HomeMy WebLinkAboutCreekside lot 11 temp toil.pdfU PV L, V L-1` Ll U L'
ENGINEEftIKG SCIENCES
INSPECTION RESULTS v' l /`
Inspection Date: _ nO — I �� —') / Permit No.
Project: C,) 10 X z
Address: / y D �
Check one:
XRegular inspection:
ED Reinspection Date of Initial Inspection: F— / 3
Inspection Type Requested (check):
Slab
Rock
Final
ELECTRICAL
Floor
Wall I
Final
Protection
... 1" ...
Stack Piping & Test
bteam Piping R. Te
HW Piping & Test
Water Piping & Test
CHW Piping P. 7est
Gas Piping & Test
Cond. Piping & Test
Storm Piping & Test
Insulation
Fixtures
Wall & Ceiling
Equipment
Equipment
Re -inspection
Re -inspection
Final Plumbing
IFinal Mechanical
Other Inspection Type:
Area Inspected/Code: D7 `
Inspection Results:* AP -Approved ❑ AE-Approved with Exceptions
❑ DP -Disapproved I] Not Ready
Conditions/Comments
1.
2.
3.
4.
5.
6.
7.
Inspectors Name: Lk.#: g
❑ DA-Disallowed
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924.3580 (fax)
www.teamgfa.com