGI SOLAR: POWER OPTIMIZERS (E)150A/2P MAIN LR4-60HPB-350M 2-#10 AWG, BREAKER OPTIMIZERS:P401 --_r— (END FED) PV WIRE (N)30A 2P PV INVERTER:SE5000H-US[Sill / BREAKER (N)SOLAREDGE SE5000H-US[Sill I INVERTER REVISIONS: AC •� NO: DESCRIPTION DATE (N)30A RATED • STRING-2 AC DISCONNECT I 10 LONGI SOLAR: EATON DG221 URB •� LR4-60HPB-350M KNIFEBLADE,LOCKABLE, I j NEMA 3R,UL LISTED • I I JUNCTION ,}i TO UNDERGROUND BOX -—————— ---- --------- • �� FEED RAPID F— I 4-#10 AWG,THWN-2 SWITCH SHUTDOWN 1-#8 EGC,THWN-2 3-#10 AWG,THWN-2 3-#10 AWG,THWN-2 IN 3/4"OR 1-#8 EGC,THWN-2 1-#8 EGC,THWN-2 LARGER#N/A CONDUIT IN 3/4"OR LARGER#N/A IN 3/4"OR LARGER#N/A I I CONDUIT CONDUIT f:f SOLAREDGE P401 — �'\• freedom POWER OPTIMIZERS LLLJJJ F OREV E R 2-#10 AWG,PV WIRE 1-#6 AWG IN FREE AIR OR FREEDOM FOREVER FLORIDA LLC #8 AWG MUST BE IN#N/A CONDUIT CONNECT TO EXISTING UFER 2619 CONSULATE DR SUITE 800,ORLANDO, FL 32819 Tel:(800)385-1075 GREG ALBRIGHT CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 NOTE: CONDUIT AND CONDUCTORS SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT THREE LINE DIAGRAM TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS JOB NO: DATE: DESIGNED BY: SHEET: F098661 7/27/2021 YS PV-4 BACKFEED BREAKER SIZING MAX. CONTINUOUS OUTPUT 21A @ 240V 21 X 1.25 = 26.25AMPS 30A BREAKER-OK Digitally J ed J SEE 705.12 OF 2017 NEC Joseph J by Josephh J 200 X 1.20 = 240 Bravo:AO14 Bravo:A0141OD 240 - 150 = 90AALLOWABLE BACKFEED 10D000001 000001 77C 32 C5AD00012 8B PV SYSTEM 77CA32C5A Date: 7.000 kW-DC D0001228B 2021.07.28 5.000 kW-AC 14:34:33 -06 00' CLIENT: DONNA GOUIN 654 PONYTAIL LANE,FORT PIERCE,FL 34982 AHJ:ST.LUCIE COUNTY (E)UTILITY METER UTILITY:FPL-FLORIDA POWER&LIGHT (E)200A RATED STRING-1 MAIN SERVICE PANEL 10 LONGI SOLAR: 1PH,120/240V 60HZ SYSTEM: LR4-60HPB-350M U SYSTEM SIZE(DC):20 x 350=7.000 kW SYSTEM SIZE(AC):5.000 kW @ 240V POI:PV BREAKER TIES IN MSP MODULES:20 x LONGI SOLAR: SOLAREDGE P401 LR4-60HPB-350M POWER OPTIMIZERS (E)150A/2P MAIN OPTIMIZERS:P401 2-#10 AWG, BREAKER INVERTER:SE5000H-US[Sill PV WIRE (END FED) (N)30A/2P PV BREAKER (N)SOLAREDGE • • REVISIONS: SE5000H-US[Sill INVERTER NO: DESCRIPTION DATE STRING-2 AC (N)30A RATED •/ AC DISCONNECT • • 10 LONGI SOLAR: EATON DG221URB LR4-60HPB-350M D KNIFEBLADE,LOCKABLE, • NEMA 3R,UL LISTED • • JUNCTIONu •�• • • TO UTILITY BOX UNDERGROUND ai • RAPID FEED SHUTDOWN 4-#10 AWG,THWN-2 SWITCH 1-#8 EGC,THWN-2 3-#10 AWG,THWN-2 3-#10 AWG,THWN-2 IN 3/4'OR 1-#8 EGC,THWN-2 1-#8 EGC,THWN-2 LARGER#N/A CONDUIT IN 3/4"OR LARGER#N/A IN 3/4"OR LARGER#N/A freedom CONDUIT CONDUIT t ' ••`!• F O R E V E R SOLAREDGE P401 POWER OPTIMIZERS FREEDOM FOREVER FLORIDA LLC 2-#10 AWG,PV WIRE 2619 CONSULATE DR SUITE 800,ORLANDO, 1-#6 AWG IN FREE AIR OR FL 32819 #8 AWG MUST BE IN#N/A CONDUIT CONNECT TO EXISTING UFER Tel:(800)385-1075 GREG A(LhB�RIIG+HT CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 NOTE: CONDUIT AND CONDUCTORS SPECIFICATIONS ARE BASED SINGLE LINE DIAGRAM ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS JOB NO: DATE: DESIGNED BY: SHEET: F098661 7/27/2021 YS PV-4A Joseph J Digitally sig ed Bravo:A01 by Joseph J Bravo:AO14 OD 410 D0000 00000177c 32 0177CA32 C5AD00012 8B Date: GAD0001 2021.07.28 228E 14:34:47 -0 '00' CONDUCTOR AMPACITY DE-RATE CALCULATION CLIENT: DONNA GOUIN NEC FACTORS NEC FACTORS CONDUCTOR NEC FACTORS 654 PONYTAIL LANE,FORT PIERCE,FL CONDUCTOR AWG WIRE 34982 EQUIPMENT WIRE LOCATION QTY. SIZE TABLE TABLE AMPACITY TABLE AHJ:ST.LUCIE COUNTY 310.15(B)(16) 310.15(B)(2)(a) @75C ADJ. 310.15(B)(3)(a) UTILITY:FPL-FLORIDA POWER&LIGHT DC MODULE TO OPTIMIZER ROOF/FREE-AIR 2 10 1.25 1 11.16 1 DC OPTIMIZER TO JUNCTION BOX ROOF/FREE-AIR 2 10 1.25 1 11.16 1 SYSTEM: DC JUNCTION BOX TO INVERTER EXTERIOR WALL 4 8 1.25 1 33.48 0.8 SYSTEM SIZE(DC):20 x 350=7.0 kW SYSTEM SIZE(AC):5.000 kW @ 240 0V MSP AC INVERTER TO AC DISCONNECT EXTERIOR WALL 3 10 1.25 1 21 1 POI: BREAKER TIES IN MODUULL ES:20 x LONGI SOLAR: AC AC DISCONNECT TO POI EXTERIOR WALL 3 10 1.25 1 21 1 OPTIMIZERS: 0M OPTIMIZERS:P401 INVERTER:SE5000H-US[SI11 REVISIONS: NO: DESCRIPTION DATE freedom F O R E V E R FREEDOM FOREVER FLORIDA LLC 2619 CONSULATE DR SUITE 800,ORLANDO, FL 32819 Tel:(800)385-1075 GREG A(LhB�RIIG+HT CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 CONDUCTOR CALCULATIONS JOB NO: I DATE: DESIGNED BY: SHEET: F098661 7/27/2021 YS PV-5 BREAKER SIZES: SERVICE LIST: 30A PV BREAKER NONE MATERIAL LIST: QTY. PART PART# DESCRIPTION 20 MODULES 114-350 LONGI SOLAR:LR4-60HPB-350M 20 OPTIMIZERS 130-401 P401 SOLAREDGE POWER OPTIMIZER-FRAME MOUNTED MODULE ADD-ON 1 JUNCTION BOX 480-276 60OVDC NEMA 3R UL LISTED JUNCTION BOX 2 CONNECTORS 240-300 STAUBLI/MULTI-CONTACT MC4 CONNECTORS(FEMALE) 2 CONNECTORS 240-301 STAUBLI/MULTI-CONTACT MC4 CONNECTORS(MALE) ravo:A0141 1 INVERTER 120-501 SE5000H-US[SI11 240V INVERTER UL1741 SA CERTIFIED INTEGRATED ARC FAULT PROTECTION AND RAPID SHUTDOWN 1 AC DISCONNECT EATON DG221 URB 30A RATED 240VAC NEMA 3R UL LISTED D00000177 CLIENT: DONNA GOUIN 1 ROOF ATTACHMENT 1 241-250 UNIRAC:FLASHKIT PRO 654 PONYTAIL LANE,FORT PIERCE,FL 16 RAIL 1 211-100 UNIRAC SM LIGHT RAIL 168 INCH(TOTAL 221 FEET NEEDED) A32C5AD0 34982 20 RAIL HARDWARE 1 261-517 BND T-BOLT AND NUT SS p AHJ:ST.LUCIE COUNTY 21 MODULE CLAMPS 1 221-101 SM MIDCLAMP PRO DIRK 0 1 228 D UTILITY:FPL-FLORIDA POWER&LIGHT 21 MODULE CLAMPS 1 221-202 SM ENDCLAMP PRO W/END CLAMP 7 SPLICE 1 261-600 BND SPLICE BAR PRO SERIES MILL Digitally signed 21 MLPE MOUNT 1 261-510 MICRO MNT BND TBOLT SS SYSTEM: y Joseph J SYSTEM SIZE(DC):20 x 350=7.000 kW 6 ACCESSORIES 1 211-202 E-BOSS CONDUIT MOUNT COMP KIT rdVO:AO141 ODOO PSYSTEM OL PV MAZE(AC):ER 5.000 IES IN S@ 240V 11 ACCESSORIES 1 211-200 E-BOSS RAIL TRAY 4 ACCESSORIES 1 211-206 E-BOSS BRIDGE TRAY 00177CA32C5A MODULES:20 x LONGI SOLAR: LR4-60HPB-350M 6 ACCESSORIES 1 211-207 E-BOSS BRIDGE CLIPS D0001228B OPTIMIZERS:P401 32 GROUNDING LUG 1 260-300 BURNDY GROUND WEEB-LUG INVERTER:SE5000H-US[SI11 34 L-FOOT 1 241-100 UNIRAC L-FOOT SERRATED W/T-BOLT CLEAR(KIT) ate: 2021.07.28 4:35:03 -06'00' REVISIONS: NO: DESCRIPTION DATE freedom F O R E V E R FREEDOM FOREVER FLORIDA LLC 2619 CONSULATE DR SUITE 800,ORLANDO, FL 32819 Tel:(800)385-1075 GREG A(LhB�RIIG+HT CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 EQUIPMENT&SERVICE LIST JOB NO: I DATE: DESIGNED BY:I SHEET: F098661 1 7/27/2021 1 YS I PV-6 NOTES: • M SOLAR PV SYSTEM EQUIPPED 1. NEC ARTICLES 690 AND 705 AND IRC SECTION R324 WITH RAPID SHUTDOWN MARKINGS SHOWN HEREON. 