HomeMy WebLinkAboutSub-Contractor Agreement111( HARD K. DAVIS CONSTRUCTION CORPORATION
4205 Metzger Road, P. O. Box 186, Fort Piece, FL 34954 Phone (772) 461-8335
SUB -CONTRACT AGREEMENT
THIS SUB -CONTRACT AGREEMENT (hereinafter "Agreement") is entered into by and between RICHARD K. DAVIS CONSTRUCTION CORPORATION,
a Florida corporation, (hereinafter "Contractor") and A & G CONCRETE POOLS, INC., (hereinafter "Subcontractor'), and becomes effective when the last one
of the Contractor and Subcontractor has signed this Agreement.
RECITALS:
A. Proiect Contractor is the "General Contractor" for the construction of improvements more specifically described as follows:
New Building Construction for PURSUIT BOATS, PLANT EXPANSION
having a street address of: Adjacent to 3891•St. Lucie Blvd., Fort Pierce, Florida 34946, Property Tax Folio #1432-211-0002-000-2
B. Plans and Specifications_ Copies of the plans, drawings and specifications for the 'Project" shall be kept at the offices of the Contractor.and/or at the
"Project". The "Plans and Specifications" are identified as follows and are incorporated herein by reference:
Design Professionals: Drawings: Dated:
SEE DRAWINGS LIST ATTACHED, ATTACHMENT "A"
C. Scope of 1M0rk The Subcontractor shall be responsible for furnishing the material, labor and equipment necessary to complete the following portion of
the "Project" in accordance with the "Plans and Specifications": Provide labor, material and equipment to complete the Installation of a pool within the
proposed building as shown on the construction documents enumerated above. The pool construction shall include engineered construction
drawings and permitting, a steel reinforced gunite pool shell measuring (interior dimensions)15'-0" X 55'-0" X 4'-0" water depth, flexcrete
waterproofing walls and floor, "Florida Stucco" gem finished interior, two (2) skimmer filtration system, one (1) filter pump, one (1) Inline chlorinator
and a 300 watt light. A raised concrete perimeter curb (approx. 6-8" above the finished floor slab) shall be constructed to help retain water in the
pool.
D. Contract Sum. Consideration of full performance by Subcontractor of the "Scope of Work" and for performance of all of the terms and conditions of this
Agreement, shall be the sum of $42,430.00 (forty-two thousand four hundred eight dollars and no cents)
NOW THEREFORE, in consideration of the "Contract Sum" set forth hereinabove and in further consideration of the mutual covenants contained herein,
the parties hereto agree as follows:
1. Construction. The Subcontractor shall be responsible for construction and completion of the "Scope of Work" in accordance with the "Plans and
Specifications" and upon the following terms and conditions:
a. Unless otherwise specifically noted, the Subcontractor shall provide and pay for all labor, materials, equipment, tools, machinery, transportation, and
other facilities and services necessary for the proper completion of the "Scope of Work".
b. All materials and equipment incorporated into the Subcontractor's "Scope of Work" shall be new unless otherwise specified, and all work will be
performed in a workmanlike manner and will be of good quality.
c. The Subcontractor shall pay all sales tax, FICA and unemployment compensation taxes upon the material and labor furnished under this Agreement
and as otherwise required by law.
d. The Subcontractor shall keep the premises free from accumulation of waste materials or rubbish caused by its operations. At the completion of the
Subcontractor's "Scope of Work", it shall remove all of its waste materials and rubbish from and about the "Project" as well as its tools, equipment,
machinery and surplus materials.
e. The Subcontractor shall abide by all rules, regulations and directives promulgated by O.S.HA.
f. Work on Sunday is prohibited except under extenuating circumstances and with the prior approval of the Contractor.
2. Time of Commencement and Completion. The Subcontractor shall commence work at such time (hereinafter "Commencement Date"), and in such
sequence, as directed by the Contractor in accordance with the Contractor's schedule (which schedule is subject to change as conditions require). The work
shall be completed (hereinafter "Completion Date") in accordance with the. Contractor's schedule. The Subcontractor shall be liable to Contractor for all losses
and damages incurred by the Contractor due to inexcusable delay of the Subcontractor in the completion of the work, including delay costs not reimbursable
from the Owner or if the Subcontractor's "Scope of Work" is not completed by the Completion Date for any reason other than an act of God, fire, war, union
strike, Change Orders or Contractor interference, then Subcontractor shall be penalized the sum of $400.00 and shall be further penalized the sum of $400.00
for each day thereafter until the work is completed. Said penalties shall be deducted from the "Contract Sum". If the aggregate penalties exceed the amount of
the remaining undisbursed "Contract Sum", then the Subcontractor shall pay the difference to the Contractor. Time is of the essence.
