Loading...
HomeMy WebLinkAboutLetter8376 991P- C4: Vero- f3e -4L, R,3.2967 Job site info: Stephanie and Rick Pare 5311 East Echo Pines Ft: Pierce, FL 34951 Pool: Approximately 20ft, 9 inches by 33ft, 9 inches per design. 3 ft by 5 ft deep per design. Includes: • - Site Preparation - Soil Test - Engineering - Excavation a President: Chrystal Washburn Lic#Rp252555466 772-360-2240 Gunite and Back fill: Includes: - Steel re- enforced constructed gunite pool shell. - Back fill pool structure and compact at 1 foot intervals. -10 inch bond beam for area of pool exposed. Any unforeseen objects, other then natural deposits, will be additional cost to homeowner to dispose, such as fences,concrete, debris ect... Due upon receipt. Electrical Hookup: Includes: -All high voltage and low voltage wiring standard hookup. • - 60 Amp sub - panel. - 4 L.EM color jandy nicheless 24 watt pool lights Spa: Includes: • - 7ft diameter Built to spec. • - 3 feet deep with 4ft 6 inch spillway - 6 inch by 12 inch travertine coping • - 6 therapy jets - Channel drain, bench ,waterline tile and tile on the outside of spa . Contractor is responsible of all conductive materials within 5 ft. of waters edge includes handrails, windows, doors, screen enclosure ect...... Tile and Copping: Includes: -Homeowners choice of tile with allotted budget of $5.45 per Sq ft. - 6 inch by 12 inch tumbled travertine, homeowners color of choice. - "Thermo -Seal' behind waterline tile to prevent leaks. Anything above allotted budge will be considered a change order and is responsibility of homeowner .Due Upon acceptance. Deck: To be constructed per plan / per design. Includes: - 3 cm Travertine, pattern and size of choice with an allotted budget of $4.85 per sq ft - Deck bonding below the deck per the National Electrical Code for grounding around the perimeter of swimming pool. ( Equipotential Bond) - 2 inch decko- drain, color to match traveretine deck. - Travertine to be sealed See Warranty Info Anything above allotted budge will be considered a change order and is responsibility of homeowner .Due Upon acceptance. Equipment: -1- Pentair Energy Efficient 2.5 HP Variable Speed Filter Pump -1- Pentair 200 sq ft cartridge filter -1- 32 inch channel drain for feature pump. -1300 watt Intermatic transformer. Plaster: Includes: "Pebble" finish,homeowners choice of color. See warranty info. Standard Swimming Pool Features: Includes: - Deep end swim out with file trim edge - One Set of hand formed shallow end steps with file edge. Service and Instructions: Includes: - Initial start-up and instructions up to 30 days, chemicals and pool service. " Pool School ; a printed and scheduled guide, which details the series of events from contract signing through the end of construction. Filling swimming pool and swimming pool operating and care instructions. Insurance and licensing: General Liability - $1,000,000. Personal Injury - $1,000,000. General Aggregate - $2,000,000. Products - Comp/OP Aggregate- $2,000,000. " Pop Up" Coverage Copy of Insurance Certificate and State Registered License provided to HOA and Governing municipality Any landscaping and sod is the responsibility of homeowner to replace, more then 3 ft around the deck area. Contractor is not liable for any sprinkler or damaged to construction access, although we protect to the greatest length possible in a professional manner. All projects are to completed in a professional and timely manner. All safety barriers are to be upgraded To meet building regulations - responsible by homeowner. Deposit: Upon - Permit issuance Upon - Tank / inspection steel Upon - Gunite shoot Upon - Waterline completion Upon - Deck completion Upon - Plumbing completion Upon - Plaster Upon - Completion 25% 5 �O K/o . 20% 15% 5% 10% 5% 10% 5% r- Sign Homeowner Sign Contra r Total :$52,300.00 $13,075.00 $2,615.00 $10,460.00 $7,845.00 $2,615.00 $5,230.00 $2,615.00 $5,230.00 $2,615.00 FM