Loading...
HomeMy WebLinkAboutAPPROVED Slavsky Scope of Work(1)6118 SE Federal Highway Stuart, FL 34977 Tel: 772.288.6255 Fax: 772.286.2072 Jay & Carol Slaysky 605 NW Winter's Creek Palm City, FL 34990 ot �j DrvamMa6 July 6, 2021 We propose to furnish all labor and material to remodel your CABANA. Our scope of work includes the following: 1. Designs and planning 2. Job supervision 3. Floor and dust protection 1-u. Remove & dispose of bathroom cabinets & mirror, counter tops, disconnect & dispose of all vanity plumbing & toilet. Remove shower glass enclosure. Remove exhaust fan. Remove base molding. Uninstall vanity lighting temporarily to remove mirror. Keep & Do Not Disturb: Entire shower surround, Tile flooring Keep & Reuse: Vanity Lighting, shelf over toilet 5. Debris removal fees 6. Interior walls: Repair walls after mirror & toilet accessories has been removed 7. Doors & Trim: Install the following: Baseboard: 1x6 Flat Stock Molding Install new door hardware with deadbolt: 8. Plumbing: Install plumbing fixtures: All plumbing fixtures to be polished chrome Sink: Kohler Caxton Faucet: Moen Genta Shower Head & Valve trim Toilet: Sterling 9. Electrical: Install the following: Reinstall existing vanity light in same location Update one outlet & plate due to yellowing Update can light in shower with LED trim Update exhaust fan: Panasonic FV-08-11VQ1 (no light) Update bulbs in vanity light fixture to match LED can light Update 4 gang plate only (not switches) 10. Cabinets: Purchase and install new Showplace Evo Cabinet Door Style: Pendleton Cabinet Finish: Naval Cabinet Interior Finish: White Matching framed mirror 11. Quartz material: Install 3 cm (1 %" thick) Cambria Portrush for the following areas: Countertop Backsplash & Side splash Edge detail: Square/ Eased 12. Vinyl: Purchase and install the following luxury vinyl planking: Vinyl: Happy Floors Maui Teak 7"x48" Locations: Flooring & back wall of vanity & toilet as accent wall Flooring to be floating Accent wall will be glued down 13. Glass: Purchase and install frameless frosted shower glass enclosure with polished chrome finish Door to be 28" wide Unit to be 80" high 14. Cabinet Hardware: Install hardware on new cabinet 15. Accessories: Reinstall shower shelf above toilet Install the following: Paper Holder: Moen Towel Bar: Moen 16. Paint: All walls, doors & trim be wood filled, caulked and sanded to a paint ready position. Walls will receive two coats of finish paint Trim, doors, casing, & baseboard Bathroom door (Ceiling Paint Not Included) Paint Baseboard Walls 17. Daily clean-up & final clean up by professional cleaning company