690.13(B) - - 2. ALL MARKING SHALL CONSIST OF THE FOLLOWING: D • NOT DISCONNEF- A. UV RESISTANT SIGN MATERIAL WITH ENGRAVED OR UNDERLOAD F TURN RAPID MACHINE PRINTED LETTERS OR ELECTRO-PLATING. �A B. RED BACKGROUND COLOR WHITE TEXT AND LINE NEC 690.15(B)&NEC 690.33(D)(2) SHUTDOWN SWITCH TO WORK. III THE "OFF" POSITION TO C. AERIAL FONT. WARNING °`"RELE"R" 3. ALL SIGNS SHALL BE SIZED APPROPRIATELY AND PLACED IN S Pv PANELS SINGLE 120-VOLT SUPPLY J SHUT DOWN PV SYSTEM THE LOCATIONS SPECIFIED. SIGNAGE CANNOT BE HAND-WRITTEN. DO NOT CONNECT AND REDUCE SHOCK 3. SIGNS SHALL BE ATTACHED TO THE SERVICE EQUIPMENT MULTIWIRE BRANCH CIRCUITS HAZARD IN THE ARRAY WITH POP-RIVETS OR SCREWS. NEC 710.15(C)&692.9(C) IFC 605.11.3.1(1)&690.56(C) AWARNING DUAL POWER SOURCE _ � L A CAUTION SECOND SOURCE IS PHOTOVOLTAIC SYSTEM PHOTOVOLTAIC SYSTEM CIRCUIT IS BACKFED NEC 705.12(D)&NEC 690.59 L _ _ NEC 705.12(D)&NEC 690.59 ' I A WARNING 0WARNING L POWER SOURCE OUTPUT H AND SHOCK HAZARD J RIATE PPE REQUIRED Joseph J TURN OFF PHOTOVOLTAIC CONNECTION.DO NOTOVERSREMOVEo AC DISCONNECT PRIOR TO RELOCATE THIS NEC 690.13(B) OVERCURRENT DEVICE. "Ro Bravo:A01410D WORKING INSIDE PANEL NEC 705.12 C &NEC 690.59 NEC 70615C"�AND�NEC�110.16 CLIENT: ( ) ( ) 00000177CA32 6DONNA 54PON OUIN NEC 110.27(C)&OSHA 1910.145(F)(7) 654 PONYTAIL LANE,FORT PIERCE,FL - • • • 34982 I WARNING C5AD0001228B AHJ:ST.LUCIE COUNTY • 1 UTILITY:FPL-FLORIDA POWER&LIGHT ELECTRICAL SHOCK HAZARD C) NEC 690.53 TERMINALS ON THE LINE AND Q , • A Digitally signed by SYSTEM: LOAD SIDES MAY BE ENERGIZED NEC 690.13(B) WARNING SYSTEM SIZE(DC):20 x 350=7.000 kW IN THE OPEN POSITION Joseph J SYSTEM SIZE(AC):5.000 kW @ 240V • • • ' ' • ELECTRICAL SHOCK HAZARD Bravo:AO1410D000OO1 POI:PV BREAKER TIES IN MSP 706.15(C)(4)&690.13(B) TERMINALS ON THE LINE AND MODULES:20 x LONGI SOLAR: L - RATED AC • 21.00A LOAD SIDES MAY BE ENERGIZED 77CA32C5AD0001228B LR4-60HPB-350M A _ OPTIMIZERS:P401 WARNING d •- 240V IN THE OPEN POSITION Date: 2021.07.28 INVERTER:SE5000H-US[SI1] DCOLTAGE IS ALWAYS PRESENT THIS EQUIPMENT FEDWHEN SOLAR MODULES 14:35:21 -06 00 MULTIPLE SOURCES:: VOLTAGE TOTAL RATING OF ALL OVERCURRENT NEC 690.54 ARE EXPOSED TO SUNLIGHT DEVICES EXCLUDING MAIN POWER 706.15(C)(4)&690.13(B) REVISIONS: SUPPLY SHALL NOT EXCEED A WARNING DUAL POWER SOURCE NO: DESCRIPTION DATE AMPACITY OF BUSBAR SECOND SOURCE IS PHOTOVOLTAIC SYSTEM A WARNING NEC 705.12(B)(3)(3) AWARNING INVERTER NEC 705.12(D)&NEC 690.59 - ELECTRICAL SHOCK HAZARD DC [1�1 _ TERMINALS ON THE LINE AND THE DISCONNECTION OF THE � � _ LOAD SIDES MAY BE ENERGIZED GROUNDED CONDUCTOR(S) IN THE OPEN POSITION MAY RESULT IN OVERVOLTAGE 706.15(C)(4)&690.13(B) ON THE EQUIPMENT EVERY 10'ON CONDUIT AND ENCLOSURES NEC 690.31(0)(2) NEC 690.31(E) WARNINGR, . freedom EVERY 1U ON CONDUIT AND ENCLOSURES F 0 R E V E R NEC 690.31(D)(2) TURN OFF PHOTOVOLTAIC FREEDOM FOREVER FLORIDA LLC AC DISCONNECT PRIOR TO 2619 CONSULATE DR SUITE 800,ORLANDO, WORKING INSIDE PANEL FL 32819 Tel:(800)385-1075 NEC 110.27(C)&OSHA 1910.145(F)(7) GREG ALBRIGHT ARRAY I L CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 LABELS NEC 690.31(G)(3)&(4) JOB NO: DATE: DESIGNED BY: SHEET: F098661 7/27/2021 YS PV-7 Joseph J Digitally sig ed Bravo:A01 by Joseph J Bravo:A014 OD 410D0000 000001770,32 0177CA32 C5AD00012 813 C5AD0001 Date: 2021.07.28 � 228E 14:35:39 -06 00' CAUTION: MULTIPLE SOURCES OF POWER LOCATED AS SHOWN. DANGEROUS VOLTAGE MAY BE PRESENT AT ALL TIMES 17 CLIENT: DONNA GOUIN 654 PONYTAIL LANE,FORT PIERCE,FL 34982 AHJ:ST.LUCIE COUNTY UTILITY:FPL-FLORIDA POWER&LIGHT SYSTEM: SYSTEM SIZE(DC):20 x 350=7.000 kW MAIN SERVICE PANEL SYSTEM SIZE(AC):5.000 kW @ 240V POI:PV BREAKER TIES IN MSP MODULES: ODUL :350MONGI SOLAR: UTILITY METER L OPTIMIZERS:P401 INVERTER:SE5000H-US[SI11 AC DISCONNECT INVERTER EQUIPPED REVISIONS: WITH RAPID SHUTDOWN NO: DESCRIPTION DATE PONYTAIL LANE 6X8"TYP-NEC 705.10 freedom F O R E V E R FREEDOM FOREVER FLORIDA LLC 2619 CONSULATE DR SUITE 800,ORLANDO, FL 32819 Tel:(800)385-1075 GREG ALBRIGHT NOTES: E�-] 1. NEC ARTICLES 690 AND 705 AND IRC SECTION R324 MARKINGS SHOWN HEREON. CONTRACTOR LICENSE: 2. ALL MARKING SHALL CONSIST OF THE FOLLOWING: CERTIFIED ELECTRICAL CONTRACTOR A. UV RESISTANT SIGN MATERIAL WITH ENGRAVED OR MACHINE PRINTED LETTERS OR ELECTRO-PLATING. EC13008056 B. RED BACKGROUND COLOR WHITE TEXT AND LINE WORK. C. AERIAL FONT. 3. ALL SIGNS SHALL BE SIZED APPROPRIATELY AND PLACED IN THE LOCATIONS SPECIFIED. SIGNAGE CANNOT BE HAND-WRITTEN. SITE PLACARD 4. SIGNS SHALL BE ATTACHED TO THE SERVICE EQUIPMENT WITH POP-RIVETS OR SCREWS. JOB NO: I DATE I DESIGNED BY: SHEET: F098661 7/27/2021 1 YS PV-7A 1 -10 11 -20 21 -30 31 -40 41 -50 51 -60 SOLAREDGE OPTIMIZER CHART 1 2 3 CLIENT: DONNA GOUIN 654 PONYTAIL LANE,FORT PIERCE,FL 34982 4 AHJ:ST.LUCIE COUNTY UTILITY:FPL-FLORIDA POWER&LIGHT SYSTEM: SYSTEM SIZE(DC):20 x 350=7.000 kW 5 SYSTEM SIZE(AC):5.000 kW @ 240V POI:PV BREAKER TIES IN MSP MODULES:20 x LONGI SOLAR: LR4-60HPB-350M OPTIMIZERS:P401 INVERTER:SE5000H-US[SI1] 6 i REVISIONS: NO: DESCRIPTION DATE 7 i i i 8 L - '� ' freedom F O R E V E R 9 FREEDOM FOREVER FLORIDA LLC 2619 CONSULATE DR SUITE 800,ORLANDO, FL 32819 Tel:(800)385-1075 GREG ALBRIGHT 10 W-- CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 OPTIMIZER CHART JOB NO: DATE: DESIGNED BY: SHEET: F098661 7/27/2021 YS PV-8 SAFETY PLAN MARK UP KEY INSTRUCTIONS: 1. USE SYMBOLS IN KEY TO MARK UP THIS SHEET. OP PERMANENT ANCHOR 2. SAFETY PLAN MUST BE MARKED BEFORE JOB STARTS AS PART OF THE PRE-PLAN 3. DOCUMENT ALL ADDITIONAL HAZARDS ON THIS PAGE OT TEMPORARY ANCHOR & MAKE NOTES ON THE JHA SHEET IN CASE OF EMERGENCY IL INSTALLER LADDER NEAREST HOSPITAL OR OCCUPATIONAL/INDUSTRIAL CLINIC FB] JUNCTION / COMBINER BOX NAME: IS] STUB-OUT ADDRESS: SKYLIGHT SAFETY COACH CONTACT INFORMATION z NO LADDER ACCESS (STEEP CLIENT: NAME: DONNA GOUIN GRADE OR GROUND LEVEL 3654 4982 YTAIL LANE,FORT PIERCE,FL AHJ4982 ADDRESS: [] OBSTRUCTIONS) UTIL ST.LUCIE COUNTY UTILITY:FPL-FLORIDA POWER&LIGHT ALL EMPLOYEES ON SITE SHALL BE MADE AWARE OF THE ❑ SAFETY PLAN AND SIGN INDICATING THAT THEY ARE RESTRICTED ACCESS SYSTEM: AWARE OF THE HAZARDS ON-SITE AND THE PLAN FOR SYSTEM SIZE(DC):20 x 350=7.0 kW WORKING SAFELY. I SYSTEM SIZE(AC):5.000 kW @ 240 0V CONDUIT POI:PV BREAKER TIES IN MSP MODULES:20 x LONGI SOLAR: NAME SIGNATURE OPTIMIZERS. 