Loading...
HomeMy WebLinkAboutTrussLayout Approval Approved By Approval Date RECEIVED NOV I & 2020 Permitting Department St. Lucie County Requested Delivery Date System 42 Floor Truss Specifications. Truss Depth: 24" Spacing: 24" O.C. Bearing Width: 811 Total Loading: 55# TC Live Load: 40# TC Dead Load: 10# BC Live Load: 0# BC Dead Load: 10# Duration Factor: 1.00 Truss Specifications Top Chord Pitch: 6/12 Bottom Chord Pitch: 0/12 Top Chord Size: 2 x 4 Bottom Chord Size: 2 x 4 Cantilever: 0't Overhang Cut: Plumb Bearing Width: Varies Spacing: 24" O.C. Total Loading: 37# TC Live Load: 20# TC Dead Load: 7# BC Live Load: 0# BC Dead Load: 10# Duration Factor: 1.25 Wind Specifications Wind Design: ASCE 7-10 Wind Speed: 150 MPH Building Category: II Building Exposure D Building Design: Customer: Builder Job 12299 N.E. CENTER CIR JENSEN BEACH Location: I FLORIDA 34957 Job # 0133A Date: 11 /2/2020 L� P R 0. 0 C T S E R V I C E S ScaleTampa's Premier Truss Company 2714 North 35th Street Tampa, Florida 336o5-3122 N.T.S. x: 8L3-$-2221 Fax: 8t3-248-543t E-Mail: pedrojimenez@verizon.net Job Truss russ Type 0133A A Piggyback Base 4771 WPS, Tampa,Fl, Pedro Jimenez Run: 8.130 s Nov 13 2017 Print 9A-0 _ _ .. ID:bOydnXKyuk5YJ6RXt Scale=1:86.5 3x5 = _ 6.00 12 5x7 — - - 3x5 = 3x6 = 5x7 = 2 3 27 4 5 T, 28 29 6 4x5 3x5 1 5 7 5 4 4 4x5 8 3x6 17 9 2x4 i 18 Sx6 = 16 10 19 5x5 3X5 :Z 15 14 c5 Lh 3x5 3x6 0 3.00 12 3x5 13 0 11 HW2 1 C? IT Io 0 21 2p 3x6 C 3x4 12 4x5 = 5x7 = 4x10 II 94.0 0.4-0 9.481.2-0 i 6.7-11 , 11-8.5 , 16.9.0 21.9-11 26-10.5 32-3.3 37-&0 4443 44. 0.0 ' 6-7-11 5-0.11 5-0.11 5.0.11 5.0-11 5-0-13 5-0.13 7-0-4 0. 12 Plate Offsets (X,Y)-- [2:0-5-4,0-2-81 [6:0-5-4.0-2-81 [11:0-0-0 1-2-3],[11:0-0-12,Edgel [12:0-5-4.0-2-121 [18:0-2-8 0-3-01 14-0 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.72 Vert(LL) -0.16 17 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 REC IVEr)BC; 0.54 Vert(CT) -0.30 16-17 >999 240 BCLL 0.0 Rep Stress Incr YES WB 0.73 Horz(CT) -0.23 21 n/a n/a BCDL 10.0 Code FBC2017/TP12014 Matrix -MS Wind(LL) 0.15 17 >999 240 Weight: 281 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 Permitting Department TOP CHORD Structural wood sheathing directly applied or 3-4-8 oc purlins, except BOT CHORD 2x4 SP No.2 StLucie Count end verticals. , WEBS 2x4 SP No.3 y BOT CHORD Rigid ceiling directly applied or 6-0-0 cc bracing. WEDGE WEBS 1 Row at midpt 1-21 Right: 2x8 SP No.2 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation auide. REACTIONS. (lb/size) 12=225710-8-0 (min. 0-2-11), 11=-142/0-3-8 (min. 0-1-8), 21=1290/0-3-8 (min. 0-1-8) Max Horz 12=-390(LC 6) Max Upliftl 2=-581 (LC 8), 11=-247(LC 17), 21=-321(l-C 8) Max Grav12=2257(LC 1), 11=153(LC 4), 21=1290(LC 1) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. _ TOP CHORD 1-2=-1213/345, 2-27=-1740/487. 3-27=-1740/487, 3-4=-2489/597, 4-5=-2489/597, 5-28=-1843/513, 28-29=-1843/513, 6-29=-18431513, 6-7=-1392/407, 7.8=-749/221, r 8-9=-302/958, 9-10=-315/871, 10-11=-245/638„20-21=-1290/321, 1-20=-1233/331 BOT CHORD 18-19=-295/1044, 17-18=-588/2099, 16-17=-612/2181, 15-16=-350/1224, 14-15=-363/1203, f 13-14=-258/730, 12-13=-921/299, 11-12=-478%2401 sI ol/ WEBS 2-19=-673/246, 2-18=-283/1123, 3-18=-1044/352, 3-17=-163/771, 5-17=-125/639, t! 5-16=-939/310, 6-16=-232/1024, 6-14=-467/168, 7-14=-135/714, 7-13=-1037/305, 8-13=-343/1679, 8-12=-1720/495, 10-12=-393/163, 1-19=-234/1137 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=46ft; eave=6ft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left -ind right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Bearing at joint(s) 21 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. .7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 581 lb uplift at joint 12, 247 lb uplift at joint 11 and 321 lb uplift at joint 21. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING-ONC. 2121 W SEARSS AV. TAMPA FL33818 PH:813-247-7400-FAX:813.247-7409 CA:8333 KELLY E LYONS, P.E. FL#56191 JOD 0133A Base 9-0-0 5x7 = 3x5 = 3x5 = 3x6 — 5x7 = Scale = 1:83.3 d d C" Ob C 21 45 = 5x7 = 3x4 a 4x10 II W2 9-0-0 it-0-0 9.2-0 8 13-10-13 19.3-11 24-0- 6.II lsl° I 5 +-»-�� 13 5.0-11 9-0-0 29.5.0 34-5-11 39-6 5 46 2 0 5.0.11 5-o-11 5-0-11 6-7.11 0-1-12 Plate Offsets (X Y)-- [1:0-0-0 1-2-31 f1.0-0-12 Edgel [6.0-5-4 0-2-81, [10:0-5-4,0-2-81. [14:0-2-8,0-3-01.120:0-5-4.0-2-121 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/defi Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.72 Vert(LL) -0.16 15 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.54 Vert(CT) -0.30 15-16 >999 240 BCLL 0.0 Rep Stress Incr YES WB 0.73 Horz(CT) 0.22 21 n/a n/a BCDL 10.0 Code FBC2017fTP12014 Matrix -MS Wind(LL) 0.15 15 >999 240 Weight: 281 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 3.4-8 oc purlins, except BOT CHORD 2x4 SP No.2 end verticals. WEBS 2x4 SP No.3 BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. WEDGE WEBS 1 Row at midpt 11-21 Left: 2x8 SP No.2 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer REACTIONS. (lb/size) 20=2257/0-8-0 (min. 0-2-11), 21=1290/0-4-0 (min. 0-1-8), 1=-142/0-3-8 (min. 0-1-8) Installation quide. Max Horz 1=376(LC 7) Max Uplift20=-585(LC 8), 21=-321(LC 8), 1=-247(LC 18) Max Grav20=2257(LC 1), 21=1290(LC 1), 1=165(LC 5) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-266/638, 2-3=-338/871, 3-4=-325/958, 4-5=-749/218, 5-6=-1392/405, 6-7=-1843/511, 7-8=-2489/595, 8-9=-2489/595, 9-21=-1740/486, 10-27=-1740/486, 10-11=-1213/344,12-21=-1290/321, 11-12=-1233/331 BOT CHORD 1-20=-576/124, 19-20=-920/303, 18-19=-217/692, 17-18=-320/1197, 16-17=-307/1218, 15-16=-548/2181, 14-15=-582/2099, 13-14=-321/1044 e WEBS 2-20=-388/164, 4-20=-1720/497, 4-19=-345/1679, 5,-19=-1037/307, 5-18=-133/714, / 6-18=-467/166, 6-16=-211/1024, 7-16=-939/287, 7-1 5=-1 61/639, 9-15=-105/771, 9-14=-10441319, 10-14=-250/1123, 10-13=-673/266, 11-13=-261/1137 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=6ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) - This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Bearing atjoint(s) 21 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 585 lb uplift at joint 20, 321 lb uplift at joint 21 and 247 lb uplift at joint 1. