HomeMy WebLinkAboutGENERAL INFORMATION SECTION AST. LUCIE WORKS
Master Permit No.
Section A (General Information).
Process No.
Contractors Name: Total Home Roofing License # CM 330489
Job Address 2311 St. Lucie Blvd Fort Pierce, FI 34946
ROOF CATEGORY
XLow Slope ❑ Mechanically Fastened Tile ❑ Mortar/Adhesive Set Tiles
Asphaltic Shingles ❑ Metal Panel/Shingles Mood Shingles/Shakes
❑ Prescriptive BUR-RAS 150
ROOF ROOF TYPE.
❑ New roof ❑ Repair ❑ Maintenance ,;Reroofing ❑ Recovering
ROOF SYSTEM INFORMATION
Low Slope Roof Area (SF) 3419 Steep Sloped Roof Area (SF) Total (SF) 3419
Section B (Roof Plan)
Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains. Include
dimensions of sections and levels, clearly identify dimensions of elevated pressure zones and location of parapets.
ST. LUCIE WORKS
Section C (Low Slope Roof)
Fill in specific roof assembly components and identify
manufacturer
(If a component is not used, identify as "NA")
System Manufacturer: Certalnteed
Product Approval No.: FL2533-R26
Design Wind Pressures, From RAS 128 Or Calculations:
Zone 1': "34•6Zone 1' -0 3Zone 2: Zone 3: 108.4
Max. Design Pressure, from the specific product approval
system: -127.5
Deck:
•,
Gauge Thickness: 1 /8"
Anchor/Base Sheet & No. df Ply(s):
Anchor/Base Sheet Fastener/Bonding Material:
Insulation Base Layer:
Base Insultation Size and Thickness:
Base Insulation Fastener/Bonding Material:
Top Insulation
Top Insulation Size and Thickness:
Top Insulation Fastener/Bonding Material:
Base Sheet(s) & No. of Ply(s): FIIntinAtIC
Surfacing:
Fastener Spacing for Anchor/Base Sheet Attachment:
Zone 1':_"
oc @ Lap, # Rows_
@ _ oc
Zone 1:—"
oc @ Lap, # Rows
— @ _ oc
Zone 2:_"
oc @ Lap, # Rows
_ @ —" oc
Zone 3:_"
oc @ Lap, # Rows_
@ _" oc
Number of Fasteners Per Insulation Board:
Zone 1':_Zone 1:one 2:—Zone 3:_
Illustrate Components Noted and Details as Applicable:
Woodblocking, Gutter, Edge Termination, Stripping,
Flashing, Continuous Cleat, Cant Strip, Base Flashing,
Counterflashing, Coping, Etc...
Indicate: Mean Roof Height, Parapet Height, Height of Base
Flashing, Component Material, Material' Thickness, Fastener
Type, Fastener Spacing or Submit Manufacturers Details that
Comply with RAS 111 and Chapter 16..
FT.
Flintlastic
Flintlastic I I FT.
Base Sheet Fastener/Bonding Material: Drip Edge: 3" X 3" Galy Alum
SA
Ply Sheet(s)' & No. of Ply(s):
Ply Sheet Fastener/Bonding Material:
Top Ply: Flintlastir.
Top Ply Fastener/Bonding Material:
SA
Parapet
Height
15'
Mean
Roof
Height