0M I OPTIMIZERS:P401 GAS GAS SHUT OFF INVERTER:SE5000H-US[SI1] H2o WATER SHUT OFF REVISIONS: NO: DESCRIPTION DATE O SERVICE DROP O POWER LINES freedom F O R E V E R FREEDOM FOREVER FLORIDA LLC 2619 CONSULATE DR SUITE 800,ORLANDO, FL 32819 Tel:(800)385-1075 GREG ALBRIGHT DATE: TIME: CONTRACTOR LICENSE: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 SAFETY PLAN JOB NO: I DATE: DESIGNED BY: SHEET: F098661 7/27/2021 YS PV-9 JOB HAZARD ANALYSIS Crew leader to fill out all sections below, hold a pre-job safety meeting with all personnel, and upload this completed document and the Safety Plan to Site Capture Ladder Access • Crew leader responsible for communication with the client: Heat Related Illness Prevention NOTE ADDITIONAL HAZARDS NOT ADDRESSED ABOVE • Ladders must be inspected before each use. I I Employees shall have access to potable drinking water that is (add as many as necessary by using additional sheets) • Extension ladders must be set up on a firm and level surface at Client and public is excluded from work area by barricades (N/A, fresh, pure, and suitably cool. The water shall be located as a 4-to-1 rise to run angle(or 75 degrees)and the top must be Yes, No): close as practicable to the areas where employees are working. Define the Hazard: Method/steps to prevent incident: secured to the structure. Extension style ladders placed on Water shall be supplied in sufficient quantity at the beginning of uneven, loose or slippery surfaces must additionally have the Training and Pre-Job Safety Briefing the work shift to provide at least one quart per employee per base firmly anchored or lashed so the base will not slip out. • All employees onsite shall be made aware of the specific hazards hour for drinking for the entire shift. Employees may begin the • Extension ladders must be used with walk-through devices or of this project and review this HJA during a pre-job briefing, and shift with smaller quantities of water if they identify the location Define the Hazard: Method/steps to prevent incident: the ladder must extend 36"above the stepping off point. their signature indicates awareness of site conditions and the and have effective means for replenishment during the shift to • A-frame ladders must only be climbed with the ladder spreader plan to eliminate any hazards identified prior to and during the allow employees to drink on quart or more per hour. The bars locked in the open position;A-frame ladders shall not be project. frequent drinking of water shall be encouraged. climbed while in the closed position (ex, closed and used while • Shade shall be present when temperature exceeds 80 degrees leaned against a structure). • Crew leader(name/title): Fahrenheit. When the outdoor temperature in the work exceeds Define the Hazard: Method/steps to prevent incident: • Additional notes: 1 80 degrees Fahrenheit, employees shall have and maintain one • Crew member(name/title): or more areas with shade at all times. Mobile Equipment • New employees must be acclimatized. New employees will be • Only Qualified operators will operate equipment; operators must Crew member(name/title): monitored by their Crew Leader(site supervisor)for the first two maintain a certification on their person for the equipment being (2)weeks of employment or longer when necessary. Define the Hazard: Method/steps to prevent incident: operated. • Crew member(name/title): • Employees will be allowed and encouraged to implement • Type(s)of mobile equipment(Type/Make/Model): I scheduled breaks during each shift. Employees must take • Crew member(name/title): cool-down breaks in the shade any time they feel the need to do • Qualified operator(s): so to protect them from overheating. Supervisors are • Crew member(name/title): REQUIRED to allow employees any break period they need Material Handling and Storage during high heat conditions. CLIENT: DONNA GOUIN • Materials will be staged/stored in a way that does not present a Airborne Contaminants: • Cool Vests are encouraged for all employees at all times during 654 PONYTAIL LANE,FORT PIERCE,FL hazard to client, personnel or public. Materials stored on the • Asbestos-containing (Transite) piping (ACP)-Do not disturb periods of high heat. 34982 AHJroof will be physically protect from failing or sliding off. move, drill, cut fracture, etc. • Identify the location of the closet Occupational/industrial ational/Industrial Clinic UTILITY: ST:LUCIE COUNTY p Y Y p g g ( ) Y p UTILITY:FPL-FLORIDA POWER&LIGHT • Asbestos-containing thermal insulation (ACI)and or Hospital in case a crew member becomes ill. Fall Protection Asbestos-containing duct wrapping (ACW)-do not disturb, no • A site-specific plan for fall prevention and protection is required attic or crawlspace access is allowed if work to be performed What is the specific plan to provide and replenish sufficient water for SYSTEM: prior to starting work and must remain onsite at all times until could cause exposure to personnel, client or public. all employees on site? SYSTEM SIZE(DC):20 x 350=7.000 kW work is complete; a fall rescue plan must be outlined and • If offsite replenish is necessary,where will you go to replenish SYSTEM SIZE(AC):5.000 kW @ 240V POI:PV BREAKER TIES IN MSP discussed among the crew prior to work start. • If yes, list specific tasks and protection in place: water(location/address): MODULES:20 x LONGI SOLAR: • First-person-Up (FPU) must install their anchor and connect LR4-60HPB-350M before any other task, including installing other anchors. The • Who will replenish the drinking water(name): OPTIMIZERS:P401 INVERTER:SE5000H-US[SI1] Last-Person-Down (LPD)must be the only person on a roof uninstalling fall protection. • FPCP(name and title): Restroom facilities REVISIONS: • Employees shall have access to restroom facilities with NO: DESCRIPTION DATE • FPU and LPD (name and title): hand-washing stations. Use of onsite restroom is at the client's discretion (location is annotated below). If client does not give Electrical Safety permission, location of suitable restroom facilities with • The Electrical Qualified Person (EQP)is required onsite to hand-washing stations offsite will be provided.The onsite perform electrical work. supervisor will identify location and make arrangements to • All electrical work will be performed with equipment in an ensure all employees have access at any point. electrically safe condition (de-energized)unless approval has • Restroom facilities will be(circle one): Onsite-Offsite been granted prior to work. Weather and Environment • If Offsite, add location name and address: • Service drops and overhead electrical hazards will be indentified • The site supervisor shall forecast the weather conditions at the and protected from contact, as neccessary. job site, prior to crew arrival, in order to mitigate any hazards Incident Reporting Procedure • EQP(name and tile): associated with inclement weather(heat, cold,wind, rain, etc.) Contact your Site Supervisor freedom • The site supervisor will utilized a portable wind meter Name: Public Protection anemometer to verify actual onsite wind conditions b checking •• F O R E V E R Ub C (anemometer) Y Y g FREEDOM FOREVER FLORIDA LLC • The safety of the Client and Public must be maintained at all at the ground and on any elevated work surface(ex, rooftop) Phone: 2619 CONSULATE DR SUITE 800,ORLANDO, times. prior to work start, at midday and prior to solar panel staging on a FL 32819 • The Client and the Public shall be prevented from entering the roof. • Contact your Manager Tel:(800)385-1075 work zone through the use of barriers and/or signage, as Elevated work involving the moving or maneuvering of solar Name: GREG ALBRIGHT required. panels shall cease at 25mph (sustained wind)until wind • Company, Client and Public property shall be protected from subsides. Phone: falling objects. Forecasted weather maximum temp(degrees f): • Pets(including dogs)shall be secured by their owners prior to Contact your Site Supervisor CONTRACTOR LICENSE: work Start. Name: CERTIFIED ELECTRICAL CONTRACTOR EC13008056 • The Client should not leave pets,family members, or others in charge or care of Employees, Contractors, or Temporary Phone: Workers. With:Your full name, phone number, office location, brief description SAFETY PLAN Of what happen and when. JOB NO: I DATE I DESIGNED BY: SHEET: F098661 7/27/2021 1 YS PV-10 LR4-60 H P B 345~365M OperatingDesign (mm) Mechanical Parameters �uMM ��n.