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813.247-7400-FAX:813.247-7409 CA:9333 KELLY E LYONS, P.E. FL#58191 goo I russ Truss Type - - 0133A IA2 I Piggyback Base Scale = 1:93.2 5x7 = 3x6 = 5x7 = 6.00 12 _ i 4xE O 23 3x4 11 13 5x7 = 4x5 = 4x10 II 9.4-0 9.4A 9+k-0 t 5-6-9 , 11.1-11 18.2-5 21-3.0 26.3-11 31-4.5 38-9-3 42-2.0 4 -0 49-2.4 49 -0 ' 5.6.9 5.5-1 5-0.11 5-0-11 5.0.1 5.0.11 5• 13 5-4.13 0 4.0 6.8.4 0. 12 LOADING (psf) SPACING- 2-0.0 CS1. DEFL. in (loc) I/defl Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.99 Vert(LL) -0.22 18 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.66 Vert(CT) -0.42 18-19 >999 240 BCLL 0.0 ` Rep Stress Incr YES WI3 0.86 Horz(CT) 0.29 13 n/a n/a BCDL 10.0 Code FBC2017frP12014 Matrix -MS Wind(I-Q 0.20 18 >999 240 Weight: 308 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied, except end verticals. BOT CHORD 2x4 SP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except: WEBS 2x4 SP No.3 5-2-8 oc bracing: 13-14 WEDGE 6-0-0 oc bracing: 12-13. Right: 2x8 SP No.2 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation auide. REACTIONS. (lb/size) 13=2621/0-8-0 (min. 0-3-1), 23=1437/0-4-0 (min. 0-1-10), 12=-320/0-3-8 (min. 0-1-8) Max Horz 23=-317(LC 6) Max Upliftl3=-653(LC 8), 23=-358(LC 8), 12=-41,7(1-0 17) Max Grav 13=2621 (LC 1), 23=1437(LC 1), 12=82(LC'8) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less Except when shown. _ TOP CHORD 1-2=-1462/401, 2-3=-1911/531, 3-29=-2356/626, 4 29=-2356/626, 4-5=-3074/714,. 5-6=-3074/714, 6-7=-2135/574, 7-8=-1514/436, 8-9=-695/220, 9-10=-257/1284, / 10-11=-270/1198, 11-12=-178/922, 1-23=-1390/366' - BOT CHORD 22-23=-192/280, 21-22=-155/1360, 20-21 =-1 52/1678, 19-20=-139/1699, 18-19=-343/2728, - 17-18=-304/2564, 16-17=-51/1327, 15-16=-64/1306, 14-15=0/597, 13-14=-1235/394, 12-13=-709/201 WEBS 2-22=-824/248, 2-21=40/536, 3-21=-326/91, 3-19=-•173/1099, 4-19=-1015/249, 4-18=-29/734, 6-18=-92/989, 6-17=-1222/301, 7-17. 223/1299, 7-15=-625/142, 8-15=-102/912, 8-14=-1238/340, 9-14=-393/1969, 9A3=-1965/538, 11-13=-462/174, 1-22=-260/1390 NOTES. 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=6ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are 3x5 MT20 unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) . This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Bearing at joint(s) 23 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 653 lb uplift at joint 13, 358 lb uplift at joint 23 and 417 lb uplift at joint 12. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W $EARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813.247-7409 CA:9333 KELLY E LYONS, P.E. FLN56191 Job -- cuss russ ype Q'y Ply 0133A A3 Piggyback Base 2 1 Job Reference (optional) pro, iafifipa,ri, r6uiv eunenec nun: 6.13U s Nov 13 Z017 Print: 5.130 s Nov 132017 MiTek Industries, Inc. Tue Nov 3 09:50:06 2020 Page 1 9.4 9-4-o ID:bOydnXKyuk5YJ6RXcsbcV4zIHOV-nDoI5rLN34Op8A1E8MIkE119Eg8FgMIEwe3wyMxhV �6 4 go 13 10-13 19-3-11 26 0 9 32-9-7 39-6-5 44-11-7 50.8-0 4 6 4 3-11-12 5.4-13 5 4_13 6-8.14 6-8-14 8-&14 5.5-1 5-8.9 Scale = 1:89.6 5x7 6.00 12 3x6 = 5x7 = 61 o e ne 10 22 13 4x5 = 5x7 — 3x4 II 4x10 11 M-112 94-0 8-4.0 �-4.0„ 8.2-0 B�6r0 13-10-13 19-3.11 24-0-5 29.5.0 34-5.11 39-8.5 44.11-7 50.8-0 1.4-0 6.8-0 0.4 0 5-0-13 5-0.13 5-0-11 11 5.0-11 5.0.11 1 5-&- 0.1-12 Plate Offsets (X,Y)-- [1:0-0-0,1-2-31 [1:0-0-8,Edoe1 r6:0-5-4 0-2-81[10:0-5-4,0-2-8],[20:0-2-8.0-3-01,[22:0-5-4,0-3-01 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.99 Vert(LL) -0.22 18 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.66 Vert(CT) -0.42 17-18 >999 240 BCLL 0.0 Rep Stress Incr YES WB 0.86 Horz(CT) 0.28 13 n/a n/a BCDL 10.0 Code FBC2017ITP12014 Matrix -MS Wind(LL) 0.20 18 >999 240 Weight: 308 lb FT = 20% LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 WEDGE Left: 2x8 SP No.2 BRACING - TOP CHORD Structural wood sheathing directly applied, except end verticals. BOT CHORD Rigid ceiling directly applied or 5-2-8 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation quide. REACTIONS. (lb/size) 22=2622/0-8-0 (min. 0-3-1), 13=1437/0-4-0 (min. 0-1-10), 1=-320/0-3-8 (min. 0-1-8) Max Horz 1=317(LC 7) Max Uplift22=-669(LC 8), 13=-356(LC 8), 1=-417(LC 18) Max Grav22=2622(LC 1), 13=1437(LC 1), 1=141(LC 5) FORCES, (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-227/922, 2-3=-295/1285, 3-4=-694/200, 4-5= 632/212, 5-6=-1502/437, 6-7=-2135/585, 7-8=-3074/740, 8-9=-3074/740, 9-28=-2356/642, 10-28=-2356/642, 10-11=-1911/541, 11-12=-1462/407, 12-13=-1390/372, BOT CHORD 1-22=-751/187, 21-22=-1236/385, 20-21 =-1 28/651, 19-20=-211/1327, 18-19=-405/2564, 17-18=-428/2727, 16-17=-244/1699, 15-16=-257/1678, 14-15=-204/1307 - WEBS 2-22=-462/179, 3-22=-1964/552, 3-21=-411/1969, 5-21=-12391351, 5-20=-113/908, - 6-20=-631/152, 6-19=-236/1301, 7-19=-1221/315, 7-18=-110/989, 9-18=-70/733, 9-17=-10151259, 10-17=-183/1099, 10-15=-326/114, 11-15=-70/536, 11-14=-824/252, 12-14=-266/1390 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=6ft; Cat. II; Exp B; Encl., GCpi=0.18: MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are 3x5 MT20 unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) ' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Bearing atjoint(s) 13 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 669 lb uplift at joint 22, 356 lb uplift at joint 13 and 417 lb uplift at joint 1. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Truss 6.00 12 5x5 = Special 3 Roof Special Girder 9-4-0 Special Special Special 3x4 = 27 28 4 29 Special Special Special Special 3x8 = Special3x6 = 3x4 = 22 39 21 40 20 19 41 42 18 43 44 45 1746 47 48 16 49 4x5 = 4x4 = 4x4 = 4x8 = Special Special 2x4 11 Special 7x8 = Special 2x4 11 l S i Special Sp ecial pecapecial 6x8 = 4x10 II Special Special Special4x4 = Special 4x4 — Special — Special 21 Job Reference (optionap nt: 8.130 a Nov 13 2017 MiTek Industries, Inc. Tue Nov 3 09:50:10 2020 Page 1 :sbcV4zIHOV-g 2GxDPt7JWFdnKONCgggg§tSVQCQyByrurChyMxhF 28-1.0 29-8-0 ill"35.4-0 5-3-4 1-7-0 1-10-0 3-10-0 Scale = 1:68.6 Special Special 5x7 = Special 2x4 II Special Special I T4I5 36 8 379 5x12 = 2x4 II 10 38 11 2 d 32 N v 1s 14 13 Io 50 4x5 = d 2x4 11 Special Special M42 94.0 1.4.0 „ 3-11.4 7.0.0 7-10.0 12-3-4 ' 1-4.0 " 2-5.8 ' 3.0.12 0.10. 45.4 0-1-12 17-6.9 5.3' 22-9.12 5.3-0 28.1.0 5.3.4 29-BA 31A-0 1-7-0 1.10A 1a2-a 35-0-0 3-10.0 Plate Offsets (X,Y)-- [1:0-0-12,1-3-131 [1:0-2-12,0-0-101 [3:0-2-8 0-2-4),[9:0-5-4,0-2-81,[15:0-2-12,0-2-121,[17:0-3-8 0-4-51 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.49 Vert(LL) -0.07 17 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.64 Vert(CT) -0.13 17 >999 240 BCLL 0.0 ' Rep Stress Incr NO WB 0.40 Horz(CT) 0.03 12 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Matrix -MS Wind(LL) 0.08 17 >999 240 Weight: 462 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except BOT CHORD 2x6 SP No.2 *Except* end verticals. B4: 2x4 SP No.3 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except: WEBS 2x4 SP No.3 6-0-0 oc bracing: 1-22,21-22. WEDGE Left: 2x6 SP No.2 REACTIONS. (lb/size) 12=1522/Mechanical, 21=3419/0-8-0 (min, 0-2-0), 1=-617/0-3-8 (min. 0-1-8) Max Horz 1=111(LC 7) Max Uplift12=-575(LC 5), 21=-1201(LC 8), 1=-791(LC 18) . Max Grav 1 2= 1 526(LC 18), 21=3419(LC 1), 1=318(LC 6) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-430/1187, 2-3=-378/1158, 3-27=-663/1930, 27-28=-663/1930, 4-28=-663/1930, 5-32=-2620/960, 32-33=-2620/960, 6-33=-2620/960, 6-34=-2620/960, 7-34=-2620/960, 7 7-35=-2871/1079, 35-36=-2871/1079, 36-37=-2871/1079, 8-37=-2871/1079, 8-9=-2874/1071, 9-10=-2822/1036 BOT CHORD 1-22=-1022/354, 22-39=-1467/529, 21-39=-1467/529, 19-41=-685/1967, 41-42=-685/1967, - 42-43=-685/1967, 18-43=-685/1967, 18-44=-685/1967, 44-45=-685/1967, 45-46=-685/1967, 17-46=-685/1967, 17-47=-178/556, 47-48=-178/556, 48-49=-178/556, 16-49=-178/556, 8-15=-343/276, 14-15=-957/2547, 13-14=-1045/2759, 13-50=-1037/2754, 12-50=-1037/2754 WEBS 4-19=-288/1283, 5-19=-2113/735, 5-18=0/394, 5-17=-302/789, 7-17=-618/428, 15-17=-770/2092, 7-15=-174/286, 9-15=-231/613, 9 14=-227/640, 10-14=-327/151, 10-12=-2934/1079, 3-21=-1455/614, 4-21=-2765/989, 3-22=-284/764 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-9-0 oc, 2x4 - 1 row at 0-9-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=5ft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) • This truss has been designed for a live load of 20.Opsf on the bottom chord In all areas where a rectangle 3-6-0 tall by 2-0-0 wide !/ wii; fit between the bottom chord and any other members. ftTURAL. RUC ALLTECH STRUCTURAL ft@6�jr } for truss to truss connections. ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA-9333 KELLY E LYONS, P.E. FL#58191 JOD Truss Truss Type y 0133A AH7A Half Hip Girder 1 3 Job Reference optional) - ,..• - - -_ ---'"---- Gu �. " " ion "'-S`T 11tlJ, In G. utl IVOV J Vy: DU:CI Lulu ra e 7 off^ ID:liOydnXKyuk5YJ8RXcsbcV4zIHOV-r6COF_XnXhvhST g7WOWFLB017tHoh.�;. 133w5Yy xhG 11-2-8 15-5-0 19-7-8 23-10 O 28-1-4 324. 8 36-7-12 40-11-0 45-7-12 50-8 0 7-5 12 2.5 8 3-0-12 4-2 8 4-2-8 4-2-8 4-2$ 4-3 4 4 3 4 4.3 4 4-3-4 441-12 5-04 Scale = 1:87.6 Special Special Special Special Special Special Special Special Special Special Special 5x10 M18SHS= Special Special 3x6}= Special Special Special 3x6 = Special 3x6 = Special Special 6.00 12 • Special Special 2x4 11 3x8 = Speclal13x6 = 3x4 11 3x8 = 2x4 11 3x8 = 3x4 II Specl2l3x6 = r�g 4x5 = 4x14 i 4 37 5 38 T? _ 6 39 40 417 8 42 9 43 4(2 10 4546 411 48 12 49 5413 51 1452 l55f 16 55 17 56 2 34 33 32 5731 30 50 2959 60 4x5 = 6x6 = 2x4 11 4x6 = Special 2x4 11 7x10 \\ Special 4x8 = Special Special Specia Special 24 23 I 64 25 65 66 67 68 69 22 70 71 a f 28� 6162 27 63 4x6 = Special 08 - 2x4 II Special20 7273 19 74 7518 4x8 = 3x4 11 2x4 11 Special Special 3x4 II 4x8 = 3x4 11 Special Special7x8 = Special Special Special Special Special I Special Special Special Special Special Special 9N.ra 9A-0 ,1.4.On 4-5-0 , 7-0.0 , 11-2-s 1-0.0° 2-11.4 1 2.7-0 4-2-5 4-2.8 0.1-12 19.7-9 23-10-0 29.1.4 4-2-s +' 4-2.8 4.3-0 32.4-8 38-7.12 4.3.4 4.3-0 40.11.0 4.3.4 45.7-12 50-8-0 4-s-12 5-0-0 9-4.0 Plate Offsets (X,Y)- f2:0-0-0,0-1-151 [4:0-6-8 0-1-12] [21:0-2-8 0-3a8],f26:0-2-8.0-3-81,[33:0-3-0,0-3-121,[34:0-5-10.0-3-81 LOADING (psf) SPACING- 2-0-0 CSI. DEFL, in (loc) I/defl Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.88 Vert(LL) -0.45 23-24 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.59 Vert(CT) -0.84 23-24 >661 240 M18SHS 244/190 BCLL 0.0 Rep Stress Incr NO Will 0.75 Horz(CT) 0.18 18 n/a n/a BCDL 10.0 Code FBC2017/TP12014 Matrix -MS Wind(LL) 0.51 23-24 >999 240 Weight: 1005 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 `Except' TOP CHORD T1: 2x4 SP No.1 BOT CHORD 2x6 SP No.2 `Except' BOT CHORD B3: 2x4 SP No.3 WEBS 2x4 SP No.3 "Except' W2: 2x4 SP No.2 Structural wood sheathing directly applied or 6.0-0 oc purlins, except end verticals. Rigid ceiling directly applied or 10-0-0 oc bracing, Except: 6-0-0 oc bracing:1-34,33-34,32-33,30-32. REACTIONS. (Ib/size) 18=2240/0-4-0 (min. 0-1-8), 33=11941/0-8-0 (min. 0-4-11), 34=-8345/0-3-8 (min. 0-1-8) Max Horz34=163(LC 5) Max Uplift18=-789(LC 5), 33=-4137(LC 8), 34=-8460(LC 18) MaxGrav18=2240(LC 1), 33=11941(LC 1), 34=2837(LC 8) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-899/2525, 2-3=-943/2777, 3-4=-4115/12193, 41-37=-553/1663, 5-37=-553/1663, 