3. Disclosure of Defects. Prior to commencement, the Subcontractor shall inspect the "Project" and shall disclose to Contractor in writing any defects and
conditions observed, or otherwise known to Subcontractor, which would adversely affect the quality of the Subcontractors work or interfere with the
Subcontractor's ability to perform in a timely fashion and in accordance with the "Plans and Specifications"_ Failure to make such disclosure in writing prior to
commencement shall constitute full waiver by the Subcontractor of any reliance upon the defect or condition as a defense to any claim, cause of action or
penalty arising against the Subcontractor under this Agreement.
4. Change Orders. No change or deviation shall be made with respect to the Subcontractor's "Scope of Work" except in accordance with a written "Change
Order" agreed upon in advance and executed by the Contractor and the Subcontractor. The Subcontractor shall not be entitled to any payment for additional
work, materials or changes without such fully executed Change Order.
5. Insurance. Prior to commencement of work, the Subcontractor shall deposit Certificates of Insurance with the Contractor evidencing the following types of
coverage and limits of liability:
a. Commercial General Liability Policy (hereinafter "CGL') with limits of insurance of not less than $1,000,000 each occurrence and $1,000,000
Annual Aggregate. If the CGL coverage contains a General Aggregate Limit, such General Aggregate shall apply separately to each project. CGL
coverage shall cover liability arising from premises, operations, independent contractors, products -completed operations, and personal injury. The
Subcontractor shall maintain the CGL coverage for the duration of the "Project" and thereafter maintain Completed Operations coverage for at least one
year (12 months) after completion of the work-
b. Business Automobile Liability Policy with limits of insurance of not less than $1,000,000 each accident. The policy must include coverage for
liability arising out of all owned, leased, hired and non -owned vehicles.
c. Workers Compensation and Employer's Liability Policies with Employer's Liability Insurance limits of at least $100,000 each accident for bodily
loft
injury, $500,000 disease policy l_ and $100,000 each employee for injury by disease. I
The policies of insurance shall (i) require the insurance company to provide Contractor with at least thirty (30) days written notice before such policy is
altered or canceled in any manner, (ii) shall include a standard waiver of subrogation clause against the Contractor, Owner of the "Project" and architect; (iii)
shall be issued by companies, associations or organizations having a. current rating of not less. than "A" as rated by A.M. Best Company, (iv) shall include the
Contractor and Owner of the "Project" as additional insured, (v) shall apply as Primary Insurance before any insurance or self insurance (including any
deductible) maintained by, or provided to the Contractor and/or Owner of the "Project", and (vi) provide that coverage is on an "occurrence basis" as opposed to
a "claims made" basis. Subcontractor waives all rights against Contractor, Owner of "Project' and Architect and their agents, officers, directors and employees
for recovery of damages to the extent these damages are covered under the policies of insurance. If Subcontractor shall fail to maintain any insurance as
required by this Agreement, then the same shall constitute a default under this Agreement and Subcontractor shall be liable for any and all claims or damages
which would otherwise be covered under such policies of insurance.
6. Indemnification. Subcontractor agrees to indemnify and hold Contractor harmless from and against any and all damages, losses, actions, causes of
action and claims of whatsoever kind and nature which might be asserted against (or suffered by) Contractor by reason of the performance or non-performance
of Subcontractor under this Agreement, specifically including, but not limited to, those damages arising from accidents and occurrences occasioned by, or
contributed to, the negligence, sole or concurrent to any degree, of the Subcontractor, its sub -subcontractors, agents, servants or employees. Subcontractor
shall further indemnify and hold Contractor harmless from any and all expenses arising from Contractor's investigation of said accidents and occurrences, and
any claims resulting therefrom. Subcontractor shall defend all suits brought against the Contractor on account of any such accidents or occurrences and shall
reimburse Contractor for any and all expenses of defending said suits, including reasonable attorney's. Subcontractor agrees that the indemnity obligations
herein are clear and unambiguous, that one percent (1%) of the "Contract Sum" constitutes specific and valid consideration payable to Subcontractor for the
indemnity obligations, and that Subcontractor shall comply in all respects with Florida Statutes §725.06.
