HomeMy WebLinkAboutBuilding PlansPROPERTY OWNER:
ATLANTIS III BY THE SEA CONDOMINIUM ASSOCIATION, INC.
10200 SOUTH OCEAN DRIVE, JENSEN BEACH, FL 34957
THE ATLANTIS BUILDING A CONDOMINIUM ASSOCIATION, INC.
10102 SOUTH OCEAN DRIVE, JENSEN BEACH, FL 34957
THE ATLANTIS BUILDING B CONDOMINIUM ASSOCIATION, INC.
10152 SOUTH OCEAN DRIVE, JENSEN BEACH, FL 34957
CIVIL ENGINEER:
MACKENZIE ENGINEERING & PLANNING, INC.
1172 SW 30TH STREET, SUITE 500,
PALM CITY, FL 34990
SHAUN G. MACKENZIE, P.E.
(772)286-8030
SURVEYOR:
ENGINEERING, DESIGN & CONSTRUCTION, INC.
10250 SW VILLAGE PARKWAY, SUITE 201,
PORT SAINT LUCIE, FL 34987
MICHAEL T OWEN
(772)462-2455
Perin
NTS
ST. LUCIE COUNTY, FL
nine Tnc -
MACKENZIE ENGINEERING
& PLANNING, INC.
1172 SW 30TH STREET,
SUITE 500,
PALM CITY,
FLORIDA, 34990
772-286-8060
CA29013 J
ATLANTIS BY SEA
CONDOMINIUM ASSOCIATION, INC.
ST. LUCIE COUNTY, FLORIDA
PROJECT NO.: SPMN,,,,,,,,,12202025902
Milr40rMr�:z-a�x�c�
VA� i 10N A as
ski
ATLANTIS III BY THE SEA COA, INC,
THE ATLANTIS BUILDING A COA, IN
THE ATLANTIS BUILDING B COA, INC
ST, LUCIE COUNTY, FLORIDA
acKe-I'lizie
Engineering & Planning, Inc.
md" 01 uwollkwl
PROJECT LOCATION
NO:
REVISION:
BY:
DATE:
1
SLC DRC COMMENTS #1
EJJ
01/27/21
SCALE: N.T.S.
APPROVED:SGM
DRAWN: EJJ
CHECKED:SGM
DATE: 02/16/2021
FIELD BOOK NO;
KNOW WHArs BELOW
\LWAYS CALL 811
HEFORF' YOU DIG
IYs fast.Its f7 A R's She law..
www.callsunshine.com
SHEET INDEX
SHEET NO.
C-1
_DESCRIPTION
COVER SHEEN
C-2
GENERAL NOTES & CONSTRUCTION DETAILS
C-3
CLEARING, DEMOLITION & LANDSCAPING PLAN
C-4
PAVING, GRADING & DRAINAGE PLAN
C-5
NORTH ENTRANCE GATE ENTRY DESIGN
C-6
SOUTH ENTRANCE GATE ENTRY DESIGN
C-7
CIRCULATION PLAN
THESE PLANS HAVE BEEN PREPARED IN ACCORDANCE
WITH AND GOVERNED BY ST. LUCIE COUNTY
ENGINEERING DEPARTMENT.
MACKENZIE ENGINEERING AND
PLANNING, INC.
1172 SW 30TH STREET, SUITE 500
PALM CITY, FL 34990
772-286-8030
CA # 29013
ATTENTION IS DIRECTED TO THE: FACT'TfHAT
THESE PLANS MAY HAVE BEEN ALTEREDIIN
SIZE BY REPRODUCTION. THIS MUST BE
CONSIDERED WHEN OBTAINING SCALED=,DATA.
2fo 5 -©30-7
ENGINEER'S CERTIFICATION REVIEWED FOR
CODE COMPLIANCE
ST. LUCIE COUNTY
BOCC
DATE: PROFESSIONAL ENGINEER FL. LICENSE NO. 61751
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY SHAUN G
MACKENZIE, P.E. ON THE DATE ADIACENTTO THE SEAL.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED
SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON
ANY ELECTRONIC COPIES.
MACKENZIE ENGINEERING AND PLANNING, INC.
1172 SW 30TM STREET, SUITE S00
PALM CITY, FL 34990
CERTIFICATE OF AUTHORIZATION 29013
SHAUN G. MACKENZIE, P.E. NO, 61751
Digitally signed
by Shaun G
MacKenzie
Date: 2021.04.07
13:46:36-04'00"
AECErvrD
SHAUN MACKENZIE, P.E. MAY 11 2021
FLORIDA LICENSE NO. 61751 Pormitmg
St. LUCIE Ccunty
lift
SHEET: C-1
OF: C-7
MACKENZIE ENGINEERING PROJECT NO.
206-001 All
ST. LUCIE COUNTY PROJECT NO.J§212
SPMN-12202025902 '�k
■
Scope of Work:
The Contractor shall furnish all materials, labor, equipment, tools, supervision, transportation and incidentals necessary to
construct grading, paving, drainage, roadway and entrance improvements in accordance with the provisions of these
Supplementary Conditions, Specifications and Drawings, entitled, "ATLANTIS BY THE SEA GATED ENTRY" issued DECEMBER
2020 and prepared by MacKenzie Engineering and Planning, Inc.
It is the objective of these documents to assure the total completion of the work required to provide functional, operable
and efficient drainage, roadway, and building improvements for the "AT ANTIS BY THE SEA GATED ENTRY".
Location:
The work is located in St. Lucie County, Florida.