5-38=-553/1663, 38-39=-553/1663, 39-40=-553/1663, 6-40=-553/1663, 6-41=-3189/1149, 41-42=-3189/1149, 7-42=-3189/1149, 7-8=-7325/2537, 8-43=-7325/2537, 9-43=-7325/2537, 9-44=-7446/2571, 44-45=-7446/2571, 10-45=-7446/2571, 10-46=-9350/3187, 46-47=-9350/3187, 47-48=-9350/3187, 11-48=-9350/3187, 11-49=-9350/3187, 12-49=-9350/3187, 12-50=-9350/3187, 13-50=-9350/3187, 13-51=-7184/2459, 51-52=-7184/2459, 14-52=-7184/2459, 14-53=-7062/2425, 15-53=-7062/2425, 15-54=-7062/2425, 16-54=-7062/2425, 16-55=-2756/978, 55-56=-2750/978, 17-56=-2750/978,17-18=-2133/816 BOT CHORD 1-34=-2330/847, 33-34=-10159/3486, 32-33=-5227/1782, 32-57=-5258/1793, 31-57=-5258/1793, 30-31=-5258/1793, 30-58=-370/1057, 58-59=-370/1057, 29-59=-370/1057, 29-60=-370/1057, 60-61=-370/1057, 28-61=-370/1057, 28-62=-135/397, 62-63=-135/397, 27-63=-135/397, 9-26=-319/233, 26-64=-2996/9063, 25-64=-2996/9063, 24-25=-2996/9063, 24-65=-2996/9063, 65-66=-2996/9063, 66-67=-2996/9063, 23-67=-2996/9063, 23-68=-2996/8889, 68-69=-2996/8889, 22-69=-2996/8889, 22-70=-2996/8889, 70-71=-2996/8889, 21-71=-299618889, 14-21=-342/276, 20-72=-141/399, 72-73=-141/399, 19-73=-141/399 WEBS 3-33=-2531/921, 4-33=-9707/3376, 4-32=-742/271, 4-30=-1573/4660, 5-30=-420/305, 6-30=-3520/1186, 6-28=-920/2766, 7-28=-2569/998, 26-28=-963/2941, 7-26=-1566/4669, 10-26=-1796/592, 10-24=0/364, 10-23=-139/321, 11-23=-334/239, 13-23=-185/516, 13-22=0/343, 13-21=-1892/624, 19-21=-881/2450, 16-21=-1643/4753, 16-19=-2490/1061, 17-19=-1145/3331, 2-34=-127/503, 3-34=-3398/10007 NOTES- 1) 3-ply truss to be connected togetherwith 10d (0.131"x3") nails as.follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-9-0 oc, 2x4 -1 row at 0-9-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. Continued on page 2 ALLTECH STRUCTURAL YV ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813.247-7409 CA:9333 KELLY E LYONS, P.E. FL#58191 doo I russ I cuss I ype Oty Ply 0133A JAH7A I Half Hip Girder I1 8.130aNov 132017 NOTES- 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=6ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) Provide adequate drainage to prevent water ponding. 6) All plates are MT20 plates unless otherwise indicated. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) * This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 789 lb uplift at joint 18, 4137 lb uplift at joint 33 and 8460 lb uplift at joint 34. 10) This truss has large uplift reaction(s) from gravity load case(s). Proper connection is required to secure truss against upward movement at the bearings. Building designer must provide for uplift reactions indicated. 11) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 95 lb down and 113 lb up at 7-0-0, 107 lb down and 109 lb up at 9-0-12, 107 lb down and 109 lb up at 11-0-12, 95 lb down and 1,09 lb up at 13-0-12, 95 lb down and 109 lb up at 15-0-12, 95 lb down and 109 lb up at 17-0-12, 95 lb down and 109 lb up at 19-0-12, 95 lb down and 109 lb up at 21;0-12, 95 lb down and 109 lb up at 23-0-12, 83 lb down and 97 lb up at 25-0-12, 83 lb down and 97 lb up at 27-0-12, 83 lb down and 97 lb up at 29-0-12, 83 lb down and 97 lb up at 29-9-4, 83 lb down and 97 lb up at 31-9-4, 83 lb down and 97 lb up at 33-9-4, 83 lb down and 97 lb up at 35-9-4, 83 lb down and 97 lb up at 37-9-4, 95 lb down and 97 lb up at 39-9-4, 107 lb down and 109 lb up at 41-9-4, 107 lb down and 109 lb up at 43-94, 107 lb down and 109 lb up at 45-9-4, and 107 lb down and 109 lb up at 47-9-4, and 102 lb down and 107 lb up at 49-9-4 on top chord, and 50 lb down and 82 lb up at 7-0-0, 51 lb down at 9-0-12, 51 lb down at 11-0-12, 51 lb down at 13-0-12, 51 lb down at 15-0-12, 51 lb down at 17-0-12, 51 lb down at 19-0-12, 51 lb down at 21-0-12, 51 lb down at 23-0-12, 47 lb down at 25-0-12, 47 lb down at 27-0-12, 47 lb down at 29-0-12, 47 lb down at 29-94, 47 lb down at 31-9-4, 47 lb down at 33-94, 47 lb down at 35-9-4, 47 lb down at 37-9-4, 47 lb down at 39-9-4, 51 lb down at 41-9-4. 51 lb down at 43-9-4, 51 lb down at 45-9-4, and 51 lb down at 47-94, and 56 lb down at 49-9-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increase=1.25 Uniform Loads (plf) Vert: 14=-54, 4-17=-54, 1-27=-20, 21-26=-20, 18-20=-20 Concentrated Loads (lb) Vert: 4=-68(B) 8=-68(B) 25=-23(B) 32=9(B) 30=-33(B) 5=-68(13) 16=-68(B)19=-33(B) 37=-68(B) 39=-68(B) 40=-68(B) 41=-68(B) 42=-68(B) 43=-68(B) 44=-56(B) 45=-56(B)46=-56(B) 47=-56(B) 48=-56(B) 49=-56(B) 50=-56(B) 51=-56(B) 52=-56(B) 53=-68(B) 54=-68(B) 55=-68(B) 56=-75(B) 57=-33(B) 58=-33(B) 59=-33(B) 60=-33(B) 61=-33(B) 62=-33(B) 63=-33(B) 64=-23(B) 65=-23(B)66=-23(B) 67=-23(B)68=-23(B) 69=-23(B) 70=-23(B) 71=-23(B) 72=-33(B) 73=-33(B) 74=-33(B) 75=-36(B) vn'a ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W SEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813.247-7409 CA:9333 KELLY E LYONS, P.E. FL456191 Job rusS Truss Type Fly 0133A %AMC �.,_..,. C: —-,.::_____ AH9 Roof Special Girder _ 71� 2 Job Reference (optional) • .. -.. _ ,...,,. �. ,..� � ,.... ,.