�� n Cell Orientation:120 (6x20) Operational Temperature:-40 C-+85 C WIW IIIIIIIWIIII IIIIIII WIWIIIIIII Junction Box:IP68,three diodes Power Output Tolerance:O-+SW t Ad 9 Output Cable:4MM2,300mm in length, Voc and lsc Tolerance:±3%length can be customized Maximum System Voltage:DC1000V(IEC/UL) Glass:Single glass Maximum Series Fuse Rating:20A 3.2mm coated tempered glass Nominal Operating Cell Temperature:45±2 C • I - t� -----+----- ----- ---- ----' --- A-A Frame:Anodized aluminum alloy frame Safety Class:Class11 IIIIIIIWIWIIIIIIIWIWIIIIIIIIWW / • • / Units:mmon<h) Weight:19.5kg Fire Rating:ULtype 1 or 2 M IMIWIM III Tolemnte: Dimension:175Sx1038x35mm Length: m �r....n.� it.....It' �'Iit.....It'''',,1 v9] �wmlh:±imm Packaging:30pcs per pallet 1111111 11111,1.1.....111111,11.....1 Height±lmm Filch-+Ietm 180pcs per 20'GP 780pcs per 40'HC Mmnm MIM Electrical Characteristics Test uncertainty for Pmax:±3% Model Number LR4-60HPB-345M LR4-60HP8-350M LR4-60HP8-355M LR4-60HP8-360M LR4-60HPB-365M Testing Condition STC NOCT STC NOCT STC NOCT STC NOCT STC NOCT Maximum Power(Pmax/W) 345 255.6 350 259.3 355 263.0 360 266.7 365 270.4 - Open Circuit Voltage(Voc/V) 40.2 37.5 40.4 I 37.7 40.6 37.9 40.8 38.1 41.0 I 38.3 Short Circuit Current(Isc/A) 11.06 8.92 11.16 8.99 11.25 9.06 11.33 9.13 11.41 9.20 25-year Power Voltage at Maximum Power(Vmp/V) 34.2 31.6 34.4 31.8 34.6 32.0 34.8 32.1 35.0 32.3 Additiona/Vatue Warranty Annual Current at Maximum Power(Imp/A) 10.09 8.09 10.18 8.16 10.27 8.23 10.35 8.30 10.43 8.36 fro LOf�GiSot Power Attenuation 18.9 19.2 19.5 19.8 20.0 91.2% etandar arsLtnearWarranty -0.55% Module Efficiency(%) 2 dModuJP .t'. STC(Standard Testing Conditions):Irradiance 1000W/m,Cell Temperature 25 C,Spectra at AM1.5 87 77 ytFlearpower warranTy NOCT(Nominal Operating Cell Temperature):Irradiance 80OW/m2,Ambient Temperature 20 C,Spectra at AM1.5,Wind at 1m/S 84.5 80.7% =- - - --1-- -- - ------- Temperature Ratings ( STC Mechanical-- -- --- Loading Temperature Coefficient of Isc +0.057%/C Front Side Maximum Static Loading 540OPa 10 15 20 25 Temperature Coefficient of Voc -0.286%/C Rear Side Maximum Static Loading 240OPa Complete System and Product Certifications Positive power tolerance(0 +5W)guaranteed Temperature Coefficient of Pmax -0.370%/C Hailstone Test 25mm Hailstone at the speed of 23m/s IEC 61215,IEC61730,UL61730 High module conversion efficiency(up to 20%) ISO 9001:2008:ISO Quality Management System ISO 14001:2004:ISO Environment Management System Slower power degradation enabled by Low LID Mono PERC technology:first year<2%, TS62941:Guidelinefor module design qualification and type approval 0.55%year 2-25 Current-Voltage Curve(LR4-60HPB-360M) Power-Voltage Curve(LR4-60HPB-360M) Current-Voltage Curve(LR4-60HPB-360M) OHSAS 18001:2007 Occupational Health and Safety Solid PID resistance ensured by solar cell process optimization and careful module BOM 12 400 Ceflt mo.25°c 12 Cdl a px2VC selection to 350 -hxideminad:1000w/m= 0 madentlrtad=,000w/m -Incitlem med.=eoow/ma TN 300 -:mid brad:600W/m' -Incident lrtad:4ww/m' Intldent Irtatl.•�OWhn c us Reduced resistive loss with lower operating current a -hxden,lrtad:zow/m' a -cell Temp=25°c 250 2 w 6 -Call Temp=35°C �200 � 5 Intlden[irtad.�OUWAN *Specifications subject to technical changes and tests.LONGi Solar Higher energy yield with lower operating temperature -ce11Temp=45°c reserves the right of interpretation. U 4 -ce11Temp=55°c 150 " a Inaaennrtaa.=aoowma Cell Temp=65°C t00 Reduced hot spot risk with optimized electrical design and lower operating current z z ad mh d_p�/m, -Cell Temp=]5°C 50 0 o 0 o 10 20 30 40 o 10 20 30 40 o to 20 30 40 Voltage M Voltage M Voltage M I Room 801,Tower 3,Lujiazui Financial Plaza,No.826 Century Avenue,Pudong Shanghai,200120,China NGI Room 801,Tower 3,Lujiazui Financial Plaza,No.826 Century Avenue,Pudong Shanghai,200120,China Tel:+86-21-80162606 E-mail:module@longi-silicon.com Facebook:www.facebook.com/LONGi Solar Tel:+86-21-80162606 E-mail:module@longi-silicon.com Facebook:www.facebook.com/LONGi Solar Note:Due to continuous technical innovation,R&D and improvement,technical data above mentioned may be of modification accordingly.LONGi have the sole right to make such Note:Due to continuous technical innovation,R&D and improvement,technical data above mentioned may be of modification accordingly.LONGi have the sole right to make such modification at anytime without further notice;Demanding party shall request for the latest datasheet for such as contract need,and make it a consisting and binding part of modification at anytime without further notice;Demanding party shall request for the latest datasheet for such as contract need,and make it a consisting and binding part of lawful documentation duly signed by both parties. lawful documentation duly signed by both parties. 20200106-Draft 20200106-Draft Single Phase Inverter Wit HD-Wave Tec n0 ogy for North America SE3000H-US / SE380OH-US / SE5000H-US / SE6000H-US/ Single Phase Inverter Z SE760OH-US / SE1000OH-US / SE1140OH-US SE300OH-US ,0, 00,O OUTPUT with HID-Wave TechnologyRated AC Power Output 3000 3800 @ 240V 5000 6000 @ 240V 7600 10000 11400 @ 240V VA 3300 @ 208V 5000 @ 208V 10000 @ 208V Maximum AC Power Output 3000 3800 @ 240V 5000 6000 @ 240V 7600 10000 11400 @ 240V VA for North America ;a_ 3300 @ 208V 5000 @ 208V 10000 @ 208V AC Output Voltage Min.-Nom.-Max. Vac 64) SE3000H-LIS / SE380OH-US / SE5000H-US / SE6000H-US / (211 AC Output Voltage Min.-Nom.