Permits and Licenses:
Construction permits for certain elements of the project work have been obtained by the Owner, and the design and
construction requirements of the project reflect constraints and conditions imposed by these permits. These include
construction permits from St. Lucie County, FDEP and FDOT. The Contractor shall perform all work and shall construct
the project in accordance with the requirements of these permits and approvals, copies of which are available for his
review and use from the Engineer, upon request. Additionally, the Contractor shall secure all other work permits,
approvals or licenses required to perform the work, and he shall perform the work in strict accordance with those
permits, approvals, or licenses.
Reference to Other Documents:
specify For brevity,. reference may be made to other specifications or documents which will be used to or control the
materials placed in the work, the construction methods to be used, the tolerances that will be acceptable, and
contractual or legal obligations. The specifications shall include:
n
1. "Standard General Conditions of the Construction Contract," latest Edition., prepared by the Engineer's Jo
int Contract
Documents .Committee and published by the National Society of Professional Engineers. Reference shall be made:
"General Conditions:"
2. "Florida Department of Transportation Standard Specifications for Road and Bridge Construction, latest edition,"
published by the Florida Department of Transportation and any Supplemental Specifications thereto. Reference shall be
made: "FDOT Specifications.
3, "Florida Department of Transportation Roadway and Traffic Design Standards, Latest edition," published by the Florida
Department of Transportation. Reference shall be made: "FDOT Index."
4. American Society for Testing and Materials Specifications," latest edition. Reference shall be made: "ASTM."
5. "American Association of State Highway and Transportation Officials," latest edition. Reference shall be made:
"AASHTO."
6. St. Lucie County Utilities Water, Wastewater, & Reclaimed Water Construction Details, St. Lucie County Utilities ,
December 2019". Reference shall be made: "SLCU"
By reference, the documents cited above are made- part of these Supplementary Conditions and Specifications. The
Contractor shall have copies of each in his possession for use throughout this project work.
Additionally, the work shall be performed in accordance with all other applicable local, regional, state and Federal laws,
regulations and codes including, but not limited to, the Federal Occupational Safety and Health Act.
CONTRACT ISSUES
General Conditions:
Unless otherwise stated in these Supplementary Conditions, the provisions of the "Standard General Conditions of the
Construction Contract," referenced above, shall be used to govern all issues addressed in those General Conditions for this
project.
Owner —Engineer Relationship:
Any agreement between Owner and Engineer shall not be construed to provide any obligation from the Engineer to any
third parties including, but not limited to, any contractors (general or sub), nor to any successors in title to the Owner.
The rights under any agreement between Owner and Engineer insure only to those two parties.
Partial Payments:
Partial payments shall be calculated from quantities of work in place. These payments shall be based on the Agreement
unit prices and will be made on or about the 15th of each month for the previous month's progress. The Contractor
shall, after the first of each month, submit invoices for materials used and work performed for the previous month. The
Engineer will review all invoices before presenting them to the owner for payment. Ten percent (10%) of the amount due
and payable to the Contractor will be retained from each partial payment. Final payments will be accomplished as
prescribed in the Agreement.
THE DRAWINGS
Errors or Omissions in the Drawings or Specifications:
n elevations shown on the Drawings and
ns grades and t
"work, the Cont
ractor shall check dimensions, 9
Prior to initiation of the o 9
n the work can be accomplished as
summary of estimated quantities to ass
ure himself that .the are correct and that P
intended. The Contractor shall take no advantage of any apparent error or omission which he might discover, but will
immediately notify the Engineer who will then make such corrections and interpretations as he deems necessary for
reflecting the actual spirit and intent of the Drawings and Specifications.
Soil and Subsoil Conditions:
It Is the sole and exclusive responsibility of the Contractor to:
1. Place his own interpretation on any and all soil and subsoil data portrayed on the Drawings;
2. Perform his own soil and subsoil investigation to determine the nature, character, location and extent of all soil and
subsoil conditions that may affect his work; and
3. Include in his contract price considerations for all work necessary to assure that the soil and subsoil conditions will
meet the requirements of the Specifications and the applicable regulations of St. Lucie county.
THE WORK
Pre —Construction Conference:
Immediately after the Agreement has been awarded, the Engineer shall call a pre —construction conference prior to initiation
of the work at a place designated by him to review the construction aspects of the project. The meeting will be between
the Engineer and the Contractor. The Contractor shall present his tentative detailed working schedule for the project so
that it may be reviewed by the Engineer. Additionally, it will afford the Contractor an opportunity to have any questions he
may have on the work clarified by the Engineer. No work under the Agreement shall be commenced until after the Notice
to Proceed has been issued.
Estimated Quantities:
The quantities estimated for various items of work are only estimates, and may not reflect all the items of work or the
final quantities needed to complete the project. These quantities are subject to increase or decrease by the Owner to
make them conform to the program of work selected and the responsibility of the Contractor to do all work and to furnish
and install all improvements shown on the Drawings, whether they are shown in the estimated quantities, or whether the
final quantities are more or less than those estimated. Payment of all unit price work shall be on the basis stated in
Paragraph 11.9.1 of the General Conditions.
Horizontal and Vertical Control:
The Contractor shall construct the required improvements in the location shown on the Drawings, and shall use as horizontal
control points the parcel corners and benchmarks at the site for use in establishing the necessary elevations and grades.
The topographic survey and control points for this project were provided by Engineering Design & Construction, Inc.
Coo
rdination of Work with Others:
The Contractor shall coordinate his work with the workor improvements of others with regard to new construction, or for
the need of removal, relocation or alteration of existing facilities. This includes, but is not limited to, St. Lucie County
Public Works, St. Lucie County Traffic, Florida Department of Transportation, Florida Power & Light Company, FLA Public
Utilities Co, and their contractors, subcontractors, or agents.
