HomeMy WebLinkAboutTermite treatment. final Planning &Development Services
r 7,J r 7�! Building &Code Regulation Division
® 2300 Virginia Ave
__ ► Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT #: ZQo l� VU�w JOB ADDRESS: 1126 01
BUILDER/CONTRACTOR: 1LOVAI (0V9rftCj-6'0 AUK
PEST CONTROL CONTRACTOR: EVICT-A-BUG TERMITE&PEST CONTROL INC.
PEST CONTROL LICENSE #:JB175775
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
1;11&r ► ���Oti Z L
e feet if area treated: �SG Chemicals used:
C o
Percentage of solution: ��-J 'D Total gallons used: 756
Date of Treatment: u l�`� Time of Treatment: O
Footing Slab
1t Treatment 1s�Treatment
Re-Treat Re-Treat
Driveway Pools
1st Treatment / 1st Treatment
Re-Treat / Re-Treat
Other ✓✓✓ Perimeter for Final Inspections �n
Re Treatment /� 0 /�iY/���G
Re-Treat
Signature of Exterminator Date
Note: There must be a completed form for each required tmatrnentorre-treatment and this form must be on the job
site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re inspection
fee charged,
FBC104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistantjobsite posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
providing a copy for the person the permit is issued to and another copy for the building permit files, The Treatment
Certificate shall provide the product used, identity of the applicator, time and date of the treatment,site location, area
treated, chemical used,percent concentration and number ofgallons used, to establish a verifiable record of
protective treatment. If the so//chemical barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final bui/ding approval.
St Lucie County requires for the final inspection for CO,a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.
Revised 7/24/2014