-Max. � � � Vac SE760OH-LIS / SE1000OH-US / SE1140OH-US ACFre u 229) n AC Frequency(Nominal) 59.3-60-60.50I Hz Maximum Continuous Output 12 5 16 21 25 32 42 47.5 A 7 Current Conti 0 YEAR Maximum Continuous Output _ 16 24 48.5 A solarg�jtg' —HD:.,... � •� Current @208V GFDI Threshold 1 A Ln Utility Monitoring,Islanding • solar=—-- ,,,� , • Protection,Country Configurable Yes Thresholds INPUT L•1 Maximum DC Power @240V 4650 5900 1 7750 1 9300 1 11800 1 15500 1 17650 W Maximum DC Power @208V 5100 1 7750 15500 W O _ • Transformer-less,Ungrounded Yes '_• Maximum Input Voltage 480 Udc •• • • Nominal DC Input Voltage 380 400 Vdc Maximum Input Current @240VI2l 8.5 10.5 13.5 16.5 20 27 30.5 Adc • • b • Maximum Input Current @208VI2l - 9 13.5 - 27 Adc Max.Input Short Circuit Current 45 Adc O • Reverse-Polarity Protection Yes O • Ground-Fault Isolation Detection 6001m Sensitivity Maximum Inverter Efficiency 99 99.2 % CEC Weighted Efficiency 99 99 @ 240V % 98.5 @ 208V O O • • Nighttime Power Consumption <2.5 W W W ADDITIONAL FEATURES Supported Communication Interfaces RS485,Ethernet,ZigBee(optional),Cellular(optional) Revenue Grade Data,ANSI C12.20 Optionalal Rapid Shutdown-NEC 2014 and Automatic Rapid Shutdown upon AC Grid Disconnect Optimized installation with HD-Wave technology 2017690.12 STANDARD COMPLIANCE Safety UL1741,UL1741 SA,UL1699B,CSA C22.2,Canadian AFCI according to T.I.L.M-07 / Specifically designed to work with / Extremely small Grid Connection Standards IEEE1547,Rule 21,Rule 14(Ho power optimizers Emissions FCC Part15 Class B / Record-breaking efficiency / Built-in module-level monitoring INSTALLATION SPECIFICATIONS AC Output Conduit Size/AWG 3/4'minimum/14-6 AWG 3/4'minimum/14-4 AWG Range / Fixed voltage inverter for longer strings / Outdoor and indoor installation DC Input Conduit Size/#of Strings/ 3/4•minimum/1-2 strings/14-6AWG 3/4'minimum/1-3 strings/14-6 AWG AWG Range Dimensions with Safety Switch 17.7 x 14.6 x 6.8/450 x 370 x 174 21.3 x 14.6 x 7.3/540 x 370 x 185 in/ / Integrated arc fault protection and rapid shutdown for / Optional: Revenue grade data,ANSI C12.20 (HxWxD) mm NEC 2014 and 2017, per article 690.11 and 690.12 Class 0.5 (0.5%accuracy) Weight with Safety Switch 22/10 125.1/11.4 26.2/11.9 38.8/17.6 lb/kg Noise <25 <50 dBA / UL1741 SA certified,for CPUC Rule 21 grid Cooling Natural Convection compliance Operating Temperature Range -40 to+140/-25 to+6011t(-40'F/-40'C option) 'F/'C Protection Rating NEMA 4X(Inverter with Safety Switch) M For other regional settings please contact SolarEdge support solar I a r=@ " (3)A higher current source may be used;the inverter will limit its input current to the values stated cap Revenue grade inverter P/N:SExxxxH-USOOONNC2 soIaredge.comr4I For power de-rating information refer to:https://www.solaredge.com/sites/defauVfiles/se-temperature-derating-note-na.pdf rsi-40 version P/N:SExxxxH-US000NNU4 ©SolarEdge Technologies,Inc.All rights reserved.SOLAREDGE,the SolarEdge logo,OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies,Inc All Ro H S other trademarks mentioned herein are trademarks of their respective owners.Date:12/2018N01/ENG NAM.Subject to change without notice. Poviver Optimizer Mill For North America Power Oplatimizer O P320 / P340 / P370 / P400 / P405 / P505 For North America ' •• (typical (for higher .. .0 .. P320 / P340 / P370 / P400 / P405 / P505ower 60-cell cell r thin film current •• •• modules) m INPUT Rated Input DC Powerm 320 1 340 370 400 405 505 W Absolute Maximum Input Voltage 48 60 80 125m 830 Vdc 25 (Voc at lowest temperature) YEAR O MPPT Operating Range 8-48 8-60 8-80 12.5-105 12.5-83 Vdc WARRANTY Maximum Short Circuit Current 11 10.1 14 Adc (Isc) Maximum DC Input Current 13.75 12.63 17.5 Adc Mill Maximum Efficiency 99.5 % Weighted Efficiency 98.8 98.6 % Overvoltage Category II OUTPUT DURING OPERATION (POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) Maximum Output Current 15 Adc Maximum Output Voltage 60 85 Vdc OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF) N Safety Output Voltage per Vdc Power Optimize, 1 t 0.1 STANDARD COMPLIANCE EMC FCC Part15 Class 8,IEC61000-6-2,IEC61000-6-3 Safety IEC62109-1(class II safety),UL1741 ROHS Yes INSTALLATION SPECIFICATIONS Maximum Allowed System 1000 Vdc Voltage Compatible inverters All SolarEdge Single Phase and Three Phase inverters Dimensions(WxL x H) 129x153x27.5/5.1x6x1.1 129x153x33.5/ 129x159x49.5/ 129x162x59/ mm/in 5.1x6x1.3 5.1x6.3x1.9 5.1x6.4x2.3 Weight(including cables) 630/1.4 1 750/1.7 845/1.9 1064/2.3 gr/lb Input Connector MC4m Output Wire Type/Connector Double Insulated;MC4 Output Wire Length 0.95/3.0 1.2/3.9 m/ft Input Wire Length 0.16/0.52 m/ft Operating Temperature Range -40-+85/-40-+185 'C/'F PV power optimization at the module-level Protection Rating IP68/NEMA6P Relative Humidity 0-100 % :11 Rated STC power of the module.Module of up to+5%power tolerance allowed al NEC 2017 requires max input voltage be not more than 80V Specifically designed to work with SolarEdge / Fast installation with a single bolt For other connector types please contact SolarEdge inverters Next generation maintenance with module- / ThreePhase Up to 25% more energy level monitoring WirEdge '• •' Minimum String Length P33 P340,P370, 8 10 18 400 Superior efficiency (99.5%) / Meets NEC requirements for arc fault (Power Optimizers) P405/P505 6 8 14 protection (AFCI) and Photovoltaic Rapid Maximum String Length 25 25 SON Mitigates all types of module mismatch losses, (Power Optimizers) g yp Shutdown System (PVRSS) 5700(6000 with from manufacturing tolerance to partial Maximum Power per String SE7600-US-SE11400 5250 6000m 12750(s W shading / Module-level voltage shutdown for installer US) 9 Parallel Strings 1�Different Lengths Yes and firefighter safety or Orientations Flexible system design for maximum space '41Fordetailedstringsizinginformationreferto:httpV/www.solaredge.com/sites/default/files/string sizing_na.pdf ai It is not allowed to mix P405/P505 with P320/P340/P370/P400 in one string utilization 01 A string with more than 30 optimizers does not meet NEC rapid shutdown requirements;safety voltage will be above the 30V requirement m For SE14.4KUS/SE43.2KUS:It is allowed to install up to 6,500W per string when 3 strings are connected to the inverter(3 strings per unit for SE43.2KUS)and when the maximum power difference between the strings is up to 1,000W lei For SE30KUS/SE333KU5/SE66.6KUS/SE100KUS:It is allowed to install up to 15,000W per string when 3 strings are connected to the inverter(3 strings per unit for SE66.6KUS/SE100KUS) and when the maximum power difference between the strings is up to 2,000W solaredge.com solar, Al SolarEdge Technologies Ltd.All reins reserved.SOLAREDGE,their the SolarEdge logo,OPTIMIZED BY 1/ENG AM are trademarks or registered trademarks of SolarEdge Technologies,Inc C E Ro H S All other trademarks mentioned herein are trademarks of their respeRive owners.Date:12/2018N01/ENG NAM.Subject to change without notice. 0 o SFMINFINITY one.. IRA .. N I R BETTER SOLAR STARTS HERE DESIGN GUIDELINES BETTER SOLAR STARTS HERE Take your business to the next level with SFM INFINITY, UNIRAC's rail-less PV mounting system for flush While you will see advantages simply from switching to SFM INFINITY, the following guidelines will help you mount installations on comp shingle and the roofs. An advanced 3rd generation product platform in use to maximize its benefits, by top solar contractors nationwide, SFM INFINITY optimizes your operations on and off the roof, with approximately 40% less labor, 30% logistics savings, and 20% fewer roof attachments than traditional solar racking. Plus, 87% of homeowners prefer SFM INFINITY's aesthetics. DEFAULT TO LANDSCAPE OUNIRAC When possible,design in landscape orientation in order to fit more modules on the roof and minimize roof attachments. 