7. Payment of Contract Scam. The Subcontractor shall submit an Application for payment for all work performed and materials supplied (with a 10.0%
retainage held against all Applications for payment to a limit of $100,000, thereafter the retainage withheld shall be reduced to 5.0%) by the 25th day of the
month if the Subcontractor is to be included in that month's (or periods) draw request. The Subcontractor shall utilize the form of Application prescribed by the
Contractor and the submitted Application shall be accompanied by a properly completed Partial Release of Lien, (effective through the date of submission).
Both the Application and the Partial Release of Lien shall contain the original signature of the Subcontractor's authorized officer or agent No facsimiles shall be
accepted. Payment shall be made on or about the 25th day of the month following the timely submission of the Application and Partial Release of Lien. The
Subcontractor must submit a properly completed and executed Final Application for payment and Final Release of Lien prior to final payment under this
Agreement. Upon request, the Subcontractor shall also provide an affidavit stating that all sub -subcontractors and materialmen have been paid in full as a
prerequisite to final payment. Final payment shall be subject to Contractor's full satisfaction and acceptance of Subcontractor's work and, if found to be
satisfactory and acceptable, shall be paid on or about the 25th day of the month following the timely submission of the required items. All payments are
conditioned upon receipt by Contractor of full payment from Owner (including retainage).
8. Miscellaneous.
a. Attorney's Fees: If it becomes necessary for either party to obtain the services of an attorney to enforce the provisions herein or relating to the
"Project", the prevailing panty shall be entitled to collect from the other party reasonable attorney's fees and all costs incurred, whether or not litigation is
necessary and including all appeals.
b. Assignment: This Agreement shall not be assigned by the Subcontractor without the prior written consent of the Contractor, which consent may I
withheld at sole discretion of the Contractor.
c. Interpretation: This Agreement has been submitted to the scrutiny of each party hereto and each party has had opportunity to have it reviewed by
legal. counsel. This Agreement shall be given fair and reasonable interpretation in accordance with the words used herein without consideration or weight
being given to its having been drafted by either party hereto or their respective legal counsel.
d. Counterparts: This Agreement may be executed in two or more counterparts, each of which shall be, and shall be taken to be, an original, and all
collectively deemed one instrument.
IN WITNESS WHEREOF, the parties have executed this Agreement.
"CONTRACTOR" "SUBCONTRACTOR"
RICHARD K. DAVIS CONSTRUCTION A & G CONCRET OLS, INC.
CORPO TION, a Florida corps tion
By: By:
Print Roger Priest Print Name: 7"a Lto n ar-d
Print Title: Pro ect Mana er
Date: ' r
2 of 2
PB 14OLDM LLC
Pursuit Beats Plant Expamien
"ATTACHMENT A"
Design Professional
Drawin
Dated
Civil Drawings
Culpepper & Terpening Inc,
Sheets 1-21 Civil Drawings
6/12/2019
Landscape Drawings
Boggs Planning+ Landscape Architecture
Sheet 1-2 Landscape Drawings
7/18/2019
Irrigation Drawings
Boggs Planning + landscape Architecture
Sheet 1-3 Irrigation Drawings
6/19/2019
Architectairal Drawings
Donadio & Associates, Architects
Sheet A1.10 - Life Safety
7/18/2019
Donadio & Associates, Architects
Sheet A3.11- Code Review
7/18/2019
Donadio & Associates, Architects
SheetA1.12 - UL Design
7/18/2019
Donadio & Associates, Architects
Sheet A2.10 - Overall Floor Plan
7/18/2019
Donadio & Associates, Architects
Sheets A2.11 & A2.12 - Part Floor Plan - South/ North
7/18/2019
Donadio & Associates, Architects
Sheet 2.20 - Roof Plan
7/18/2019
Donadio & Associates, Architects