Standards for Quality and Workmanship:
All materials, equipment and supplied furnished by the Contractor for permanent Incorporation in the work shall be new and
of quality standards specified. Workmanship shall be first—class and the finished product equal to the best accepted
standards of the trade for the category of work performed.
Power and Water:
All arrangements and costs for temporary power and water during construction shall be the responsibility of the Contractor.
Exiting Utilities and Structures:
Existing utilities, structures and facilities shown on the Drawings were located as accurately as possible from the records
examined. No guarantee Is made that all existing facilities are shown or that those shown are entirely accurate. The
Contractor shall assure himself of the actual location of the utilities, structures or facilities prior to performance of any
work in the vicinity. The utility companies or utility agencies will cooperate with the Contractor in locating underground
utilities that may be subject to damage or interruption of services during the Contractors operations. Prior to start of the
work, the Contractor shall request each utility agency to advise him of the location of their facilities in the vicinity. The
Owner will assume no liability for damages sustained or costs incurred because of the Contractor's operation in the vicinity
of existing utilities or structures, or to the temporary bracing and shoring of some. In the event that it is necessary to
shore, brace or swing a utility, the utility company or department affected should be contacted and their permission secured
as to the method used for any such work.
Restoration of Damaged Structures or Utilities:
It shall be the responsibility of the Contractor to repair, rebuild or restore to its former condition, any and all portions of
existing utilities, structures, equipment, appurtenances or facilities, other than those to be paid for under this Contract,
which may be disturbed or damaged due to this construction operation, at no cost to the Owner.
4acKenzie
Engineering & Planning, Inc.
MACKENZIE ENGINEERING
& PLANNING, INC.
1172 SW 30TH STREET,
SUITE 500,
PALM CITY, FL, 34990
772-286-8030
CA29013
Final Cleanup:
Upon completion of the work but before final payment will be made, the Contractor shall clear and remove from the
V
project area, all folsework, equipment, surplus and discarded materials, rubbish and temporary structures which result
AI
from the work under this Agreement, and shall restore in an acceptable manner all property which has been damaged
S
during the prosecution of the work. This shall include replacement of damaged landscape materials on a "like —for —like"
basis.
Guarantee:
M
All materials and the installation thereof which are furnished and installed by the Contractor, under the terms of the
C
Agreement, shall be guaranteed by the Contractor against defective workmanship, mechanical and physic al defects
c
leakage, breakage, and other damages and failure under normal operation for a period of one (1) year from the
d
date of final payment, said date to constitute the commencement of the one (1) year warranty period. All materials
and installations proving to be defective within the specified period of the guarantee shall be replaced, without cost
to the Owner, by the manufacturer or the Contractor. The period of guarantee of each such replacement shall be
from and after the date of installation thereof.
1.The Contractor shall be responsible for protecting all existing above -ground, underground, and on the surface
E
structures and utilities against the construction operation that may cause damage to said facility.
e
2.The locations of existing underground utilities are shown in an approximate way only and have not been
independently verified by the Owner or its representative. The Contractor shall determine the exact location of all
existing utilities before commencing work, and agrees to be fully responsible for any and all damages which might
d all underground utilities.
occasioned by the Contractor's failure to exactly locate and preserve any an g
I and olterat
3.The Contractor shall give adequate notification to all affected utility .owners for remove, relocation, a
II
of their existing facilities.
ion g
4.Where encountered, unsuitable material shall be removed to a depth and area determined by the Engineer and
a b the Engineer. Backflliin shall be in layers not
r select materialroved 9 Ye filled w(th clean granular sand o9 backPP Y
9
greater than 8" thickness and compacted to 100 percent of the maximum density as determined by AASHTO
T-99-C.
5.Contractor is responsible for checking actual site conditions before starting construction.
II
6.Street or highway restoration work is to be done as per local or state agency having jurisdiction.
7.The Contractor shall comply with all rules and regulations of the State, County and City authorities regarding
closing or restricting the use of public streets or highways.
8.Traffic control on all county and state highway rights -of -way shall meet the requirements of the Manual of
Uniform Traffic Control Devices (U.S. DOT/FHA) and the requirements of the state and any local agency having
jurisdiction.
9.Contractor to maintain positive drainage outfall during construction.
10.Contractor shall not use any public right-of-way for any staging loading/ unloading and/or staging of
equipment or supplies without proper permits from the appropriate regulatory agency.
ROADWAY PAVING, GRADING & DRAINAGE
CLEARING AND GRUBBING
All trees, brush, stumps, roots, grass, weeds, rubbish, and other obstructions resting on or lying within 12" below finished
grade or subgrade shall be completely removed for the full width of all road right- of -way and easements, swales, utility
easements and drainage easements. All work shall be performed in accordance with Section 110 of the Standard
Specifications.
DISTURBED AREAS
All areas disturbed by construction shall be sodded or planted and mulched as shown in the Landscape Plan.
Sodding: Within the limits delineated in the plans, the Contractor shall, after final grading and cleanup, establish a stand
of grass by furnishing and placing sod in accordance with Section 575 of the FDOT Specifications. The Contractor shall
water the sodded area to maintain moisture levels for optimum growth to assure a healthy stand of grass. Sod shall be
St. Augustine grass sod.
GRADING
Contractor shall perform all necessary grading to achieve the typical sections as per plan. All workmanship shall be in
accordance with the FDOT Specifications:
CONSTRUCTION STAKING
Construction staking is performed by the Contractor, loss or disturbance of control points due to negligence by the -
Contractor will be replaced at the Contractor's expense. Construction staking of property corners is to be maintained by
the contractor until project completion.
