Loading...
HomeMy WebLinkAboutCreekside Lot 76 Eufer-not ready.pdf'ENGINEERlwCr SCIENCES INSPECTION RESULTS Inspection Date: (, I — Permit too. Project: Address: Q � Check one: Regular Inspection: Reinspection Date of initial Inspection: IF — Inspection Type Requested (check): D'Inq-1D11 BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Dud Rough4n Slab Floor Rough -in Rough -In Steam Piping & T Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Te! Framing Panel/Feeder Gas Piping & Test Cond- Piping & Te Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment, Fixtures Wall & Ceiline Protection ) Final Building ) ) Final Electrical ) j Final Plumbing I TFinal Mechanical Other Inspection Type: Area Inspected/Code: 10 3 7 , U I,_P� Inspection Results: 0 AP -Approved ❑ AE Approved with Exceptions ❑ DA-Disaliowed 0 DP -Disapproved Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name: -�J OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com