Sheets 4230 through A2.32 Enlarged Plans
7/18/2019
Donadio & Associates, Architects
Sheet A2.40 - Part Reflected Ceiling Plan
7/18/2019
Donadio & Associates, Architects
Sheet A3.10 - Exterior Elevations
7/18/2019
Donadio & Associates, Architects
Sheet A4.10 - Building Sections
7/13/2019
Donadio & Associates, Architects
Sheet A5.10 - Toilet Accessories & ADA Details
7/18/2019
Donadio & Associates, Architects
Sheets A6.10A & A6.1013 Door Finish Schedule/Door Hardware
7/18/2019
Donadio & Associates, Architects
Sheets A6.11 through A6.13 Door & Window Details
7/18/2019
Structural Drawings
ML Engineering, Inc
Sheets 5-1- Overall Key & Grid Layout Plan
7/18/2019
ML Engineering, Inc
Sheets 5-2 & 5-3 Partial North/South End Foundation Plan
7/18/2019
ML Engineering, Inc
Sheets 5-4,5-5, & S-9 Sections & Details
7/18/2019
ML Engineering, Inc
Sheet 5-6 -Typical Sections & Details, Schedules & General Notes
7/18/2019
ML Engineering, Inc
Sheets S-7 & S-8 Partial North/South End Roof Freaming Plan
7/18/2019
ML Engineering, Inc
Sheets 5-10 & 5-11 - Single/4 Panel Rolling Door Plan, Details & Elevation
7/18/2019
Mechanical Drawings
Cardinal Engineering Associates
Sheet M-OA - Mechanical- General Notes, Codes, Legends
7/18/2019
Cardinal Engineering Associates
Sheets M-00 & M-OC- Mechanical Schedules
7/18/2019
Cardinal Engineering Associates
Sheets M-OD & M-DE - Mechanical Details
7/18/203.9
Cardinal Engineering Associates
Sheet M-OF - Mechanical - Specifications
7/18/2019
Cardinal Engineering Associates
Sheets M-01 & M-02 Mechanical - Partial Area of Work plan
7/18/2019
Cardinal Engineering Associates
Sheets M-03, M-04 & M-05 - Mechanical - Enlarged Plan
7/18/2019
Cardinal Engineering Associates
Sheets M-06 & M-07 - Mechanical Floor Plans, Sections, and Elevations
7/18/2019
Electrical Drawings
Cardinal Engineering Associates
Sheet E-OA - General Notes, Specifications, Legends, Index
7/18/2019
Cardinal Engineering Associates
Sheet E-OB - Specifacations & Details
7/18/2019
Cardinal Engineering Associates
Sheet E-01-Site Plan - All Phases
7/18/2019
Cardinal Engineering Associates
Sheet E-02- Electrical Site Plan
7/18/2019
Cardinal Engineering Associates
Sheet E-03- Electrical Key Plan
7/18/2019
Cardinal Engineering Associates
Sheets E-04, E-06, E-08, E-10, E-12- E-13 - Partial Electrical Plan - North/South
7/18/2019
Cardinal Engineering Associates
Sheet E-07 - Electrical Room Plan - North
7/18/2019
Cardinal Engineering Associates
Sheets E-09, E-11- Roof Plan - North/South
7/18/2019
Cardinal Engineering Associates
Sheets E-14-E-15 - Partial Low Voltage Plan - North/South
7/18/2019
Cardinal Engineering Associates
Sheets E-16-E-19 - Partial Lighting Plan - North/South
7/18/2019
Cardinal Engineering Associates
Sheets E-20-E-21 Lighting Controls, Schedules & Mounting Details
7/18/2019
Cardinal Engineering Associates
Sheets E-22-E-23 - Panelboard Schedules
7/18/2019
Cardinal Engineering Associates
Sheet E-24 - Panelboards, Details, & Riser Diagram
7/18/2019
Plumbing Drawings
Cardinal Engineering Associates
Sheet P-OA - General Notes, Schedules, Codes, & Legends
7/18/2019
Cardinal Engineering Associates
Sheet P-OB - Details
7/18/2019
Cardinal Engineering Associates
Sheet P-OC - General Specifications
7/18/2019
Cardinal Engineering Associates
Sheets P-OS & P-03 - Gravity Piping - Overall Floor Plan
7/18/2019
Cardinal Engineering Associates
Sheets P-02 & P-04 - Pressure Piping -Overall Floor Plan
7/18/2019
Cardinal Engineering Associates
Sheet P-05 Gravity Piping - Enlarged Floor Plan
7/18/2019
Cardinal Engineering Associates
Sheet P-06 - Pressure Piping - Enlarged Floor Plan
7/18/2019
Cardinal Engineering Associates
Sheet P-07 - Gravity Piping - Schematic Riser Diagrams
7/18/2019
Cardinal Engineering Associates
Sheet P-08 - Pressure Piping - Schematic Riser Diagrams
7/18/2019
Addendums
Donadio & Associates, Architects
Addendum 01
7/25/2019
PERMIT # . I F -., —_ -1 I ISSUE DATE.