+�..,. �,.,,.. �..w a ..w is cv a mn en n:uusmns, ma i un rvw u Va:au:zq zvtu ra e 7 gq-0 ID:bOydnXKyuk5YJ6RXcsbcV4zlHOV-F u.Yt?zfgcHGJxPiC84yzg2E 5F FA1Hbity xhD 8 541� 4-104 8 10 0 13-7-14 1840-23.0-2 27-10A .29 8-0, 34-7.8 39 7-0 43-2-3 46-9-5 60 8-0 5 1 3 4-8 3-11-12 49 14 4 B-2 4-9-14 '1-10-0' 411-8 4-11 6 3 7 3 3-7 3 3 10 11 5xl0 M18SHS= 6.00 12 2x4 I I 4 36 5 3x5 G 3 2 0 1 4x8 = 3x6 = 3x6 = 6 R 33 32 31 30 29 28 27 26 4x5 = 4x6 = 8x8 = 4x6 = 4x6 = 2x4 II 4x8 = 6x12 \\ 4x10 = 5x5 = 9 5x5 = 25 44 = 3x4 11 7x8 = Scale = 1:89.2 Special Special Special Special Special 4x6 = Special Special 3x8 = Special 3x4 II 3x6 = 3x10 = 3x4 11 2x4 II 7x10 = 20 46 19 Special Special 3x4 11 4x10 Special Special Specie 4748 18 49 5017 20 11 6x6 = Special Special Special "42 ,1-0.0u 4-104 '1.40" 3-0-e 0-1-12 94-0 , 7-10.0 810p 13.7-14 , 2-11-12 -0 4-9.14 18-0-0 , 23.0-2 , 28-1.0_ 4.8.2�- 4-8.2 5.0-1 ,29.8.0 1-7.0 34.7.8 4-it-8 39.7-0 4•it-8 43-2.3 3-7.3 46-M 3.7.3 94-0 50-BA 3-10.11 Plate Offsets (X,Y)-- [4:0-7-0,0-2-01 r9:0-2-8 0-2-41 [21:0-3-12 0-3-41,[24:0-2-4,0-3-81 [31:0-3-8 0-4-01 r33:0-0-13 0-1-91 r33.0-3-0 0-1-41 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/defl L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.97 Vert(LL) -0.41 21-22 >999 360 MT20 2441190 TCDL 7.0 Lumber DOL 1.25 BC 0.81 Vert(CT) -0.74 21-22 >673 240 M18SHS 244/190 BCLL 0.0 Rep Stress Incr NO WB 0.89 Horz(CT) 0.15 17 n/a n/a BCDL 10.0 Code FBC2017/TPl2014 Matrix -MS Wind(LL) 0.45 21-22 >999 240 Weight: 696 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 3-11-13 oc purlins, BOT CHORD 2x6 SP No.2 `Except' except end verticals. B4,B6: 2x4 SP No.3, 135: 2x6 SP No.1 BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. WEBS 2x4 SP No.3 REACTIONS. (lb/size) 17=2274/0-4-0 (min. 0-1-8), 31=7025/0-8-0 (min. 0-4-2), 33=-3537/0-3-8 (min. 0-1-8) Max Horz 33=1 82(LC 7) Max Upliftl7=-798(LC 5), 31=-2229(LC 8), 33=-3746(LC 18) Max Grav17=2276(LC 18), 31=7025(LC 1). 33=1156(LC 8) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-320/866, 2-3=-1872/5740, 3-4=-2331/7218, 4-36=-1220/3762, 5-36=-1220/3762, e% 5-6=-1220/3762,6-7=-800/333,7-8=-800/333,8-9=-3632/1199,9-10=-4159/1345, did/ 10-11=-6258/2050, 11-37=-7932/2795, 37-38=-7932/2795, 12-38=-7932/2795, 12-39=-7763/2732, 13-39=-7763/2732, 13-14=-3817/1370, 14-40=-3817/1370, 15-40=-3817/1370 BOT CHORD 1-33=-737/292, 32-33=-747/260, 31-32=-5104/1691, 30-31=-6612/2247, 29-30=-6612/2247, 1� - 28-29=-1293/570, 27-28=-1293/570, 26-27=-1293/570, 9-24=-495/1650, 23-24=-1920/6184, 22-23=-3032/9005, 22-43=-3032/9005, 43-44=-3032/9005, 44-45=-3032/9005, 2145=-3032/9005, 12-21=-357/292, 20-46=-131/354, 19-46=-131/354, 19-47=-804/2217, 47-48=-804/2217, 18-48=-804/2217, 18-49=-804/2217, 49-50=-804/2217, 17-50=-804/2217 WEBS 3-32=-354/1308, 3-31 =-1 629/566, 4-31=-6029/1971, 4-29=-1198/3859, 5-29=-284/155, 6-29=-3385/1083, 6-26=-945/2854, 8-26=-2038/740, 24-26=-212/700, 8-24=-1108/3338, 10-24=-3946/1340, 10-23=-407/1107, 11-23=-3014/1255, 11-22=-411/1334, 11-21=-1165/371, 19-21=-1289/3705, 13-21=-1607/4655, 13-19=-2790/1067, 15-19=-765/2223, 15-18=0/258, 15-17=-2992/1035, 2-33=-956/3205, 2-32=-4503/1471 NOTES- 1) 2-ply truss to be connected together with 1 Od (0.131 "x3") nails as follows: Top chords connected as follows: 2x4 -1 row at 0-9-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-9-0 oc, 2x4 - 1 row at 0-9-0 oc. Webs connected as follows: 2x4 -1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads notedas (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.0psf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=6ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) Provide adequate drainage to prevent water ponding. ALLTECH STRUCTURAL 6) All plates are MT20 plates unless otherwise indicated. ENGINEERING, INC. dArTttA§&891 liftbVn designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 2121 W BEARSS AV. TAMPA FL33618 PH:813.247.7400-FAX:813.247-7409 CA:9333 KELLY E LYONS, P.E. FL856191 Job I russ Truss Type Qty ply 0133A�AHEIA1 Hip 1 Job Reference (optional) C" ii -1— , Illcn llluuOglOJ, uIG. Iuumv JVV.Ou.[o LVLV re e I y q c ID:bOydnXKyuk5YJ6RXcsbcV4zlHOV-C37JlhbwLDX YEZ4JZ602F7b9uunMl/��Y�iLmhmmy xh6 4 5 0 9-0.0 16.5.0 23-10-0 29 65 35-2-11 40.11 0 45 4-e 49-1V 50 8 0 1-5 12 2-11 4 4.7-0 7-5-0 7-5A 5 9-5 5-6.5 5-8-5 4-5 8 0-10-0 SX10 = 6.00 12 Scale = 1:88.3 3X4 11 3x6 = 3x4 11 3X10 = 3X6 = 3x5 = 3x5 = 3x4 11 5x5 = 13 14 cn 5 o aI 26 25 24 23 22 21 5x10 M18SHS= 17 16 15 4x5 — 4x6 II 4x12 = 3x6 — 5x12 = 3x4 II 3x4 II 4x10 = 5x5 = 7x8 = b442 9.4.9 9-0-0 i1.4-Ou 4-5.0 , 9-0-0 155-0 23A 0 , 32_ 1 , 40.11-0 , 45-0•B , 50.8-0 , 1-4-0° 2-it-4 4-7-D 7-5.0 7-5.0 B-O-B B•6-8 4.5.8 53.8 0.1-12 Plate Offsets (X,Y)— [3:0-6-13,Edge],r4:0-8-0,0-2-81 [5:0-3-8 0-1-81,[13:0-2-8,0-2-41,[19:0-5-0,0-3-01 [20:0-5-4 0-2-121 [24:0-3-8 0-2-01 [26.0-3-8 Ed4el LOADING (psf) SPACING- 2-0-0 CS1. DEFL. in (loc) I/defl Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.93 Vert(LL) -0.76 19-20 >731 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.99 Vert(CT) -1.49 19-20 >372 240 M188HS 244/190 BCLL ().0 Rep Stress Incr YES W13 1.00 Horz(CT) 0.38 15 n/a n/a BCDL 10.0 Code FBC2017/TP12014 Matrix -MS Wind(LL) 0.72 19-20 >768 240 Weight: 299 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied, except end verticals. BOT CHORD 2x4 SP No.2 `Except' BOT CHORD Rigid ceiling directly applied or 2-2-0 oc bracing. 83: 2x4 SP No.3, B4: 2x4 SP No.1 WEBS 1 Row at midpt 3-25, 9-18 WEBS 2x4 SP No.3 `Except` MiTek recommends that Stabilizers and required cross bracing W2,W4: 2x4 SP No. 1, W7,W11: 2x4 SP No.2 be installed during truss erection, in accordance with Stabilizer Installation quide. REACTIONS. (lb/size) 26=-3395/0-3-8 (min. 0-1-8), 25=5660/0-8-0 (min. 0-6-11), 15=1474/0-4-0 (min. 0-1-12) Max Horz 26=202(LC 7) Max Uplift26=-3470(LC 18), 25=-1396(LC 8), 15=-392(LC 5) Max Grav26=795(LC 8), 25=5660(LC 1), 15=1474(LC 1) i FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (Ib) or less except when shown. TOP CHORD 1-2=-167/532, 2-3=-144/628, 3-4=-198/606, 4-30=-1674/499, 5-30=-1674/499, " 5-6=-4651/1215, 6-7=-4651/1215, 7-8=-4717/1217, �8-9=-5260/1289, 9-10=-3889/997, 10-31=-3889/997, 11-31=-3889/997, 11-12=-3822/986, 12-13=-1479/439 BOT CHORD 1-26=-486/167, 25-26=-4591/1141, 24-25=-4591/1141, 23-24=-591/195, 22-23=-591/195, 7-20=-339/193, 19-20=-1242/5290, 18-19=-1175/5027, 11-18=-265/203 ' y, ��/' WEBS 3-26=-1267/5171, 3-25=-5431/1401, 3-24=-1066/4553, 4-24=-1872/542. 