BASE
ROCK
Rock base shall be constructed of either limerock' material in accordance with Section 911 or cemented coquina shell
material in accordance with Section 915 of the FDOT Specifications.
Limerock `base shall be constructed in accordance with Section 200 and cemented coquina shell base shall be constructed
In accordance with Section 250 of the FDOT Specifications. Contractor shall provide rock pit certification for cemented
coquina shell material.
Rock base shall be constructed to the depth and limits as shown on the plan. The rock base shall be compacted to at
least 98% of the maximum density as determined by AASHTO T-180 and shall be primed.
PRIME AND TACK COAT
Prime and tack coats for the base course shall be in accordance with Section 300 of the FDOT Specifications.
ASPHALTIC CONCRETE SURFACE COURSE (ACSC)
Type 9.5 ACSC shall be constructed for the depth and limits shown on the plan in accordance with sections 320, 330, and
331 of the FDOT Specifications unless otherwise specified.
TESTING
The Contractor shall retain the services of an Owner approved independent testing laboratory to conduct all required tests
on subgrade, base and surface course materials. Test results must be submitted prior to any request for payment on the
above items.
The schedule for testing the pavement shall be as allows:
1. Subgrade:
square feet
a. Limerock Bearing Ratio (LBR) tests; if required, shall be taken at intervals of not more than 5,000
or closer as may be necessary.
b. Density tests shall be taken at intervals of not more than 5,000 square feet or closer as may be necessary.
2. Base:
a. Density tests shall be taken at intervals of not more than 5,000 square feet or closer as may be necessary.
All testing shall be taken in a staggered sampling pattern.
If any test Indicates that the work does not meet the specifications, the substandard item shall be reworked or corrected
at the Contractor's expense, Iuntil the provisions of these specifications
fications are met.
and retested,P P
All required testing to meet project specifications shall be paid for by the Contractor.
Certified copies of all test reports, for work performed, shall be submitted to the Engineer prior to approval of any
applications for payment.
SIGNING AND MARKING
Signing shall be in accordance with Section 700 and traffic point shall be in accordance with Section 710 of the FDOT
Specifications.
CONCRETE
Unless otherwise specified or indicated, all concrete shall have a minimum compressive strength at 28 days of 3000 psi.
All work shall comply with the current edition of the American Concrete Institute' (ACI) building code and the applicable
building codes having jurisdiction in the area.
Bituminous coated corrugated steel pipe (BCCSP) shall be in accordance with Section 943 of the FDOT Specifications.
Reinforced concrete pipe (RCP) shall be in accordance with Section 941 of the FDOT Specifications.
Corrugated polyethylene pipe shall be in accordance with Section 430-11 of the FDOT Specifications.
All drainage pipe joints, including round concrete pipes, shall have a filter fabric jacket in accordance with FDOT Roadway
and Traffic Design Standards.
PULL BOXES
Pull boxes shall meet ANSI 77 Tier 15 rating requirements.
IRRIGATION
Owner shall be responsible for irrigation repair. Contractor shall notify the Engineer and/or Owners Representative if any
irrigation piping is damaged or discovered to allow for proper repairs to occur.
NO:
REVISION:
BY:
DATE:
1
SLC DRC COMMENTS #1
EJJ
01/27/21
EHICLE LOOP INSTALLATION
I vehicle loop detectors shall be installed in accordance with Section 17700 of the FDOT Roadway and Traffic Design
tandards.
AINTENANCE OF TRAFFIC
ontractor shall provide maintenance of Traffic Plan for approval by owner and Martin County prior to commencing
instruction. Maintenance of Traffic (MOT) Plan shall provide continuous two—way traffic flow during all times of the
ay. Intermittent lane closures may be requested but are subject to approval by the owner.
CONSTRUCTION OBSERVATION
The Contractor shall notify the Engineer 48 hours prior to periods of the following construction activities so that the
ngineer can notify the City, County or State to be present for construction observations and shall supply all
quipment necessary to properly observe the completed work.
Erosion Control/ Preserve Barricading
A. Upon completion of silt fence/ preserve barricading but prior to clearing
Drainage
e before backfill
A. Laying of Pipe ( )
B. All drainage structures and pipe laying completed
as and swales
C. Cana#ruction and stabilization of retention are
erosion is evident or where Ions so identify
D. Seeding, mulch; and sodding in. areas where p Y
I. Utilities (U-2 permits or development order)
A. Pipe laying within County or State rights —of —way
B. Jack and boring in County or State rights —of —way
C. Restoration of all rights -of —way
V. Concrete
A. Completion of forming for curbing, sidewalk, and retaining walls before placement of concrete
V. Pavement
A. Line and grade (Certification)
B. Sub—bose (prior to adding base material)
C. Base (prior to priming and sand seal)
D. Base (after priming, sand seal, and before placing asphalt)
E. Asphalt or concrete (while paving is in progress)
F. Turn out construction on to County or State road (above inspections apply)
G. Test results on sub —base
H. Final project observation
PANIC MATERIAL
WEN FABRIC 15 NS70U1ED IN
vNINCH WISH COMPACTED
SPACING Of POSTS ARE
VJERL6HANOORS CAN BE
A A 0 TO REDUCE THE
5- TO S-F. APART
(NOT NEEDED IF -SUCING' i
METHOD IS URGE)
�1
.r
n BI FRENCH
STEEL ON WX
POST NI
`AFTER COAPAC'.H
FAMHC MATERIAL MUST BE
SECUMOLY FASTENED TO THE
'OSTE OFF HE USED) TO THE
12-IN.