25 rl YIAH MIX MODULE ORIENTATIONS HANTY SFM INFINITY is easily configured in mixed array shapes and module orientations to maximize array density and to avoid vent pipes and other obstacles.Because mounting locations are not constrained by rails,SFM INFINITY has unmatched flexibility to enhance your projects. UNIVERSAL COMPONENTS CONSULT THE QUICK TIPS VIDEOS FIT 32 - 40MM MODULES Visit UNIRAC's mobile-friendly library of short,topic-specific videos which answer common questions and demonstrate how simple it is to install SFM INFINITY. Quick Tips Videos:https://unirac.com/SFM-Infinity/ INSTALL TRIMRAIL ROOF DESIGN IN U-BUILDER Layout your arrays in U-Builder,UNIRAC's free solar design software,to optimize SFM INFINITY's _T capabilities,including mixing module orientations and minimizing roof attachments.Quickly create layouts on Google or Bing Maps and generate project documents. SUPERIOR PERFORMANCE EASY INSTALLATION HOMEOWNER PREFERRED — U Builder:https:Hdesign.unirac.com/ Enhance your business with two installs per day Pre-assembled components,20%fewer roof attachments, More than 4 out of 5 homeowners prefer SFM INFINITY's and 30%less cost. and level array in seconds with post height adjustment. aesthetics over a leading rail brand. REVOLUTIONIZING ROOFTOP SOLAR REVOLUTIONIZING ROOFTOP SOLAR FOR QUESTIONS 0' CUSTOMER SERVICE VISIT U N I'A C.C 0 M 0' I5) 248-2702 FOR QUESTIONS 0' CUSTOMER SERVICE VISIT U N I'A C.C 0 M 0' 1 1 Report No. 102393982LAX-002 Page 2 of 107 Issued: 11-Apr-2016 Report No. 102393982LAX-002 Page 3 of 107 Issued: 11-Apr-2016 Unirac, Inc Revised: 20-Mar-2019 Unirac, Inc Revised: 20-Mar-2019 2.0 Product Description 2.0 Product Description Product Photovoltaic Mounting System, Sun Frame Microrail- Installed Using Unirac Installation Guide, Model Similarity NA Fuse Rating: 30A Rev PUB2019MAR01 with Annex North Row Extension Installation Guide Rev PUB2019FEB20 Brand name Unirac Module Orientation: Portrait or Landscape The product covered by this report is the Sun Frame Micro Rail roof mounted Photovoltaic Maximum Module Size: 17.98 ft2 Rack Mounting System. This system is designed to provide bonding and grounding to UL2703 Design Load Rating: 33 PSF Downward, 33 PSF Upward, 10 PSF Down-Slope photovoltaic modules. The mounting system employs anodized or mill finish aluminum brackets Tested Loads-50 psf/2400Pa Downward, 50psf/2400Pa Uplift, 15psf/720Pa Down Slope that are roof mounted using the slider, outlined in section 4 of this report. There are no rails Trina TSM-255PD05.08 and Sunpower SPR-E20-327 used for Mechanical Loading within this product, whereas the 3" Micro Rail, Floating Splice, and 9"Attached Splice electrically bond the modules together forming the path to ground. Increased size ML test: Maximum Module Size: 22.3 ft2 The Micro Rails are installed onto the module frame by using a stainless steel bolt anodized UL2703 Design Load Rating: 113 PSF Downward, 50 PSF Upward, 30 PSF Down-Slope with black oxide with a stainless type 300 bonding pin, torqued to 20 ft-lbs, retaining the LG355S2W-A5 used for Mechanical Loading test. modules to the bracket. The bonding pin of the Micro Rail when bolted and torqued, penetrate Mounting configuration: Four mountings on each long side of panel with the longest span of Description the anodized coating of the photovoltaic module frame to contact the metal, creating a bonded 24" connection from module to module. UL2703 Design Load Rating: 46.9 PSF Downward,40 PSF Upward, 10 PSF Down-Slope Ratings LG395N2W-A5, LG360S2W-A5 and LG355S2W-A5 used for used for Mechanical Loading The grounding of the entire system is intended to be in accordance with the latest edition of the test. National Electrical Code, including NEC 250: Grounding and Bonding, and NEC 690: Solar Mounting configuration: Six mountings for two modules used with the maximum span of Photovoltaic Systems. Any local electrical codes must be adhered in addition to the 74.5" national electrical codes. The Grounding Lug is secured to the photovoltaic module, torqued in accordance with the installation manual provided in this document. Fire Class Resistance Rating: -Class A for Steep Slope Applications when using Type 1 Modules. Can be installed at any Other optional grounding includes the use of the Enphase UL2703 certified grounding system, interstitial gap. Installations must include Trim Rail. which requires a minimum of 2 micro-inverters mounted to the same rail, and using the same -Class A for Steep Slope Applications when using Type 2 Modules. Can be installed at any engage cable. interstitial gap. Installations must include Trim Rail. Models Unirac SFM -Class A Fire Rated for Low Slope applications with Type 1 or 2 listed photovoltaic modules. This system was evaluated with a 5"gap between the bottom of the module and the roof's surface See section 7.0 illustraction# 1 and la for a complete list of PV modules evaluated with these racking systems Other Ratings NA ED 16.3.15(20-Apr-17)Mandatory ED 16.3.15(20-Apr-17)Mandatory to a Address:Intertek Colad NY 13 11 to ek Address:Intertek Colad NY 13 11 Cortland NY 13045 Cortland NY 13045 Total quality.Assured. Telephone: 607-758-6516 Total Quality.Assured. Telephone: 607-758-6516 www.intertek.com www.intertek.com o SE3000A-US/SE380OA-US/SE5000A-US/SE6000A-US/SE760OA-US/SE1000OA-US/ SE1140OA-US/SE3000H-US/SE380OH-US/SE5000H-US/SE6000H-US/SE760OH-US/ Subject: ETL Evaluation of SolarEdge Products to NEC 2017 Rapid Shutdown Requirements SE1000OH-US/SE1140OH-US when the following label is labeled on the side of the inverter: To,whom it may concern Ir 's This letter represents the testing results of the below listed products to the requirements contained in the following Standards: --PHOTOVOLTAIC RAPID National Electric Code, 2017,Section 690.12 requirement for rapid shutdown. SHUTDOWN SYSTEM UL 1741, UL 1741 CRD for rapid shutdown The evaluation was done on the PV Rapid Shutdown System (PVRSS),and covers installations consisting Inverter part number may be followed by a suffix of optimizers and inverters with part numbers listed below. The testing done has verified that controlled conductors are limited to: • 3-ph Inverters: o SE9KUS/SEIOKUS/SE14.4KUS/SE20KUS/SE30KUS/SE33.3KUS/SE43.2KUS/ • Not more than 30 volts and 240 voltamperes within 30 seconds of rapid shutdown initiation SE66.6KUS/SE100KUS;when the following label is labeled on the side of the inverter: outside the array. • Not more than 80 volts and 240 voltamperes within 30 seconds of rapid shutdown initiation AliblarAWI inside the array. The rapid shutdown initiation is performed by either disconnecting the AC feed to the inverter,or—if