Loading...
HomeMy WebLinkAboutCreekside lot 11 temp toil.pdfU PV L, V L-1` Ll U L' ENGINEEftIKG SCIENCES INSPECTION RESULTS v' l /` Inspection Date: _ nO — I �� —') / Permit No. Project: C,) 10 X z Address: / y D � Check one: XRegular inspection: ED Reinspection Date of Initial Inspection: F— / 3 Inspection Type Requested (check): Slab Rock Final ELECTRICAL Floor Wall I Final Protection ... 1" ... Stack Piping & Test bteam Piping R. Te HW Piping & Test Water Piping & Test CHW Piping P. 7est Gas Piping & Test Cond. Piping & Test Storm Piping & Test Insulation Fixtures Wall & Ceiling Equipment Equipment Re -inspection Re -inspection Final Plumbing IFinal Mechanical Other Inspection Type: Area Inspected/Code: D7 ` Inspection Results:* AP -Approved ❑ AE-Approved with Exceptions ❑ DP -Disapproved I] Not Ready Conditions/Comments 1. 2. 3. 4. 5. 6. 7. Inspectors Name: Lk.#: g ❑ DA-Disallowed OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924.3580 (fax) www.teamgfa.com