�j�i\II
MOOD OR STEEL POSTFNS�PAL.a)
SWORE
MATERIAL
E311�E•1@
T COMPACTED
ISLICING •D
A-`
0BAMLL
ATTACHNGWHEN
TRENCHING IS USED
WE ON. ANT OF ZIL
III%I
!1 �qAT
SAII IN
311--
FADMC MATERIAL MUST SE PLACED IN A O-N.
DRIVE BOTH FORTS
-ACXHWNG AND COAUPACTDIG THE SCAL
•1
NO
nM,eurn nwenc
UNDISTURBED SOIL
IUINA
UNDISTURBI
EXISTING PAVED AREAS
NOTES
1. MINIMUM CONDUIT DEPTHS MAY BE ADJUSTED BASED UPON
FIELD CONDITIONS WHICH MUST BE APPROVED BY FOR AND PSLUSD.
2. RIGID CONDUIT MUST BE USED WHEN JACKING UNDER EXISTING
PAVEMENT AT 3 FT. MINIMUM DEPTH.
CONDUIT LOCATION I
SCALE: N I S
APPROVED: SGM
DRAWN: 1JJ
CHECKED: SGM
DATE: 02/16/2021
FIELD BOOK NO:
ROUNDED CONCRETE OR CAP
6" SCH 40 STEEL PIPE OR DIP FILLED
WITH AND SET IN CONCRETE
TWO COATS OF YELLOW PAINT
SLOPE CONCRETE TO DRAIN-\
EXISTING GRADE'-\
STATE OF FLORITAA EROSION & SEDIMENT CONTROL -DESIGNER & REVIEWER MANUAL.
PLACE TWO OR MORE SETS OF SAND- OF THE CURB. AGS IN A MANNER
THAT RESULTS IN MAXIMUM SUPPORT THE FLOW LINE
BAG MUST BE LOWER .THAN THE T0,
SIDEWALK INLET
I
SEDIMENT LADEN FLOWS
FLOOD FLOWS
DEPOSITION ZONE
SRET
G A E' SPACING
0.51 100
NOTE: FILL SAND BAGS ABOUT 2 3 FULL 11.01 50
2:0 25
BEFORE PLACING 1N THE GUTTER 3.0 16
4.0 13
5.0 10 ®"
CURB AND GUTTER SEDIMENT CONTAINMENT SYSTEM
Figure V•50: Illustration of a Curb and Gutter Sediment Containment System
Penis. "... by NYtlroDynPmfwlncoryPmsa maoPr.^a mP�auwmsae,"I
V -27
- I
r r
f ':a
/ • A
i
i •
0,35 YDB.CONC, MIN, / , �, °. • 4
2,
MIN,_
PAVEMENT
XISTING BASE
\,_UNDISTURBED
SOIL
PULL BOX W/TRAFFK: RATED COVER
PULL BOX RIM PULL 2' MIN. PULL BOX RIM FLUSH
FLUSH WITH G \ � �FWITH SIDEWALK ELEVATION
CONDUIT -� `12" BED OF PEAROCK OR CRUSHED
STONE FOR DRAINAGE
CONDUIT ENTRY INTO PULL BOX
CONDUIT 5' MIN. —PULL BOX
PULL BOX CONDUIT
SIDE STREET
-SIIDEWALK ..
CASING
LCURB & GUTTER B,ADy,M LEDP
a&N
SIDEWALK
CURB 81 GUTTER PULL BOX7
PULL BOX
]STREET SURFACE-7 /-FINISHED GRADE
I—
i
CONDUITS • �CONDUrr
MIN. 4" SCH 40 PVC CASING
1 UNDER PAVEMENT
UNDER SIDEWALK UNDER ROADWAY UNDER NON -TRAFFIC
BEARING SURFACE
.64ADWAY
�ECIL4N
ENT ITV
PULLEDX DETAIL
GENERAL NOTES &
CONSTRUCTION
DETAILS
�N�AA\Il l ltilf/7j�
r; m
U
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY SHAUN G.
MACKENZIE, P.E.ON THE DATE ADIACENTTO THE SEAL
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED
AGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON
ANY ELECTRONIC COPIES.
IMCKENZIE ENGINEMING AND PI MNG, INC.
,l', SW 30 3TRF£T, SANE SOU
PAW M,, R349K
CERTIFICATE OF AUTHORDATFON 39013
SHAUN G. MACKENIIi P.E. NO.61751 Digitally si ned
!5,1h
g
aun G MacKeiizill=
®.)ate: 2021.04. 7
13:47:04 ®04'001
SHAUN MACKENZIE, P.E.
FLORIDA LICENSE NO. 61751
KNOW WHAT'S BELOW
ALWAYS CALL 811
e HEYORE YOU DIG
WS last. Ks tree. It's oe law.
° ,Mv.caIlsunshine.com
SHEET: C-2
OF: C-7
MACKENZIE ENGINEERING PROJECT NO.
206-001
ST. LUCIE COUNTY PROJECT NO.:
SPMIIJ-12202025902
Line ikiniaL111
N
r�
LIMITS OF -
\ CONSTRUCTION
0
EXCAVATE AND REMOVE
EXISTING GRASS AREA
(4 SY)
SOUTH ENT
KNOW WHAT'S BFL01'F'
ALWAYS CALL 811
BEFORE YOU D16
® its fast. Rs hoe. its 7,e law.
mo.vxal l s u ns h ine. com
4acKenzie
Engineering & Planning, Inc.
m
LIMITS OF
CONSTRUCTIOI
MACKENZIE ENGINEERING
& PLANNING, INC.
