Loading...
HomeMy WebLinkAboutDensity Report Wolflube - Bldg 1 242881-1 DT-ds 08.17.21o���NTr� • cFol�Os g 2Universal w m 02Sciences G 9`S TFSTING'Company • UES Project No: 3310.2100259.0000 Workorder No: 242881-1 Report Date: 08/23/2021 607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580 In -Place Density Test Report Client: Panelli Fort Pierce, LLC UES Technician: Johnnie Smith 16460 SW 137th Avenue Date Tested: 08/17/2021 Miami, FL 33177 Project: CMT Wolflube Warehouse -Manufacturing Building Phase I Post Office Road, Fort Pierce, St. Lucie County, FL 34981 Area Tested: Bldg 1 - 4774 S Jenkins Road, Ft. Pierce Material: Fill Reference Datum: 0 = Top of Final Grade The tests below meet the 98% minimum compaction requirement. Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Laboratory: ASTM D1557 Modified Proctor Test No. Location of Test Range Maximum Density (pcf) Optimum Moisture (%) Field Dry Density (pcf) Field Moisture (%) Soil Compaction (%) Pass or Fail 1 Column Pads, Center, Grid Lines F 0-1 ft 105.2 11.5 104.1 9.9 99 Pass -2 2 Column Pads, Center, Grid Lines G- 0-1 ft 105.2 11.5 104.1 10.1 99 Pass 2 3 Column Pads, Center, Grid Lines G- 0-1 ft 105.2 11.5 105.0 11.0 100 Pass 3 4 Column Pads, Center, Grid Lines G- 0-1 ft 105.2 11.5 104.6 9.9 99 Pass 4 5 Column Pads, Center, Grid Lines F- 0-1 ft 105.2 11.5 104.0 9.9 99 Pass 4 6 Column Pads, Center, Grid Lines F- 0-1 ft 105.2 11.5 103.6 10.1 98 Pass 3 7 Column Pads, Center, Grid Lines C- 0-1 ft 105.2 11.5 104.6 10.3 99 Pass 1.7 8 Column Pads, Center, Grid Lines E- 0-1 ft 105.2 11.5 103.6 10.3 98 Pass 1.7 9 Column Pads, Center, Grid Lines F- 0-1 ft 105.2 11.5 102.9 9.9 98 Pass 1-1.7 10 Column Pads, Center, Grid Lines G- 0-1 ft 105.2 11.5 102.6 10.1 98 Pass 1-1.7 11 Column Pads, Center, Grid Lines H- 0-1 ft 105.2 11.5 103.2 10.6 98 Pass 1-1.7 12 Column Pads, Center, Grid Lines J- 0-1 ft 105.2 11.5 104.3 10.7 99 Pass 1-1.7 13 Column Pads, Center, Grid Lines C- 0-1 ft 105.2 11.5 104.9 10.9 100 Pass 1-1.7 14 Column Pads, Center, Grid Lines A- 0-1 ft 105.2 11.5 105.1 11.2 100 Pass C-1-1.7 15 Column Pads, Center, Grid Lines F- 0-1 ft 105.2 11.5 105.0 11.6 100 Pass 20- Cl-K 16 Column Pads, Center, Grid Lines F- 0-1 ft 105.2 11.5 104.8 11.2 100 Pass 20- C1-G To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 1 Remarks: Permit: 2012-0558 Reviewed By GFA International, Inc FBPE Registry No.4930 pOMINIC,�C'i �`�.• VOENy`F 'Nq.'� o: 'Y * ; No. 84146 :Zu�` STATE OF •: ?�(/` ''S�ONA� E�o• Digitally signed by Thomas D M o n to n o: A 01410000000178 18498DCD000019A3 Date: 2021.08.23 13:17:35 -04'00' Thomas Dominic Montano Branch Manager STATE OF FLORIDA Professional Engineer No. 84146 This item has been digitally signed and sealed by Thomas Dominic Montano on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 2