Loading...
HomeMy WebLinkAboutReport of Field Density TestsGa I I le & A S S O C I A T E S Project G_eotechnicaI • Geological • Environmental • Construction Materials . Construction Financial Services Consultants ❑ Birmingham,AL ❑ Oxford,AL ❑ Cullman,AL ❑ Tuscaloosa,AL Page of Density Reports ❑ Marietta, GA ❑ Pensacola, FL Additional Reports Included: REPORT OF FIELD DENSITY TESTS Observation Drawings Lft Z A Date O - D� Weather/Temperature Test Conducted On: Full Time Basis dl On Call per Client ❑ ��1 Project Contractor l�y le /��^so"��r� ?Number en::9— CDi o/<jJ Technician Se��✓^/ Gauge: Make ffum '-p — Density Standard S d� Model Sao / '6z_ Moisture Standard S/N o/7-?b Adjustment Test Dry % % of % -Probe No. Proctor Density Moist QProctor Required Lift/Elev Depth Fail Pass XC)6 Fr 02 Location 6X-4Da la,� ✓ SL!-�d i TGS' - 51-4 3 �, r 3 , - -%g. 2 d Ad, .5 Ad, .5 6 � 19.0 lol 7 ice. -_ - os /3.3 199. ✓ lit --` Lt_U `71____ �I Compaction Equipment Used: Vibratory 9/ Rubber -Tired ❑ Vibratory Plate Non -Vibratory ❑ Jumping Jack ❑ Smooth Steel Drum ❑ Other: Sheepsfoot ❑VUl 4 1 iXUbkfo6t ❑ ;, IP-___ l Elevations are Approximate and Estimated By: Tech Reference: Grade Stake ❑ Existing Grade Gd/ Client ❑ Estimate from Landmark: GC ❑ GradingContractor u'""'-'>:_ [; '-Ot r tv Locations are Approximate and Estimated By: Tech 9Z Client ❑ Reference: Survey Stake ❑ Site Drawings 6__*� Estimate from Landmark: GC ❑ Grading Contractor ❑ Other: A copy of this report was left on site with of (company) This is a draft copy and shall not be considered a final copy Revised: 08/19/04 Proctor Maximum optimum Moisture Method Description Rork %Densit Client/Contractor shall contact Gallet & Associates if % of Proctor, lift/elev, or location are not included on this report. Part-time testing can result in fill being placed without sufficient testing. Our tests verify compaction levels at the particular test location and onlywithin the eight inches (approximate) of fill below D the elevation at the time of testing. These results do not reflect the compaction level of other fill layers. gned by Engineer/Project Manager: Di3 Form No: F4 Geotechnical • Geological • Environmental • Construction Materials Construction Financial Services Consultants 4 ❑ Birmingham,AL ❑ Oxford,AL ❑ Cullman,AL ❑ Tuscaloosa, AL Page of —2, Density Reports ❑ Marietta, GA ❑ Pensacola, FL Additiaf is Included: & A S S O C I A T E S REPORT OF FIELD DENSITY TESTS Observati Drawings Project Date /0' /'L 6T— Weather/Temperature Test Conducted On: Full Time Basis Is/ On Call per Client ❑ D e /�//I SoN e�r7 Project �lOS L GC O d Contractor N / Number lQ Technician Gauge: Make Density Standard Model Moisture Standard S/N Adjustment Test No. Proctor Dry Density % Moist % of Proctor % Required Lift/Elev Probe Depth Fail Pass Location !n . % spa 6 la'' ✓ S E� 1 v 9 ._2 ✓ /a S s q9. 7 ✓ 13 17s.2 /3 g7. ✓ Compaction Equipment Used: Vibratory V Non -Vibratory ❑ Smooth Steel Drum ❑ Sheepsfoot ❑ Brickfoot ❑ Rubber -Tired ❑ Vibratory Plate 5// Jumping Jack ❑ Other: Elevations are Approximate and Estimated By: Tech Ee/ Client ❑ GC ❑ Grading Contractor ❑ Other: Reference: Grade Stake ❑ Existing Grade lJ' Estimate from Landmark: Locations are Approximate and Estimated By: Tech Client ❑ GC ❑ Grading Contractor ❑ Other: Reference: Survey Stake ❑ Site Drawings �/ Estimate from Landmark: A copy of this report was left on site with of (company) Remarks: + ' This is a draft copy and shall not be considered a final copy Revised: 08/19/04 Proctor um �Qen'sit Optimum MoistureRock Method Description °�° . Client/Contractor shall contact Gallet & Associates if % of Proctor, lift/elev, or location are not included on this report. Part-time testing can result in fill being placed without sufficient testing. Our tests verify compaction levels at the particular test location and only within the eight inches (approximate) offill below the elevation at the time of testing. These results do not reflect the compaction level of other fill layers. signed by Engineer/Project Manager: L3 Form No: F4