4-22=-649/2613, -,r J 5-22=-1584/520, 20-22=-347/1612, 5-20=-766/3185, 8-20=-647/209, 9-19=0/418, 9-18=-1261/354, 16-18=-429/1532, 12-18=-671/2786, 12-16=-1767/560, 13-16=-450/1793, p'E/ 13-15=-1415/490 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf, h=25ft; B=45ft; L=24ft; eave=6ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) ` This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing, plate capable of withstanding 3470 lb uplift at joint 26, 1396 lb uplift at joint 25 and 392 lb uplift at joint 15. 8) This truss has large uplift reaction(s) from gravity load case(s). Proper connection is required to secure truss against upward movement at the bearings. Building designer must provide for uplift reactions indicated. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247.7400-FAX:813.247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Job I russ I russ I ype Qty ply 33 0133A AH11 Roof Special 1 1 Job Reference o tional -- ---�-„'•' -_.-_...._..__ ,..u,. v.wvo ,vuv ,a ..I rm u. o. iou s,vuv io—f ivnium ino mub,,uu. we Nov au%ou;zf ZuZu ra el 0 ID:bOydnXKyuk5YJBRXcsbcV4zlHOV gGZhV1cY6XfgAO7HtGdfbSgnwIGAI�I8s9WFJCy xhA 5-9 4 1t__0 15-10.0 20-10A . 25-10-0 , 28-1-0 i 33-10-0 39-7.0 44.8.8 49-10-0 50.8 o 1-5-12 4-2.8 5-1-12 ' 5-0-0 ' 5-0-0 5-0-0 2-3-0 5-9.0 5-9-0 5-1-8 5-1.8 0-10-0 5x10 M18SHS 4x5 = 5x5 = 6x6 = 6.00 12 4 s� G G 7 Sr7 = 2X4 11 3x6 = _ A..G — 28 27 26 25 P4 23 22 21 17 4x5 = 3x6 = 5x5 = 2x4 II 3x4 II 6x6 = 6x6 = 4x5 = 4xl0 = Scale = 1:90.0 3x4 11 r�s = 13 14 r? V5 N vI� 16 15 4x8 = 3x5 = B.bl)2 9.4.0 28-1-0 94-0 1.4-On 8.2-0 , 10-10-0 , 18-4.0 i ___ 25.10-0 ,27-8-0, i 33-10-0 i 39-7.0 , 44-&8 50.80 1" 6-8-0 2.8.0 7.6.0 7.8-0 '1.10-0'' S-8.0 5.9.0 5.1.8 5-11.8 0-1-12 0.5-0 Plate Offsets (X,Y)-- [4:0-7-4,0-2-81,[6:0-2-8.0-3-01 [7:0-2-12 0-1-121 [8:0-5-4 0-3-41 [13:0-2-8 0-2-41 [18.0-6-0 0-5-01 [20.0-5-12 0-4-01 [24.0-2-8 0-3-41 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.86 Vert(LL) -0.46 19-20 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.85 Vert(CT) -0.89 19-20 >568 240 M18SHS 244/190 BCLL 0.0 ' Rep Stress Incr YES WI3 0.90 Horz(CT) 0.25 15 n/a n/a BCDL 10.0 Cade FBC2017[TP12014 Matrix -MS Wind(LL) 0.44 19-20 >999 240 Weight: 317 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No,2 *Except* TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except T1: 2x4 SP No.1 end verticals. BOT CHORD 2x4 SP No.2 *Except* BOT CHORD Rigid ceiling directly applied or 2-11-12 oc bracing. B5: 2x4 SP No.3 WEBS 1 Row at midpt 5-25, 7-23, 8-22 WEBS 2x4 SP No.3 *Except* 2 Rows at 1/3 pts 4-27 W8,W2: 2x4 SP No.2 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation auide. - REACTIONS. (lb/size) 27=4458/0-8-0 (min. 0-5-4), 15=1195/0-4-0 (min. 0-1-8), 28=-1909/0-3-8 (min. 0-1-8) Max Horz28=223(LC 7) — Max Uplift27=-1102(LC 8), 15=-331(LC 5), 28=-2091(LC 18) - - Max Grav27=4458(LC 1), 15=1195(LC 18), 28=461(LC 5) _ FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1151358, 3-4=-969/4175, 4-32=-404/1942,,5-32=-404/1942, 5-6=-260/84, " 6-7=-1272/398, 7-8=-3495/918, 8-9=-3562/905, 9-33=-3562/905, 10-33=-3562/905, 10-11=-3326/854, 11-12=-3326/854, 12-13=-1293/389 �- BOT CHORD 27-28=-3184/762, 26-27=-1985/571. 25-26=-1985/5,71, 24-25=-558/205, 23-24=-90/578, ' r 19-20=-638/3044, 18-19=-883/3384, 10-18=-352/173 �� WEBS 3-27=-833/324, 4-27=-4061/994, 4-25=-331/1604, 5-25=-2091/538, 5-24=-272/1406, 6-24=-1227/375, 6-23=-238/1108, 7-23=-1843/449,.8-19=-223/571, 9-19=-363/203, g 10-19=-45/255, 16-18=-403/1323, 12-18=-545/2289, 12-16=-1356/485, 13-16=-382/1482, 1 8-20=-1971/578, 20-23=-297/1702, 7-20=-875/3681;, 13-15=-1157/451, 3-28=-778/3585 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; 'TCDL=4.Opsf, BCDL=6.Opsf, h=25ft; B=45ft; L=24ft; eave=6ft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) . This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 1102 lb uplift at joint 27, 331 lb uplift at joint 15 and 2091 lb uplift at joint 28. 8) This truss has large uplift reaction(s) from gravity load case(s). Proper connection is required to secure truss against upward movement at the bearings. Building designer must provide for uplift reactions indicated. LOAR CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FLOS6191 Job Truss Truss Type ty y 0133A AH11A Hip 1 1 Job Reference (optional) vra, i ampa,ri, Pedro Jimenez Run: 8.130 s Nov 13 2017 Print: 8.130 s Nov 13 2017 MITek Industries, Inc, Tue Nov 3 09:50:29 2020 Page 1 0 94-0 ID:bOydnXKyuk5YJ8RXcsbcV4zlHOV-cehRwjdoe8vYPiH( hg7gtl7J8yaZtN,6JJ?MN5yMxh8 1-�1� 6.2.14 11-0-0 17-5.0 23-10-0 29-9.8 35-9.0 41-8-8 7- 0-0 50.8- S 1 492 4.9-2 6-5-o511.8511 8 61 8 2-10.0 Scale = 1:88.2 5x7 = 5x6 = 6.00 12 4 31 5 TO 3x4 11 05 3x6 = 3x8 = 2x4 II 3x6 = 5x8 = — 6 7 e T, 9 3210 4x5 � 1 12 v F-- An a - i 3x8 MT1-8-F11 27 26 25 24 23 22 3x10 = 16 15 14 4x5 — 6x6 — 3x6 = 010 = 3x4 II 3x4 11 08 = 3x4 II 5x7 = 951•t2 94-0 9.4-0 ,1-4-0„ 4.5.0 11-0.0 , 17.5-0 i 23.10.0 29.9.8 35-9-0 41-8-8 47.10-0 fi0.B-0 '1 4-011 2-11.4 6.7-0 6.5.0 B•$-0 5.1 -B 5.11•B 5-11-8 6.1.8 &10-0 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.87 Vert(LL) -0.58 20-21 >948 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.79 Vert(CT) -1.10 20-21 >505 240 MT18HS 244/190 BCLL 0.0 Rep Stress Incr YES WB 0.99 Horz(CT) 0.41 14 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Matrix -MS Wind(LL) 0.55 20-21 >999 240 Weight: 311 lb FT = 20% LUMBER- . BRACING- TOP CHORD 2x4 SP No.2 Except TOP CHORD Structural wood sheathing directly applied or 2-4-8 oc purlins, except T1: 2x4 SP No.1 end verticals. BOT CHORD 2x4 SP No.2 *Except* BOT CHORD Rigid ceiling directly applied or 3-11-3 oc bracing. B3: 2x4 SP No.3, 134,135: 2x4 SP No.1 WEBS 1 Row at midpt 2-26, 3-26, 5-23 WEBS 2x4 SP No.3 *Except* MiTek recommends that Stabilizers and required cross bracing W1,W7,W12: 2x4 SP No.2 be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS. (lb/size) 14=1502/0-4-0 (min. 0-1-12), 27=-2956/0-3-8 (min. 0-1-8), 26=5192/0-8-0 (min. 0-6-2) Max Horz27=224(LC 7) Max Upliftl4=-376(LC 8), 27=-3000(LC 18), 26=-1262(LC 8) Max Grav 