Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Creekside Lot 9 Strapping.pdf
l L'gL UffnnIziML: Gh"GFkE��tkeG bClbfs`.0�� �� INSPECTION RESULTS Inspection Date: 0 _/ 0� Permit No. Project: / fj, n Address: 3 3 ! � Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection: F `- / '� - Inspection Type Requested (check): nUILVING/STRUCTURAL ELECTRICAL PLUMBING MECM Footing Underground Underground Duce Rc Slab Floor Rough -In Rough -In fWail/Ceiling Masonry Wall Rough -in Stack Piping &Tesi iSteam W F4piP Ceiling Roghi Water Pi in &Test g C.W Pip Framing Panel/Feeder Gas Piping &Tesi Cond. Pll Structural Service/Ground Storm Piping & Test Insuiati- Sheet Rock Appliance/Equipment Fixtures ..._..., _ ( Final Building Final Electrical Final Piumbine Other Inspection Type Area Inspected/Code: Inspection Results: WAP-Approved O AE-Approve�with eptions ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspectors Name: ❑ DA-Dlsailowed �J OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34486 . (772) 424-3575 - (772) 424-3580 (fax) www.teamgfa.com ng&T & Test &Te! 6&Te