HOTOVOLTAIC RAPID the inverter DC Safety switch is readily accessible—by turning off the DC Safety switch. SHUTDOWN SYSTEM Applicable products: Inverter part number may be followed by a suffix • Power optimizers: o PB followed by 001 to 350;followed by-ACB or-TFI. If there are any questions regarding the results contained in this report,or any of the other services OP followed by 001 to 500;followed by-LV,-MV,-IV or-EV. offered by Intertek, please do not hesitate to contact the undersigned. P followed by 001 to 850. SP followed by 001 to 350. *When optimizers are connected to 2 or more modules in series,the max input voltage may exceed 80V. Following the implementation of the NEC 2017 rapid shutdown value of 80V max inside of the array at the beginning of 2019, modules exceeding this combined input max voltage will be required to use optimizers with parallel inputs. • 1-ph Inverters: This information is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. This information is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement.Intertek assumes no liability to any party, Intertek's responsibility and liability are limited to the terms and conditions of the agreement.Intertek assumes no liability to any party, other than to the Client in accordance with the agreement,for any loss,expense,or damage occasioned by the use of this information. other than to the Client in accordance with the agreement,for any loss,expense,or damage occasioned by the use of this information. Any observations and results in this report are relevant only to the sample evaluated. Only the Client is authorized to copy and Any observations and results in this report are relevant only to the sample evaluated. Only the Client is authorized to copy and distribute this information and only then in its entirety. distribute this information and only then in its entirety. ©2018 Intertek ©2018 Intertek Version:8-September-2016 Page 1 of 3 GFT-OP-110a Version:8-September-2016 Page 2 of 3 GFT-OP-10a CIR CSA � CSA Group S R, Group ®\� mumW Certificate of Com n liance Certificate: 70131735 Master Contract: 266909 Project: 70185553 Date Issued: 2018-10-08 Certificate: 70131735 Master Contract: 266909(266909) The grounding of the system is intended to comply with the latest edition of the National Electrical Code,to include NEC 250&690. Local codes compliance is required,in addition to national codes.All Project: 70185553 Date Issued: 2018-10-08 grounding/bonding connections are to be torqued in accordance with the Installation Manual and the settings used during the certification testing for the current edition of the project report. Issued to: Unirac 1411 Broadway NE The system may employ optimizers/micro-inverters and used for grounding when installed per installation Albuquerque,New Mexico 87102 instructions. USA Mechanical ratings: Attention: Klaus Nicolaedis Downward Design Load(lb/ft2) 113.4 The products listed below are eligible to bear the CSA Mark shown Upward Design Load(lb/ft2) 50.4 with adjacent indicators 'C' and 'US'for Canada and US or with adjacent Down-Slope Load(lb/ft2) 14.7 indicator 'US'for US only or without either indicator for Canada only. Conditions of acceptability: Installation is subject to acceptance of the local inspection authorities having jurisdiction.The certification of these products relates only to the methods of installation,bonding,and grounding as outlined in the Installation Manual for each product. CD I Issued by: M Unirac Large Array i,c� Y Michael Hoffnagle ULA is a ground mount system using the SolarMount(SM)platform for the bonding and grounding of PV C U$ modules.ULA aluminum components merge with SM rails and installer-supplied steel pipe. The SM rail system is secured to the horizontal Pipe using the Rail Bracket components. The Rear and Front cap secures the horizontal Pipe to the vertical Pipe.The Front cap is also used to secure the Cross brace.A Slider is attached to the vertical Pipe to secure the Cross brace. The SM rails,caps,slider,rail brackets, PRODUCTS and cross braces materials are 6105-T5 aluminum extrusion.Fasteners materials are 304 stainless steel. CLASS -C531302-POWER SUPPLIES-PHOTOVOLTAICS--PV Racking Horizontal and vertical pipe materials meet the minimum requirements of ASTM A53 for galvanized steel CLASS -C531382-POWER SUPPLIES-PHOTOVOLTAICS-PV Racking and clamping systems-Certified to pipe in 2"and 3"diameter. US Standards The mechanical load ratings from the SM test data will be applied to the ULA model. Models: SM SOLARMOUNT Flush-to-Roof is an extruded aluminum rail PV racking system that is installed parallel to the roof in landscape or portrait orientations. Fire Testing is not applicable due to being a ground mount system. ULA Unirac Large Array is a ground mount system using the SolarMount(SM)platform for the bonding and grounding of PV modules. APPLICABLE REQUIREMENTS SOLARMOUNT UL 2703-1st Edition - Mounting Systems,Mounting Devices,Clamping/Retention Devices,and Ground Lugs for Use with Flat-Plate Photovoltaic Modules and Panels. The system listed is designed to provide bonding/grounding, and mechanical stability for photovoltaic modules. LTR AE-001-2012 - List of Technical Requirements for Photovoltaic Module and Panel racking Systems The system is secured to the roof with the L-Foot components through the roofing material to building structure. Modules are secured to the racking system with stainless steel or aluminum mid clamps and Aluminum end MARKINGS clamps. The modules are bonded to the racking system with the stainless steel bonding mid clamps with piercing points.The system is grounded with 10 AWG copper wire to bonding/grounding lugs.Fire ratings of Class A The manufacturer is required to apply the following markings: with Type 1,2,3,or 10 for steep slope. Tested at 5"interstitial gap which allows installation at any stand-off . Products shall be marked with the markings specified by the particular product standard. height. • Products certified for Canada shall have all Caution and Warning markings in both English and French. L—DQD 507 Rev.2016-02-18 Page l DOD 507 Rev.2016-02-18 Page 2 tntertek AUTHORIZATION TO MARK Total Quality.Assured. This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing Report. This document is the property of Intertek Testing Services and is not transferable. The certification mark(s) may be applied only at the location of the Party Authorized To Apply Mark. Applicant: Unirac, Inc Manufacturer: Cixi Emeka Aluminum Co. Ltd 1411 Broadway Blvd NE No. 688 ChaoSheng Road Address: Albuquerque, NM 87102 Address: Cixi City Zhejiang Province 315311 Country: USA Country: China Klaus Nicolaedis Jia Liu Contact: Tom Young Contact: Robin Luo 505-462-2190 +86-15267030962 Phone: 505-843-1418 Phone: +86-13621785753 FAX: NA FAX: NA klaus.nicolaedis@unirac.com om Email: toddg@unirac.com