1172 SW 30TH STREET,
SUITE 500,
PALM CITY, FL, 34990
772-286-8030
CA29013
00
-
INSTALL 1 GUMBO
LIMBO TREE
=MOVE EXISTING ASPHALT PARKING
VD INSTALL 55 SY OF PERVIOUS AREA
MATCH EXISTING GRASS
NO:
REVISION:
BY:
DATE:
1
SLC DRC COMMENTS #1
EJJ
01/27/21
iW
a
,.. is�, CoNoC #1dlUm
z k ��
.4` my a 9' �°- _'`s� a ••,�` w 3. a „�. �? kax•
SAWCUT AND REMOVE ¢
4' X 1 '-4" OF ASPHALT Y a
LIMITS OF CONSTRUCTION
4y
All I
n
r Ekncw
s Y�li
l
k
c .-
iiT i
t�r�
Y
�fi fM+k�rxr e 3� 'Y SK�A•
ry }`�
gp
10 v g
CONSTRUCTION
TH110
S DINGS
ST. LUCIE COUNTFwlRIDF
SCALE: NTS
APPROVED: SGM
DRAWN: EJJ
CHECKED: c3GM
DATE: 02/16/2021
F 1 IELD BOOK NO:
SCALE 1" = 20'
ISSUED FOR
CONSTRUCTION
0 10, 20' 40.
* I Y SCALE 1" = 20'
A
�a
k
Digitally
`�� �� \A\111fi9fJ11�
k
G. lac
signedY
i�11 No. 617
Shaun G
i
�;. P :•9!
S - MacKenzie
A���' Date:
ll U i 111 A1��
THISITEM HASSEEN DIGITALLY SIGNED AND SEALED BYSHAUNG. ^ A■ 7
MACKENZIE,
COPIEE. ON THE DATE
OCUME TARECENT TOT CONSIDERED
/ OL � •04.0 /
L i PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED L
SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON
` $ ANY ELECTRONIC COPIES. 7 17
MACKENZIE ENGINEERING AND PLANNING, INC. •4 / • ■
MAC EN 30TM STREET, SUITED • •
y'W PALM CITY, FL 34990
} b CERTIFICATE F SHAUN G. MACKENZIE, PEE.NO. 617TION 3 51
` •I
' 04'00'
,R
SHAUN MACKENZIE, P.E.
FLORIDA LICENSE NO. 61751
IEMOLITION, EROSION
CONTROL AND
LANDSCAPING PLAN
SHEET: C-3
OF: C-7
MACKENZIE ENGINEERING PROJECT NO.
206-001
ST. LUCIE COUNTY PROJECT NO.:
SPMN-12202025902
\ RECOMPACT EXISTING ROCK,
\ INSTALL 1.5" TYPE SP-9.5 ASPHALT CONCRETE
\ TO MATCH EXISTING GRADE FOR GUEST
TURNAROUND AREA (57 SY)
Ib
X "00 X eIV \ \ CONSTRUCT
1� NON -MOUNTABLE
TYPE D CURB
LIMITS OF (25 LF)
IT
CONSTRUCTION OX--
p,0 xp ) X9• .y9
0
® k1 9
x K11 y� "X "' "e
® e ' Xy X5
X "•
ti
X" R1.60' x
_ Xy
x"6° — 10) xD
X
1
7
E TING EDGE
\ O A VEMENT
CONSTRUCT NON —MOUNTABLE
TYPE "D" CURB WITH 1' CONCRETE
INAGE SPACING ON EACH CORNER
(64 LF)
Xtf
• ti �0
L./
ry
X "ry
X "•
\ LIMITS OF JJ
acKenzie
Engineering & Planning, Inc.
N
,
\
\
MACKENZIE ENGINEERING
& PLANNING, INC.
1172 SW 30TH STREET,
SUITE 500,
PALM CITY, FL, 34990
772-286-8030
CA29013
bryOX
4D:y
xy'
9
Xyry
CONSTRUCT
NEW PAVEMENT
(23 SY)
ISSUED FOR CONSTRUCTION
LEGEND
DRAINAGE FLOW
O BOLLARDS
® CALL BOX
- t "rya
CONSTRUCT GUEST/RESIDENT SIGN
CONCRETE 4 .
CONSTRUCT
MEDIAN CURB NON —MOUNTABLE ;
ELECTRICAL OUTLETS
(4'X 1 '4TYPE D CURB
' 0 10, 20, 40' X EXISTING ELEVATION (XX.XX) (NAD83)
(15 LF) r
�f b
1 I
20
n T I+� �y
CONSTRUCTION DETAIL
Xh",y
1P 1 LIMITS OF CONSTRUCTION x
X X 1PROPOSED
5 7 rtx 8„
°b NEW EDGE``az>4 TYPE D TYPE D 61 PAVEMENT
` ,.. s; 1"?3r
Xy i Pt
OF PAVEMENT��
�, O..