14=1502(LC 1), 27=669(LC 8), 26=5192(LC 1) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-74/315, 2-3=-1135/4676, 3-4=-449/176, 4-31=-1701/533, 5-31=-1701/533, - 5-6=-4177/1107, 6-7=-4216/1112, 7-8=-4216/1112, 8-9=-4363/1128, 9-32=-4363/1128, 4 10-32=-4363/1128, 10-11=-4363/1128, 11-12=-3365/888, 12-13=-838/278, 13-14=-1488/387 BOT CHORD 26-27=-342/48, 25-26=-1923/448, 24-25=-1923/448, 23-24=-79/322, 6-21=-319/182, F 20-21 =-1 042/4711, 19-20=-1042/4711, 18-19=-10&4711, 17-18=-909/3401, 11-17=-872/327 ®.17 WEBS 2-27=-596/2767, 2-26=-4054/1063, 3-26=-4546/1195, 3-24=-547/2605, 4-24=-1300/380, ` 4-23=465/1870, 5-23=-1672/510, 21-23=-365/1744', 5-21=-648/2792, 8-21=-589/146, 8-20=0/256, 8-18=-406/107, 9-18=-317/179, 11-18=,-272/1105, 15-17=-222/710, 12-17=-784/3002, 12-15=-1243/430, 13-15=-321/1288 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf, h=25ft; B=45ft; L=24ft; eave=6ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live loan nonconcurrent with any other live loads. 6) . This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 376 lb uplift at joint 14, 3000 lb uplift at joint 27 and 1262 lb uplift at joint 26. 8) This truss has large uplift reaction(s) from gravity load case(s). Proper connection is required to secure truss against upward movement at the bearings. Building designer must provide for uplift reactions indicated. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813.247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FLOS6191 Job Truss - toss ype y 0133A AH13A Hip 1 1 Job Reference (optional) -9.4-0 O. IOU 4 NUV IJ LU I IVII I UK 6.00 12 5x7 = 5x10 4x6 5 1 2x4 11 4 3 1 2 31 30 29 3x6 = 4x5 = 6x8 = 7x10 \\ 6 4x5 = 3x5 = 7 8 0 25 5x6 = 26 27 6x8 = 4x8 = 3x4 II 3.00F1y Scale = 1:89.5 2x4 II 3x6 = 3x8 = 3x6 =2x4 II 6x8 = 9 10 11 12 3 13 4x5 = 14 15 W11 W1 4x5 O 0 0 e 16 0 AS 7 24 23 22 21 5 LQ v Id, WO M18SHS= 2x4 I I 6x8 = 8x8 I a 3x8 = 19 18 17 3x4 II 3x5 II 4x8 = 0442 9-0-0 94-0 1-0-0 45.0 13-0.0 16-2-0 19-7-8 26-1-13 32-8-3 39-2.8 43.8.8 45.10.0 50.8.0 1.4-0 2-11-0 8-7-0 3-2-0 35-8 8.8.5 6.6.5 6-0-5 2.1.8 4.10-0 0.1-12 Plate Offsets (X,Y)-- [4:0-3-0,Edgel [6:0-5-4,0-1-12] 1`15:0-5-8 0-2-0].[20:0-4-0,0-5-81,[21:0-5-4,Edgel,[26:0-6-0,0-3-01 [31:0-0-13,0-1-91 [31:0-2-0 0-1-41 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. In (loc) I/deft Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.82 Vert(LL) -0.51 22-24 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 1.00 Vert(CT) -0.94 22-24 >588 240 M18SHS 244/190 BCLL 0.0 ' Rep Stress Incr YES W13 0.99 Horz(CT) 0.48 17 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Matrix -MS Wind(LL) 0.47 22-24 >999 240 Weight: 323 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 *Except* TOP CHORD Structural wood sheathing directly applied or 2-3-7 oc purlins, except T1: 2x4 SP No.1 end verticals. BOT CHORD 2x4 SP No.2 *Except* BOT CHORD Rigid ceiling directly applied or 2-2-0 oc bracing. B3: 2x4 SP No.3, 136: 2x4 SP No.1 WEBS 1 Row at midpt 6-28, 11-21, 15-18 WEBS 2x4 SP No.3 2 Rows at 1/3 pts 5-30 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation auide. REACTIONS. (lb/size) 17=1547/0-4-0 (min. 0-1-13), 30=4437/0-8-0 (min. 0-5-4), 31=-2246/0-3-8 (min. O.1-8) Max Horz 31 =246(LC 7) Max Uplift17=-388(LC 8), 30=-1065(LC 8), 31=-2253(LC 18) - Max Grav 17=1 547(LC 1), 30=4437(LC 1), 31=489(LC 5) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-87/378, 2-3=-853/3521, 3-4=-764/3389, 4-5=-750/3482, 5-6=-11131364, 6-7=-2087/611, 7-8=-3341/899, 8-9=-4230/1109, 9-10=-4230/1109, 10-11 =-4230/1 109, 11-12=-3432l909, 12-35=-3432/909, 13-35=-3432/909, 13-14=-3420/902, 14-15=-1842/538, - 15-16=-1195/372,16-17=-1505/417 BOT CHORD 1-31=-325/93, 30-31=-443/66, 7-26=-1438l380, 25-26=-419/2146, 24-25=-692/3372, 23-24=-894/4255, 22-23=-894/4255, 21-22=-894/4255, 20-21=-497/1911, 14-20=-1413/402 1 WEBS 3-30=-319/179, 5-30=-4409/1089, 5-28=-210/1363,6-28=-14631343, 26-28=-207/1102, I� 6-26=-46612088, 7-25=-413/1794, 8-25=-823/284, 8-24=-231/1044, 10-24=-357/201, 11-22=0/274, 11-21=-974/233, 13-21=-316/198, 14-'21=-463/2000, 18-20=-330/1343, 15-20=-57312212, 15-18=-1739/493, 16-18=-291l1326, 2-31=-488/2088, 2-30=-2852/735 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=6ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 388 lb uplift at joint 17, 1065 lb uplift at joint 30 and 2253 lb uplift at joint 31. 8) This truss has large uplift reaction(s) from gravity load case(s). Proper connection is required to secure truss against upward movement at the bearings. Building designer must provide for uplift reactions indicated. LOAIJ CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS A1/. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Job IAH15A TfUSS rHip 0133A 9-4-0 6.00 12 5x5 = 4x5 = A 3x5 = 3x6 = 2x4 II 5x7 = 5x10 = Scale = 1:89.5 3x6 = 4x10 = 11 3.00 Fi2 11 3x5 II 4x5 = 3x4 I I 3x4 = 6x10 II 9-4-0 9-4-0 9-4-0 :0-0-4, LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/defl Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.86 Vert(LL) -0.44 14-15 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.94 Vert(CT) -0.85 14-15 >652 240 BCLL 0.0 " Rep Stress Incr YES WB 0.93 Horz(CT) 0.45 11 n/a n/a BCDL 10.0 Code FBC2017ITP12014 Matrix -MS Wind(LL) 0.41 14-15 >999 240 Weight: 302 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2'Except* TOP CHORD Structural wood sheathing directly applied, except end verticals. T3,T5,T4: 2x4 SP No.1 BOT CHORD Rigid ceiling directly applied or 2-2-0 oc bracing. Except: BOT CHORD 2x4 SP No.2 *Except* 1 Row at micipt 4-16 B1,B5: 2x4 SP No. 1, B3: 2x4 SP No.3 WEBS 1 Row at midpt 2-20, 3-18 WEBS 2x4 SP No.3 MiTek recommends that Stabilizers and required cross bracing WEDGE be installed during truss erection, in accordance with Stabilizer Left: 2x8 SP No.2 Installation quide. REACTIONS. (Ib/size) 11=1660/0-4-0 (min. 0-1-14), 20=2646/0-8-0 (min. 0-3-2), 1=-567/0-3-8 (min. 0-1-8) Max Horz 1=270(LC 7) Max Upliftl 1 =-420(LC 8), 20=-566(LC 8). 