Loading...
HomeMy WebLinkAboutWINDOW REPLACEMENTNATURAL FLOW WINDOWS AND DOORS 391 NE BAKER ROAD STUART, FL. 34994 772m334-1011 June 15.. 2021 ^11RvHAN Oceana N I Unit 1202 if 40,44 VRIWill b MORH'�AN S�Ei2RL� � /�GTi'+*�9 � L. �cr)'►1 WINDOW REPLACEMENT - Remove existing windows and replace as follows Manufacturer,* CGI,,~ Sentinel Series Frame: Bronze aluminum Glazed: Grey impact glass - (1).31 x 50" single hung, kitchen - (2) 35 3/47V x 61" single hung with a mull bar, bedroom - All interior and exterior perimeters fully caulked - All demo and debris by Natural Flow Labor,and materials- $4,050.00 Date % 00W /N3 - 2 t • 50%deposit required upon Ck# ordering materi*a1sw $2,025-00 40% due upon commencement of work - $1,620.00 10 % balance due upon completion - $405000 *To use a credit card add 3 %* NOTE,� Permitting and engineering fees not included in above price. NOTE —CONCEALED OR UNKNOWN CONDTIONS — The above quote does not include labor or 9 .. materials for sub -surface or otherwise concealed physical conditions that could not be detected at the rime o.f this estimate, to include but not limited to,,) concrete issues, dry wall and window sills,, NOTE — Removal and re -installation of window treatments are the responsibility of the owner. Accepted by NATURAL FLOW WINDOWS AND DOORS 391 NE BAKER ROAD STUART, FL. 34994 772-334-1011 June 15, 2021 -Ma�seM- (5GRAL6 L )�%Jo Rr*lw �.�'� e41P4 Oceana N I Unit 1202 z��s �-f 1- 3 "� "3- coo 3P7 c� i 3 32 960 = I�►CP 144TtvlA21.w&-.s4ffl L. Gv� SLIDING GLASS DOOR REPACEMENT - Remove existing sliding glass doors. and replace as follows Manufacturer: Plaza Door Frame: Bronze aluminum Glazed,* Grey impact glass - (1) 141x 95 Y2" sliding glass door, 4 panel, with screens - (.1) 106x 95 V2"' sliding glass door, 3 panel, with screens - Set tracks in waterproof concrete - All assembly and installation fasteners to be stainless steel - Caulk all perimeters - Cart away.all demo and debris Labor and materials - $14,230.00 Date 7 - l 3 - 2 r Ck'111#11111 I(0 50% deposit required upon ordering materials - $7,5115*00 40% due upon commencement of work - $5,692-00 10% balance due upon completion of work - $1,423-00 *To use a credit card add 3 %* NOTE - Removal and re -installation of window treatments are the responsibility of the owner. NOTE,w The above price does not include permitting fees. NOTE - CONCEALED OR UNKNOWN CONDITIONS - The above quote does not include labor or materials for sub -surface or otherwise concealed physical conditions that could not be detected at the time of this estimate, to include but not limited to, concrete issues, drywall, or tiles cracks or chipped during the installation process. .M Accepted by