00
� �.k 1't".i (O CID
Xbo9 0000,0000
� .. 00
R 2 �' "n BASE Do 2„R
5' x� R,L
00
C RUCT NON —MOUNTABLE h
R 4 TYPE "D"CURB WITH 1' CONCRETE �x �xk " 1` VARIES --�
11
\ DRAINAGE SPACING 5' O.C. '> 1' CONCRETE DRAINAGE TYPE D
(106 LF)(SEE DETAIL) a Hxx ��.�.,,� SPACING DETAIL CURB NDETAIL
TS
KITS
CONSTRUCT NON—MOUNTABL
TYPE D CURB WITH
1' CONCRETE DRAINAGE
SPACING 5' O.C. (SEE DETAIL)
(72 LF)
NO:
F REVISION:
BY:
DATE:
1
SLC DRC COMMENTS #1
EJJ
01/27/21
�VIVV 1 IX%Jl/ 1 IVIV VI\l-%VVIIVV%
AILAv ill H E EA R BV 1 I N ,
T I I ICI �nI IAI V I�r1 In
SCALE: NTS
APPROVED:SGM
DRAWN: EJJ
CHECKED:SGM
DATE: 02/16/2021
FIELD BOOK NO:
0 10, 20' 40'
SCALE 1 " = 20'
r. WE
ASPHALT' ��Vry� ASPHALT
mmmmm Fm
BASE °1O g" g" BASE
I
--VARIES -�
SUBGRADE
MEDIAN CURBING
DETAIL
NTS
SAW CUT
NEW PAVEMENT
I. EXISTING PAVEMENT
NEW BASE
EXISTING BASE
SAW
CUT DETAIL
MATCHEXISTING VARIES 1.5"TYPE SP-9.5
ASPHALT SURFACE ASPHALTIC CONCRETE
8" OPTIONAL 2% MATCH EXISTING
BASEGROUPB ASPHALTSURFACE
12" COMPACTED OR
STABILIZED SUBGRADE
(LBR 40)
NEW PAVEMENT
TYPICAL SECTION
DETAIL
NTS
KNOW WHAT'S BF.LOI','
ALWAYS CALL 811
t • B1 }ORFC YOU DIG
® WE'.'61. It's tree. IYs-Fe b-h.
v ,. wxallsunshhe.com
PAVING, GRADING
AND DRAINAGE PLAN
\\\\NAAG11 IMI is //�
\•`zEN3Lc••..• �,�✓.ram
. CO ..
No. 617 1
� • so F .�
!moo'• a
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY SHAUN G
MACKENZIE, P.E. ON THE DATE ADJACENT 0 THE SEAL.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED
SIGNED AND SEALED AND THE SIGNATURE MUST RE VERIFIED ON
ANY ELECTRONIC COPIES,
MACKENZIE ENGINEERING AND PLANNING, INC.
1192 SW 30" STREET, SUITE 500
PALM "I , FL34990
CERTIFIC TE OF AUTHORIZATION 29013
SHAUN G. MACKENZIE, PE. NO. 61751
NTS
Digitally
signed by
Shaun G
MacKenzie
Date:
2021.04.07
13:47:33
-04'00'
SHAUN MACKENZIE, P.E.
FLORIDA LICENSE NO. 61751
SHEET: C-4
OF: C-7
MACKENZIE ENGINEERING PROJE
206-001
ST. LUCIE COUNTY PROJECT NO.:
SPMN-12202025902
I I IIT n 1-
LEGEND
DRAINAGE FLOW
O BOLLARDS
K2 CALL BOX
GUEST/RESIDENT SIGN
ELECTRICAL OUTLETS
4acKenzie
Engineering & Planning, Inc.
as 119;611 gam"Llul
CONSTRUCTION NOTES:
1. ELECTRICAL POWER SOURCE IS NOT IDENTIFIED AND WILL BE SUBMITTED UNDER A SEPARATE PERMIT.
MACKENZIE ENGINEERING
& PLANNING, INC.
1172 SW 30TH STREET,
SUITE 500,
PALM CITY, FL, 34990
772-286-8030
CA29013
ISSUED FOR CONSTRUCTION
NO:
REVISION:
BY:
DATE:
1
SLC DRC COMMENTS #1
EJJ
01/27/21
CONSTRUCTION DRAWINGS
ATLANT111 BTHE SE� C�OU�RL FLORIDA
A
SCALE: 1:10
APPROVED: SGM
DRAWN: EJJ
CHECKED: SGM
DATE: 02/16/2021
FIELD BOOK NO:
KNOW WHAT'S BELOW
ALWAYS CALL 811
• t3EFORF. YOU DI(i
IYs'asc. It's free It; vle U*,
w.callsunshine.com
NORTH ENTRANCE
PROP. ENTRY GATE
SHEET: C-5
OF: C-7
206-001
LEE —
A __ _SCALE 111 = 10'
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY SHAUN G
MACKENZIE, P.E. ON THE DATE ADJACENT TO THE SEAL
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED
SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON
ANY ELECTRONIC COPIES.
MA"ENZIE ENGINEERING AND PLANNING, INC
1172 SW 3V STREET, SUITE SW
PALM CITY, FL 34990
CERTIFICATE OF AUTHORILITION 29013
SHAUN G. MMKENZIE, P.E. NO. 617SI
Digitally
signed by
Shaun G
MacKenzie
Date:
2021,04,07
13:47:47
-04'00'
SHAUN MACKENZIE, P.E.
FLORIDA LICENSE NO. 61751
ST. LUCIE COUNTY PROJECT NO.:
SPMN-12202025902
NO.
EXI ST XNG
PULL BOAC
l �
rogue,
EXISTING ASPHALT
TO REMAIN
LIMITS OF
x CONSTRUCTION
LEGEND
0
LIMIT ^�
CONS 7 RUC]
INSTALL 2" SCHEDULE 40 PVC TO EXISTING PULL BOX
(1)LOW VOLTAGE;
(1)HIGH VOLTAGE;
(1)SPARE W/PULL STRING;
(158 LF)
- EXIT LANE
� DRAINAGE FLOW
O BOLLARDS
❑ CALL BOX
-u GUEST/RESIDENT SIGN
0 ELECTRICAL OUTLETS
4acKenzie
Engineering & Planning, Inc.