PLANNING & DEVELOPMENT SERVICES
Building &- Code Compliance'Division
'COUNTY
BUILDING PERMIT
SUB -CONTRACTOR AGREEMENT
A&G CONCRETE POOLS,INC have agreed -to be
(Company:Name/Indlvidual Name)
the pT.T TMRTNG Sub -contractor for A&G CONCRETE POO INC
(Type of Trade) (Primary Contractor)
For the project located at 3901 ST_ LUCTF. RI VD 3495
(Project Street Address or Property Tax ID #)
It is understood that, if there is any change of status regarding our participation with the above mentioned
project, the Building and Code Regulation Division of St. Lucie County will be advised pursuant tothe
filing of a Change of Sub -contractor notice.
CONTRACTOR
25959
COUNTY CERTIFICATION NUMBER
State of Florida, County of ST L.UCIE
�The
fore Ding instrument was signed before me this, ? day of
w'v 2011%__TAMES T LEONARD
who is personally (mown }C or has produced a
identification.
STAMP
igna of NotaryPublic
ANQFT A RORSODI—RTR1l WGRAM
Print Name of Notary Public
41
L,6'
Revised 11/16/2
((tuall6er)
TAMF_C T I-EnNARD
PRINT NAME
25959
COUNTY CERTIFICATION NUMBER
State of Florida, County of ST LUCIE
ostrurneat was signed before me this day.of
dmr,206,by
1AMES T LEONARD
who is personally known for has produced a _
as identification.
STAMP
4ignaturtary PublicOV
ANGELA BORSODI-BIRMINGHAM
Print Name of Notary Public
20 1G:
�•,+yt• `;
ANI BORSODI-BIRMINGHAM
Notary Public
p
-State of Florida
fission #GG
My Comm 249625
Expires Aug 16, 2022
Bonded through National
Notary Assn.
ANGF_A 30RSOD1.31RMINGHAMNotary ?uu�icState of Florida
,Commission # GG 249625
�My Comm. Expires Aug 16, 2022
Boreec through National Notary Assn.
PERMIT# ISSUE DATE
�(`�2�
PLANNING & DEVELOPMENT SERVICES
•
' Bu11dih9A :Code Compliance Division
BUILDING PERMIT -
SUB -CONTRACTOR AGREEMENT -
(Company Name/Individual Name j
have:agreed to be .
the .: PLUMBING (AUTO -FILL) Sub -contractor f0r A&G.CONCRETE POOLS,INC
(Type of Trade)
(Primary Contractor)
For the project located at 3901 ST LUCIE BLVD PORT ST LUCIE PL 34953:
(Project Street Address or Property Tax ID #)
It is .understood that, if there, is anY change of status.
regarding our participation,with the above mentioned
project, the Building and Code Regulation Division of 5t. Lucie County will be advised pursuant to the.
filing of a. Change of Sub -contractor notice:
CONTRACTORSIG er) CON OR "NATUdalilier) ;
AMES ARD�sT
PRI E PRINT NAME
25959
COUNTY CERTIFICATION NUMBER S*(I f(1� CERTIFICATION NUMBER
State of Florlda, County or ST LUCIE Stale of Florida, County of
WJ
The Ibregolog lostrwncut was slgned before.me'thls _L day of The foregoing instrument was signed before me this day of Y
ao f 'by_ JAMES T LEONARD , 20 (Al by
who is personally (mown 2_or.has produced a w6oU personally known or has produced a
as I nlllicaiioa. as identiB ion,
5ignatu olary Pub rc STAMP STAMP
Signature of. Notary ubs c
ri f e of Notary ubllc .
.. Print Name -of Notary. Public
10% - Notary Public State of Florida. .
ANGELA BORSODI-BIRMINGHAM 4' MAUREEN AMLEZ'-
Revised 1 �Q'. Notary Public- State of Florida MY Commission.GG 1285T8
'� o= Commission M GG 249625 Expires 70123f202t
a
'My Comm. Expires Aug 16, 2022
Bonded through National Notary Assn.
- asaunr�, �- e� D.�A/�', itV17h711lY�w
B atw! f MtY ruble t Sfgnture ofNeMry PuhOe •••.� * : COmt 7
,r t �' 1 Ann.
• _ �rld,Ff�p9�c 90fYb�YtLSI�V����� .
.Friel a .a ryPub➢e.: .: aae:ofPPolarYib
�islr Pue ., ANGELA BORSODI•BIRMINGHAM .:
Notary Public -State of Florice
t : o, Commission N.GG.249625
ReVitod l b6 :My Comm. Expires Aug 16, 2( Z2
Bonded through. National Notary kw . .