HomeMy WebLinkAboutInstallation Instructions; Model 1101 V Series All Steel Foundation Systemw.vwr.olivertechnologies.com s
OLIVER TECHNOLOGIES, INC.
INSTALLATION INSTRUCTIONS FOR FLORIDA
MODEL 11A1 "V" SERIES ALL STEEL FOUNDATION SYSTEM PAN &CONCRETE (revision 5/18)
PATENT# 6634150 & OTHER PATENT PENDING
REVISE
By SEA�JS�YQNG�ti at 6;32 am; Bt3T/9B`
�4
♦sa'"9 [ t : 6"
i 6
fir
`v' 'sp •o••pa� lit, d�
4
o. 0242 e
STATE OF � �•
< ORI� •
•0 4
♦• y� 4s
S'4&�i91 �t9996 .
Aug 24, 2016
4. Choose one ofthe approved longitudinal tube installations; either
diagram for appropriate pier height at support location or cut and
PIER HEIGHT 1.25" 1.50"
(40' Min. - 45" Max,) Tube Length Tube Length
7 3/4" to 25"
22"
24'3/4!'to32I14"
32".
�5
33" to 41 "
44'
.40" to 48"
54"
Swan Ave • Hohenwald, TN 38462 s (80) 284-7437
www.ollvertechnoIogies.com
Fax (931)
OLIVER TECHNOLOGIES, INC.
FLORIDA INSTALLATION INSTRUCTIONS -FOR THE
MODEL 1-101 "V" SERVES ALL STEEL FOUNDATION SYSTEM
MODEL 1101"V" (Steps 1-14).
LONGITUDINAL ONLY: follow Steps 1-9
LATERAL ONLY: Follow Steps 1-3 and Steps 10-14
ENGINEERS STAMP FOR CONCRETE APPLICATIONS: Follow Steps 15-18 ENGINEERS STAMP
SPECIAL CIRCUMSTANCES: if the following conditions occur - STOP! Contact Oliver Technologies at 1-800-284-7437.
a) Pier height exceeds 48" c) Roof eaves.exceed 16" e) Location is within 1500 feet of coast
b) length of home exceeds 76' d) Sidewall height exceed 96"
INSTALLATION OF GROUND PAN
2. Remove weeds and debris in an approximate two foot square to expose firm soil for each ground pan
3. Place ground pan (C) directly below chassis I-beam. Press or drive pan firmly into soil until flush or below soil.then install pier per
manufacturers instructions or per Florida Regs.
SPECIAL NOTE: The longitudinal."W brace system may also serve as,a pier under the home andihould be loaded as any other pier,
It is recommended that after leveling piers, and one-third inch (1/3") before home is lowered completely on to piers, complete
steps 4 through 9 below then remove jacks. � 2;:,
INSTALLATION OF LONGITUDINAL "V" BRACE SYSTEM (ModA 1101 L "V")
NOTE: WHEN INSTALLING THE LONGITUDINAL SYSTEM ONLY, A MINIMUM OF 2
USED TO DETERMINE CORRECTTYPE OF ANCHOR PER SOIL CLASSIFICATION. IF PROBETEST
BE USED. IF PROBETEST READINGS ARE BETWEEN 276 & 350 A 4 FOOT ANCHOR MAYBE
STABILIZER PLATES EVERY 5'4" . VERTICALTIES ARE ALSO REQUIRED ON HOMES SUFRLIED-1
or B. Then select the correct square tube (E) length from the
CTI6N IS REQUIRED. SOILTEST PROBE SHOULD BE
ARE BETWEEN 175 & 275 A 5 FOOT ANCHOR MUST
GROUND ANCHORS WITH DIAGONAL TIES AND
: ALTIE CONNECTION POINTS (PER FLORIDA REG.).
irill 1 °5" square tube to achieve: appropriate length.
PIER HEIGHT 1,50"
9/16 Dia (So2"1 holey (40° Min. - 60° Max.) Tube Length
Part E
Diagram A z. `' 0.7s�
Diagram B
5. Install (2) of the 1.50" square tubes (f) into the' "bracket (1), insert carriage bolt and leave nut loose for final adjustment.