ENTRY LANE
75'
F
ROPOSRESIDENT
ONLY IVTRY SIGN
"RESIDENTS ONLY
HERS USA NORTH
GATES FOR NTRY"
INSTALL VEHICLE
LOOP DETECTOR
(ENTRY & EXIT LANE)
IF
L
INSTALL QUICK ARM €RT1`
GATE ARM OPERA 1 A�
ON CONCRETE PAD (PA ` SI
GATE CONTRACTOR)
PROVIDED BY
IMITS OF
CONSTRUCTION
INSTALL PULL BOX
CONSTRUCTION NOTES:
1. ELECTRICAL POWER SOURCE IS NOT IDENTIFIED AND WILL BE SUBMITTED UNDER A SEPARATE PERMIT.
MACKENZIE ENGINEERING
& PLANNING, INC.
1172 SW 30TH STREET,
SUITE 500,
PALM CITY, FL, 34990
772-286-8030
CA29013
ISSUED FOR CONSTRUCTION
NO:
REVISION:
BY:
DATE:
1
SLC DRC COMMENTS #1
EJJ
01/27/2.1
CONSTRUCTION DRAWINGS
ATLRNT�III B�THE S�D00�1;1ST. LUCI C UN Y, IDA
SCALE: NTS
APPROVED: SGM
DRAWN: EJJ
CHECKED: SGM
DATE: 02/16/2021
FIELD BOOK NO:
10 L
SCALE '
INSTALL THREE 2" SCHEDULE 40 PVC
(1)LOW VOLTAGE,
(1)HIGH VOLTAGE;
(1)SPARE W/ 12 GAUGE COPPER WIRE FOR PULL;
(32 LF)
INSTALL QUICK ARM VERTICAL
GATE ARM OPERATOR (1 AS) ON CONCRETE PAD
(PAD SIZING PROVIDED BY GATE CONTRACTOR)
CONSTRUCT VEHICLE CARD READER ON 24'X24'X28"
CONCRETE PAD, KNOX BOX AND INSTALL TRAFFIC RATED PULL BOX AND TWO
2" SCHEDULE 40 PVC CONDUIT
(1)LOW VOLTAGE
(2)SPARE WITH 12 GAUGE COPPER WIRE FOR PULL
(27LF) Digitally
signed by
No.617 1 \.•* - Shaun G
S A7E F
��C->\ ;
MacKenzie
Date:
THIS REM HAS BEEN DIGITALLY SIGNED AND SEALED BY SHAUN G
MACKENZE, RE. ON THE DATE ADJACENT TO
THE SEAL
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED 210 • • • /7
SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON
ANY ELECTRONIC COPIES. R
1MAC K172SW 30rf STREET,
RSUITE5 PLANNING, INC 13.48:00
PAL SCIY, FL STREET, SUITE 500 �/
PALM CITY, FL F34990
CE AUT
SHAUN
"INDITE C AUTHORE. N ON29013
2MI
SHAUN G. MACKENZIE, P.f. NO, G333 ' '
KNOW WHAT'S AFL011' -04 OO
ALWAYS CALL 811
• BFFORI--'Y(.)LI DIG
IfG+aGL.IPs free. lYG TDB u,N. SHAUN MACKENZIE, P.E.
.:row.v.caIIsunshin•.com FLORIDA LICENSE NO. 61751
SOUTH ENTRANCE
PROP. ENTRY GATE
SHEET: C-6
OF: C-7
MACKENZIE ENGINEERING PROJECT NO.
206-001
ST. LUCIE COUNTY PROJECT NO.:
SPMN-12202025902
SINGLE UNIT TRUCK PROFILE
VEHICLE PROFILE
IN U I I U Z) U/I
4acKenzie
Engineering & Planning, Inc.
MACKENZIE ENGINEERING
& PLANNING, INC.
1172 SW 30TH STREET,
SUITE 500,
PALM CITY, FL, 34990
772-286-8030
CA29013
NCE = GUEST AND RESIDENT ENTR . Y
'A . I ^ 1m
NO:
REVISION:
BY:
DATE:
1
JSLC DRC COMMENTS #1
EJJ
01/27/21
vw% 000 44k I pw& pm 1k, I mom
CONSTRUCTION DRAWINGS
ST. RT�A�j�I�B����C�A��S1IDA
SCALE: NTS
APPROVED: SGM
DRAWN: EJJ
CHECKED:SGM
DATE: 02/16/201
FIELD BOOK NO:
CIRCULATION PLAN
0 10, 20' 40'
SCALE 1" = 20'
ISSUED FOR
CONSTRUCTION
0 10, 20' 40'
SCALE 1" = 20'
Digitally
G11Miac,✓ signed by
No.6171*= Shaun G
S �= MacKenzie
1111110 Date:
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY SHAUN G.
MACKENZIE,P.E. ON THE DATEADJACENT
RE TOTHE SEAL. 11O11 1 .04.07
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED 1 1
SIGNED AND SEALED AND THE 51GNATU RE MUST BE VERIFIED ON
ANY ELECTRONIC COPIES.
MACKENZIE ENGINEERING AND PLANNING, INC.
IT7
STREET
CERTIFICATE
3IC 3DE FAUTH. RAZE ION 1 3:48:2 7
00
PALM CH$ FL 36990
CERTIFICATE OF AUTHORIZATION 19013
SHAUN G. MACKEN2I E, P.E. N0.6ll51
-04' 00'
SHAUN MACKENZIE, P.E.
FLORIDA LICENSE NO. 61751
SHEET: C-7
OF: C-7
MACKENZIE ENGINEERING PROJECT NO.
206-001
ST. LUCIE COUNTY PROJECT NO.:
SPMN-12202025902