Loading...
HomeMy WebLinkAboutCreekside Lot 18 temp toilet.pdfENQSINEERWO SCIENCES INSPECTION RESULTS Inspection Date: (� 4 - 3 -a Permil No. � I O —eve y Project: Address: Check one: XRegular Inspection: ❑ Reinspection Date of Initial Inspection: p — 1 J — dI Inspection Type Requested (check): avIwrnu7nruucrUnAc tLtITRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough In Slab Fioor Rough -In Rough -in Steam Piping & Te Masonry Wall Rough -in Stack Piping &Test HW Piping &Test Wall/Ceiling Ceiling Rou h-In Water Piping &Test CHW piping & Test Framing Panel/Feeder Gas Piping &Test Cond. Piping & 7es Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall &Ceiling Roofing Lighting Protection Eauipment Final Building Final Electrical Final Plumbing c YIIILtlI Other Inspection Type: Q Area Inspected/Code: q a % Inspection Results: $1 AP -Approved 0 AE-Approved with Exceptions 0 DA-Disallowed ❑ DP -Disapproved D Not Ready Conditions/Comments: 1. Z. 3. 5. 6. 7. Inspectors Name: mot-- Lic.#: A&I 7 7�5 OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) WWW.teamRfa.com