Loading...
HomeMy WebLinkAboutLetter; Column consistency for FoundationApril 7, 2021 Mr. Roger Priest R K Davis Construction Corporation P.O. Box 186 Fort Pierce, FL 34954 Re: Maverick Boat Group — Phase 1 4551 St. Lucie Blvd. Fort Pierce, FL 34946 Project No: 17-122 Dear Mr. Priest: M L Engineering Inc. 2030 —371 Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 RECEIVED APR 12 1011 Permitting Department St. Lucie County Please be advised that the foundations for the north high side columns (as indicated in our documents for Project No. 17-122 on sheets S1-S8 dated November 2, 2017) were designed to support a planned future addition of a 125-foot-wide mirror -image utilizing the same type of structure and spans. To the best of our knowledge, the column reactions provided by Kirby Building Systems were found to be reasonably consistent with the design intent and accounted for the planned future addition as stated in their reaction summary. All foundations were designed with a maximum allowable soil bearing pressure of 2,500 psf, and will not be exceeded under the future design loads. However, the potential for differential settlement should always be considered when applying additional loads to any existing structure. Respectfully, ,11�� M THO, o. 4 520 ; ' SWE OF Michael Lue, P.E.0�; Consulting Engineer Michael A Lue State of Florida, Prof No. 47520. This item signed and sealed b, PE # 47520, on the d an SHA authenticatii this document are/n sealed & the SHA/a61 verified on�anyielectronic copies. 2021.04.07 13.06:18-04'00' mal Engineer, License been electronically :hael Anthony Lue, FL ndicated here using ide. Printed copies of )nside`d`igned & tication code, must be M L Engineering, Inc. 2030 37th Ave. Vero Beach, FL 32960 ph (772) 569-1257 / fax (772) 569-4041 Pagel