Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Creekside Lot 18 temp toilet.pdf
ENQSINEERWO SCIENCES INSPECTION RESULTS Inspection Date: (� 4 - 3 -a Permil No. � I O —eve y Project: Address: Check one: XRegular Inspection: ❑ Reinspection Date of Initial Inspection: p — 1 J — dI Inspection Type Requested (check): avIwrnu7nruucrUnAc tLtITRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough In Slab Fioor Rough -In Rough -in Steam Piping & Te Masonry Wall Rough -in Stack Piping &Test HW Piping &Test Wall/Ceiling Ceiling Rou h-In Water Piping &Test CHW piping & Test Framing Panel/Feeder Gas Piping &Test Cond. Piping & 7es Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall &Ceiling Roofing Lighting Protection Eauipment Final Building Final Electrical Final Plumbing c YIIILtlI Other Inspection Type: Q Area Inspected/Code: q a % Inspection Results: $1 AP -Approved 0 AE-Approved with Exceptions 0 DA-Disallowed ❑ DP -Disapproved D Not Ready Conditions/Comments: 1. Z. 3. 5. 6. 7. Inspectors Name: mot-- Lic.#: A&I 7 7�5 OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) WWW.teamRfa.com