Email: ji buwan.luo@cxymj.com buwan.luo@cxymj.com Party Authorized To Apply Mark: Same as Manufacturer Report Issuing Office: Lake Forest, CA U.S.A. Control Number: 5003705 Authorized by: for Dean Davidson, Certificati anager c. US LISTED Intertek This document supersedes all previous Authorizations to Mark for the noted Report Number. This Authorization to Mark is for the exclusive use of Intertek's Client and is provided pursuant to the Certification agreement between Intertek and its Client.Intertek's responsibility and liability are limited to the terms and conditions of the agreement.Intertek assumes no liability to any party,other than to the Client in accordance with the agreement,for any loss,expense or damage occasioned by the use of this Authorization to Mark.Only the Client is authorized to permit copying or distribution of this Authorization to Mark and then only in its entirety.Use of Intertek's Certification mark is restricted to the conditions laid out in the agreement and in this Authorization to Mark.Any further use of the Intertek name for the sale or advertisement of the tested material,product or service must first be approved in writing by Intertek.Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification mark in accordance with the agreement,they are not for the purposes of production quality control and do not relieve the Client of their obligations in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road,Arlington Heights, IL 60005 Telephone 800-345-3851 or 847-439-5667 Fax 312-283-1672 Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat- Plate Photovoltaic Modules and Panels [UL 2703: 2015 Ed.1] Photovoltaic Mounting System, Sun Frame Microrail - Installed Using Unirac Installation Guide, Rev Product: PUB2019MAR01 with Annex North Row Extension Installation Guide Rev PUB2019FEB20 Brand Name: Unirac Models: Unirac SFM ATM for Report 102393982LAX-002 Page 1 of 1 ATM Issued: 9-Apr-2019 ED 16.3.15(20-Apr-17)Mandatory P78 structu ra ENGINEERS January 20, 2021 Unirac 1411 Broadway Blvd. NE Albuquerque, NM 87102 Attn.: Unirac- Engineering Department Re: Engineering Certification for the Unirac U-Builder 2.0 SOLARMOUNT Flush Rail PZSE, Inc. -Structural Engineers has reviewed the Unirac SOLARMOUNT rails, proprietary mounting system constructed from modular parts which is intended for rooftop installation of solar photovoltaic(PV) panels; and has reviewed the U- builder Online tool.This U-Builder software includes analysis for the SOLARMOUNT LIGHT rail, SOLARMOUNT STANDARD rail, and SOLARMOUNT HEAVY DUTY rail with Standard and Pro Series hardware. All information, data and analysis contained within are based on, and comply with the following codes and typical specifications: 1. 2020 Florida Building Code, by Florida Building Commission 2. Minimum Design Loads for Buildings and other Structures, ASCE/SEI 7-16 3. 2018 International Building Code, by International Code Council, Inc. w/Provisions from SEAOC PV-2 2017. 4. 2018 International Residential Code, by International Code Council, Inc. w/ Provisions from SEAOC PV-2 2017. 5. AC428, Acceptance Criteria for Modular Framing Systems Used to Support Photovoltaic (PV) Panels, November 1, 2012 by ICC-ES. 6. 2015 Aluminum Design Manual, by The Aluminum Association,2015 Following are typical specifications to meet the above code requirements: Design Criteria: Ground Snow Load =0- 100 (psf) Basic Wind Speed =85- 190 (mph) Roof Mean Height=0-60 (ft) Roof Pitch =0-45 (degrees) Exposure Category= B, C& D Attachment Spacing: Per U-builder Engineering report. Cantilever: Maximum cantilever length is L/3,where "L" is the span noted in the U-Builder online tool. Clearance: 2"to 10" clear from top of roof to top of PV panel. Tolerance(s): 1.0"tolerance for any specified dimension in this report is allowed for installation. Installation Orientation: See SOLARMOUNT Rail Flush Installation Guide. Landscape- PV Panel long dimension is parallel to ridge/eave line of roof and the PV panel is mounted on the long side. Portrait- PV Panel short dimension is parallel to ridge/eave line of roof and the PV panel is mounted on the short side. 1478 Stone Point Drive, Suite 190, Roseville, CA 95661 916.961.3960 916.961.3965 VV www.pzse.com Experience I Integrity Empowerment P78 structu ra ENGINEERS Components and Cladding Roof Zones: The Components and Cladding Roof Zones shall be determined based on ASCE 7-16 Component and Cladding design. Notes: 1) U-builder Online tool analysis is only for Unirac SM SOLARMOUNT Rail Flush systems only and do not include roof capacity check. 2) Risk Category II per ASCE 7-16. 3)Topographic factor, kzt is 1.0. 4)Array Edge Factor Ye= 1.5 5)Average parapet height is 0.0 ft. 6) Wind speeds are LRFD values. 7)Attachment spacing(s) apply to a seismic design category E or less. Design Responsibility: The U-Builder design software is intended to be used under the responsible charge of a registered design professional where required by the authority having jurisdiction. In all cases, this U-builder software should be used under the direction of a design professional with sufficient structural engineering knowledge and experience to be able to: • Evaluate whether the U-Builder Software is applicable to the project, and • Understand and determine the appropriate values for all input parameters of the U-Builder software. This letter certifies that the Unirac SM SOLARMOUNT Rails Flush, when installed according to the U-Builder engineering report and the manufacture specifications, is in compliance with the above codes and loading criteria. This certification excludes evaluation of the following components: 1) The structure to support the loads imposed on the building by the array; including, but not limited to: strength and deflection of structural framing members,fastening and/or strength of roofing materials, and/or the effects of snow accumulation on the structure. 2) The attachment of the SM SOLARMOUNT Rails to the existing structure. 3) The capacity of the solar module frame to resist the loads. This requires additional knowledge of the building and is outside the scope of the certification of this racking system. If you have any questions on the above, do not hesitate to call. DIGITAL SIGNATURE \\��IIIIIIIIII/���i Prepared by: ��S`Q �CEIVSC,S�����i PZSE, Inc.—Structural Engineers �� �- F • -151 Roseville, CA No. 73522 THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY PAUL — K. ZACHER, PE ON 01/20/2021 USING A SHA-1 AUTHENTICATION CODE. j * EXR 02/28/202.3 PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED ***.�;�QRI�P****\���\ AND SEALED AND THE SHA-1 CODE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. / ONAL IX%\G�\\ 1111111 01/20/2021 1478 Stone Point Drive, Suite 190, Roseville, CA 95661 916.961.3960 916.961.3965 W www.pzse.com Experience I Integrity Empowerment