UES Project No: 3310.2100259.0000
Workorder No: 242881-1
Report Date: 08/23/2021
607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580
In -Place Density Test Report
Client: Panelli Fort Pierce, LLC UES Technician: Johnnie Smith
16460 SW 137th Avenue Date Tested: 08/17/2021
Miami, FL 33177
Project: CMT Wolflube Warehouse -Manufacturing Building Phase I
Post Office Road, Fort Pierce, St. Lucie County, FL 34981
Area Tested: Bldg 1 - 4774 S Jenkins Road, Ft. Pierce
Material: Fill
Reference Datum: 0 = Top of Final Grade
The tests below meet the 98% minimum compaction requirement.
Type of Test:
Field: ASTM D-6938 Nuclear Gauge Method
Laboratory: ASTM D1557 Modified Proctor
Test
No.
Location of Test
Range
Maximum
Density
(pcf)
Optimum
Moisture
(%)
Field Dry
Density
(pcf)
Field
Moisture
(%)
Soil
Compaction
(%)
Pass
or
Fail
1
Column Pads, Center, Grid Lines F
0-1 ft
105.2
11.5
104.1
9.9
99
Pass
-2
2
Column Pads, Center, Grid Lines G-
0-1 ft
105.2
11.5
104.1
10.1
99
Pass
2
3
Column Pads, Center, Grid Lines G-
0-1 ft
105.2
11.5
105.0
11.0
100
Pass
3
4
Column Pads, Center, Grid Lines G-
0-1 ft
105.2
11.5
104.6
9.9
99
Pass
4
5
Column Pads, Center, Grid Lines F-
0-1 ft
105.2
11.5
104.0
9.9
99
Pass
4
6
Column Pads, Center, Grid Lines F-
0-1 ft
105.2
11.5
103.6
10.1
98
Pass
3
7
Column Pads, Center, Grid Lines C-
0-1 ft
105.2
11.5
104.6
10.3
99
Pass
1.7
8
Column Pads, Center, Grid Lines E-
0-1 ft
105.2
11.5
103.6
10.3
98
Pass
1.7
9
Column Pads, Center, Grid Lines F-
0-1 ft
105.2
11.5
102.9
9.9
98
Pass
1-1.7
10
Column Pads, Center, Grid Lines G-
0-1 ft
105.2
11.5
102.6
10.1
98
Pass
1-1.7
11
Column Pads, Center, Grid Lines H-
0-1 ft
105.2
11.5
103.2
10.6
98
Pass
1-1.7
12
Column Pads, Center, Grid Lines J-
0-1 ft
105.2
11.5
104.3
10.7
99
Pass
1-1.7
13
Column Pads, Center, Grid Lines C-
0-1 ft
105.2
11.5
104.9
10.9
100
Pass
1-1.7
14
Column Pads, Center, Grid Lines A-
0-1 ft
105.2
11.5
105.1
11.2
100
Pass
C-1-1.7
15
Column Pads, Center, Grid Lines F-
0-1 ft
105.2
11.5
105.0
11.6
100
Pass
20- Cl-K
16
Column Pads, Center, Grid Lines F-
0-1 ft
105.2
11.5
104.8
11.2
100
Pass
20- C1-G
To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and
authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval.
Page 1
Remarks: Permit: 2012-0558
Reviewed By
GFA International, Inc
FBPE Registry No.4930
pOMINIC,�C'i
�`�.• VOENy`F 'Nq.'�
o: 'Y
* ; No. 84146
:Zu�`
STATE OF •: ?�(/`
''S�ONA� E�o•
Digitally signed by Thomas
D
M o n to n o: A 01410000000178
18498DCD000019A3
Date: 2021.08.23 13:17:35
-04'00'
Thomas Dominic Montano
Branch Manager
STATE OF FLORIDA
Professional Engineer No. 84146
This item has been digitally signed and sealed by Thomas Dominic
Montano on the date adjacent to the seal. Printed copies of this
document are not considered signed and sealed and the signature
must be verified on any electronic copies.
To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and
authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval.
Page 2