6. Place 1-beam connector (F) loosely,on the. bottom flange of the I-beam.
7. (.For Diagram A installation) Slide the selected 1.25" tube (E) into a 1.50" tube (E) and attach to I-beam connectors (F) and fasten loosely
with bolt and nut. (For Diagram B installation) Attach the selected 1.5"tubes (E) to the I-beam connectors (F) and fasten loosely with bolts
r
14" to 18"
2W
18" to 25"
28"
24" to 35"
39"
30" to 40"
44"
arid nuts.
8_ Repeat steps 6 through 7 to create the "V" pattern of the square tubes loosely in place.
9. Using standard hand"tools tighten all nuts and bolts. (For Diagram A installation only, secure 1,25" and 1 ,50" tubes using
four(4) 1 /4"-14 x 3/4" self -tapping screws in pre -drilled holes.)
INSTALLATION OF LATERAL TELESCOPING TRANSVERSE ARM SYSTEM (Model 1101• T "V")
THE MODEL 1101 "V" (LONGITUDINAL& LATERAL PROTECTION) ELIMINATES THE NEED FOR STABILIZER PLATES& FRAMETIES.
NOTE: THE USE OF THIS. SYSTEM REQUIRES VERTICALTIES SPACED AT 547.
FOUR FOOT (4') GROUND ANCHOR MAY BE USED EXCEPT WHERE THE HOME MANUFACTURER SPECIFIES DIFFERENT,
10. Install remaining Vertical tie -down straps and 4' ground anchors per home manufacturer's instructions. NOTE: Centerline anchors
to be sized according to soil torque condition. Any manufacturer's specifications for sidewall anchor loads in excess of 4,000 lbs.
require a T anchor per Florida Code.
11. Selectthe correct square tube brace (H) length for set-up lateral' transverse at support Iocafon.The lengths come in either 60" or
72" lengths. (With the 1.50" tube as the bottom tube, and the 1.25" tube as the inserted tube.)
12. Install the 1.50 transverse brace (H) to the ground pan connector (D) with bolt and nut.
13. Slide 1.25" transverse brace into the 1.50" brace and attach to adjacent I-beam connector (1) with bolt and nut.
14, Secure 1,5W transverse arm to 1.25" transverse arm using four (4)1 /4' -14 x 3/4" self -tapping screws in pre -drilled holes. Page'
PATFNTa Ah3di r%n A r1THFR PATFNT PFNrnINr; Revision 08/23/1 E
19
467 Swan Ave * Hohenwald, TN 38462 s (800) 284-7437 4 www.olivertechnologies.com • Fax (931) 796-8811
INSTALLATION USING CONCRETE RUNNER/ FOOTER
15. A concrete runner, footer or slab may be used. in place of the steel ground pan.
a) The concrete shall be minimum 2500 psi mix
b) A concrete runner may be either longitudinal or transverse, and must be a minimum of 8" deep with a minimum width of 16 inches
longitudinally or 18 inches transverse to allow proper distance between the concrete bolt and the edge of the concrete (see below).
c) Footers must.have minimum surface area of 441 sq. in. (I.e. 2.1" square), and must be a minimum of 8" deep.
d) If a full slab is used, the depth must be a 4" minimum, Special inspection of the system bracket installation is not required. Footers
must allow for at least 4" from the concrete bolt to the edge of the concrete.
NOTE: The bottom of all footings, pads, slabs and runners must be -per local jurisdiction.
LONGITUDINAL: (Model 1101 LC"V")
16. When using Part# 1101-W-CPCA (wetset) simply install the bracket in runner/footer OR When installing in cured concrete use Part#
101-D-CPCA (dryset). The 1101 (dryset) CA bracket is attached to the concrete using (2) 5/8"x3" concrete wedge bolts (Simpson part #
5162300H 5/8" X 3" or Powers equivalent). Place the CA bracket in desired location. Mark bolt hole±locations, then using a 5/8" diameter
masonry bit, drill a hole to a minimum depth of 3". Make sure all dust and concrete is.blown put of:!t to holes. Place wedge bolts into drille
holes, then place 1101 (dry set) CA bracket onto wedge bolts and start wedge bolt nuts. Take a hammer and lightly drive the wedge bolts
down by hitting the nut (making sure not to hit the top of threads on bolt). The sleeve of concrete wedge bolt needs to beat or below thf
ton of concrete. Complete by tightening nuts.
