HomeMy WebLinkAboutSlab_Pretreat_Form_River Dr. 3259 F.P. a'Planning & Development Services
- J = Building & Code Regulation Division
COUNTY2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT # : SLC 2106-0212
CONTRACTOR: Trusty's Pest Control
LICENSE #: JB183203
JOB ADDRESS: 3259 River Dr, Fort Pierce, FL 34981
BUILDER/CONTRACTOR:
PEST CONTROL
PEST CONTROL
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: 50
Percentage of solution: 0.06%
Date of Treatment: 08/20/21
XXX Footing
XXX 1st Treatment
Re -Treat
Driveway
1st Treatment
Re -Treat
Other
1st Treatment
Re -Treat
Chemicals used: Cross Check
Total gallons used: 50
Time of Treatment: 8:15 am
Slab
1st Treatment
Re -Treat
Pools
1st Treatment
Re -Treat
Perimeter for Final Inspection
Signature of Exterminator
Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job
site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection
fee charged
FBC 104.2.E Certificate of Protective Treatment for prevention of termites A weather resistant jobsite posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment
Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of
protective treatment. If the soil chemical barrier method for termite prevention is used final exterior treatment shall
be completed prior to final building approval,
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.