17. For wet set (part # I I01-W TACA) installation simply install the anchor bolt into runner/faoter, For dry set installation (part # 1101-D TACA
mark bolt hole locations, then using a 5/8" diam. masonry bit, drill a hole to a minimum depth of 3 Make sure all dust and concrete is
blown out of the hole. Place wedge bolts (Simpson part #5162300H 5/8" X 3" or Powers:equivalent)into (D) concrete dry transverse
connector and into drilled hole. If needed; take a hammer and lightly,dnie.the wedge`bolts down by hitting the. nut.(making sure not to
hit the top of threads on bolt). then remove the nut. The sleeve of concrete wedge bolt needs to be at or below the top of concrete.
18. When using part#t 1101 CVW (wetset) or 1101 CVD (dryset), install ,per steps; i 7& 18.
Notes:.
1. LENGTH OF HOUSE IS THE VICTUAL BOX SIZE
2. F-� = LOCATION OF TRANSVERSE.'BRA4ING ONLY
3 = LOCATION OF LONGITUDINAL SRACING ONLY
4., =TRANSVERSE AI(IDLONGITUDINALLOCATIONS
AND LENGTHS UPTO52'
ALL WIDTHS AND LENGTHS OVER 52`TO 80"
1
i
I
HOMES WITH 5/12 ROOF PITCH REQUIRE: PER FLORIDA REGULATIONS
6 systems, for home lengths up to 52' and 8 systems for homes over 52' and up: 80'.
PATENT# 6634150 & OTHER PATENT PENDING Paae i
Revision 09/23/1E
.90
I -Transverse Arm,I-Seam Connector
D - Pan Ttansverse
H -Transverse Arm
/ Top (1.25')
Bottom V 5 1
C - Ground Pan
I -Transverse Arm.l-Beam Connector
l Cto ck
Omitted
Omitted t
1
i jar Clarity
D - Concrete
Connector
•�_''��
-Concrete SI
F oofer
Part C 1101- D - TACA
H-Transverse Aim Part #li01-W-TACAnot shown
Top (1.25 )
Bottom (1 S")
I CMU-Pier
Omitted I
LFor clarity I J
Bolts
Model # 1101 T "W - Model # 1101 TIC "V"
Florida approved 4' ground anchors may be used in all locations except where home manufacturers specifications for sidewall
straps are in excess of 4,000 lbs. These iocations require a 5' anchor. Per Florida code. ,
C = GROUND PAN / CONCRETE FOOTER OR RUNNER
D = GROUND PAN / CONCRETE U BRACKETS TRANSVERSE CONNECTOR (connects with grade 5 1/2Rx=2" 1/2" carriage bolt and nut)
E = TELESCOPING V BRACE TUBE ASSEMBLY (1.5" TUBE BOTTOM AND 1.25" TUBE INSERT) OR 1'S" TUBE
F ="V"BRACE I -BEAM CONNECTOR ASSEMBLY
H = TELESCOPING TRANSVERSE ARM ASSEMBLY
I = TRANSVERSE ARM i-BEAM CONNECTOR (connects with grade 5 -1 /2" x 2" J /2" carriage bolt and nut)
"
1= V PAN. BRACKET (connects with grade 5 -1/2"x 2" 1/2" carriage bolt'and n at)
I -Transverse Arm, I -Beam
D Pan Transverse Connector
Concrete Transverse Bracket
"V" Brace Tube (1.5")
Model ## 1101 "V"
PATENT+# 6634150 & OTHER'PATENT PENDING
?ante 1101 D.CPCA.
Part J 1101 V)-CPCA not shown
Model # 1101 C "V"
P__ aelq
Revislon.003/1 E