1=-697(LC 18) Max Grav11=1660(LC 1), 20=2646(LC 1), 1=95(LC 5) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-169/1231, 2-3=-1555/536, 3-4=-2389/731, 4-5=-4046/1101, 5-6=-4426/1171, 6-7=-4426/1171, 7-8=-4426/1171, 8-26=-3688/988,i9-26=-3688/988, 9-10=-1930/518, 10-11=-1607/443 BOT CHORD 1-20=-1033/178, 19-20=-298/921, 18-19=-298/921, 4-16=-1332/302, 15-16=-498/2483, 14-15=-852/4067, 13-14=-790/3727, 12-13=-383/1697 WEBS 2-20=-2924/696, 2-18=01795, 3-18=-1486/272, 16-16=-449/2169, 3-16=-289/1623, 4-15=-460/2054, 5-15=-637/249, 5-14=-70/514, 7-14=-419/237, 8-14=-193/838, 8-13=-828/319, 9-13=-568/2446, 9-12=-851/292, 16-12=-345/1731 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=6ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) . This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Bearing at joint(s) 11 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 420 lb uplift at joint 11, 566 lb uplift at joint 20 and 697 lb uplift at joint 1. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W SEARSS AV. TAMPA FL33618 PH:81 3-247-7400-FAX:81 3-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Job Truss cuss Type y 0133A AH17 Roof Special 1 1 ,",_Q T„�- C, o a-- „m-_ - _ Job Reference (optional) 6.00 12 ZO .. - JI 3x5 = 3x6 = 4x5 = 4x10 II 9-4-0 9-4-0 5x5 = 5x5 = 6x8 = 4x5 = L.i 7 a 21 04 °O 20 19 4x8 = 5x8 = 3x4 II 2x4 11 9 3x5 = 3x6 = LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft Ud TCLL 20.0 Plate Grip DOL 1.25 TC 0.95 Vert(LL) -0.35 17-18 >999 360 TCDL 7.0 Lumber DOL 1.25 BC 0.81 Vert(CT) -0.68 17-18 >751 240 BCLL 0.0 ' Rep Stress Incr YES W13 0.92 Horz(CT) 0.35 14 n/a n/a BCDL 10.0 Code FBC2017/TP12014 Matrix -MS Wind(LL) 0.33 17-18 >999 240 LUMBER- BRACING- 3.00112 Ulu. , U9 NOV 3 UW:0U:J0 ZUZU Y481 'vfimSMXILwLyig5(jyvuBD7Byxhl 50-8-0 6-10-0 Scale = 1:93.0 5x8 = 12 415 4 13 d) ob 6 i_ 9-4-0 PLATES GRIP MT20 .244/190 Weight: 328 lb FT = 20% TOP CHORD 2x4 SP No.2 Except TOP CHORD Structural wood sheathing directly applied, except end verticals. T1: 2x4 SP No.1 BOT CHORD Rigid ceiling directly applied or 4-3-1 oc bracing. BOT CHORD 2x4 SP No.2 *Except* WEBS 1 Row at midpt 4-23, 6-21, 7-20 B3: 2x4 SP No.3 MiTek recommends that Stabilizers and required cross bracing WEBS 2x4 SP No."Except" be installed during truss erection, in accordance with Stabilizer W8: 2x4 SP SP No.2 WEDGE Installation uide. Left: 2x8 SP No.2 REACTIONS. (lb/size) 14=1433/0-4-0 (min. 0-1-10), 23=2777/0-8-0 (min. 0-3-4), 1=-472/0-3-8 (min. 0-1-8) Max Horz 1=290(LC 7) Max Upliftl4=-360(LC 8), 23=-675(LC 8). 1=-609(LC 18) Max Grav 14=1433(LC 1), 23=2777(LC 1), 1=148(LG5) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-275/1313, 2-3=-291/1408, 3-4=-273/1528, 4-5:=-933/351, 5-6=-774/353, 6-7=-1580/577, 7-8=-3168/845, 8-9=-3293/873, 9-10=-3293/873, 10-11=-3293/873, 11-29=-2969/798, 12-29=-2969/798, 12-13=-1639/442, 13-14=-1380/383 BOT CHORD 1-23=-1130/250, 21-32=-203/1082, 32-33=-203/1082, 20-33=-203/1082, 8-18=-402/183, n /� 17-18=-596/3201, 16-17=-644/2989, 15-16=-331/1433 WEBS 2-23=-430/225, 4 23 2522/662, 4-21=-174/1225, 6,-21=-1004/265, 6-20=-439/1473, 7-20=-2791/706,18-20=-353/1953, 7-18=-537/2722. 9-17=-313/177, 11-17=-83/386, 11-16=-578/247, 12-16=-422/1894, 12-15=-689/262, 13-15=-290/1455 NOTES- 1) Unbalanced roof live loads have been considered for this design., 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=6ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) ' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 10.Opsf. 6) Bearing at joint(s) 14 considers parallel to grain value using ANSI77PI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing, plate capable of withstanding 360 lb uplift at joint 14, 675 lb uplift at joint 23 and 609 lb uplift at joint 1. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 o 1russ Truss Type ty y 0133A �AI-117A Hlp 1 1 [Job '^�Ps T F Reference o tional ampa, I, Pedro Jimenez Run: 8.130 s Nov 13 2017 Print: 8.130 a Nov 13 2017 MIT& Industries, Inc. Tue Nov 3 09:50:38 2020 Page 1 9-4-0 9.4.0 ID:bOydnXKyuk5YJMesbcV4zIHOV-rNkrpokSWv2H 4T004KEXndhhkONf,7�.1pCgKC3yMxh1 1 5-9-0 10-11-8 16-2-0 17-0 0 23-7$ 1 29.5.0 35-2-8 41-1 '0 46-1-4 50.8-0 5-9-0 5-2-80.10.0 8 5-9.8 ' 6-7-6 4-3.4 4.6.12 Scale = 1:89.5 2x4 11 5x5 = 3x5 = 3x6 = 6.00 F12 3x4 11 5x8 = 41 Gu 3.00112 14 3x6 = 4x8 = 3x4 II 5x5 4x5 = 3x4 // Sx10 II 6a-12 94-0 M-0 i1-4.0u 4.5-0 10-11-8 , 1121 2F{-7.8 29.5.0 35.2-8 41.10.0 50.8.0 1.4.0" 2-11.4 ' 8-0-e 5-2-8 7.5.8 5.9.8 5-9.8 8-10-0 0-1-12 Plate Offsets (X,Y)-- [1:0-0-4,Ed4el [1:0-0-12 Edgel [6:0-2-8 0-2-41, [11:0-6-0,0-2-81, [15:0-3-0 0-3-41, [19:0-2-12.0-2-81 LOADING (psf) SPACING- 2-0-0 CSJ. DEFL. in (loc) I/defl Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.77 Vert(LL) -0.35 17-18 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.88 Vert(CT) -0.66 18-19 >838 240 BCLL 0.0 Rep Stress Incr YES WI3 0.79 Horz(CT) 0.40 14 n/a rite BCDL 10.0 Code FBC2017/TP12014 Matrix -MS Wind(LL) 0.32 17-18 >999 240 Weight: 318 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 *Except* TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except T3,T4: 2x4 SP No.1 end verticals. BOT CHORD 2x4 SP No.2 *Except* BOT CHORD Rigid ceiling directly applied or 4-2-2 oc bracing. B1: 2x4 SP No. 1, 63: 2x4 SP No.3 WEBS 1 Row at midpt 12-14 WEBS 2x4 SP No.3 WEDGE MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Left: 2x8 SP No.2 1—Installation guide. REACTIONS. (lb/size) 23=2724/0-8-0 (min. 0-3-3), 14=1652/0-4-I) (min. 0-1-14), 1=-637/0-3-8 (min. 0-1-8) Max Horz 1=292(LC 7) Max Uplift23=-600(LC 8), 14=-417(LC 8), 1=-687(LC 18) Max Grav23=2724(LC 1), 14=1652(LC 1), 1=111(LC 5) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-210/1310, 2-3=-1602/472, 3-4=-1532/489, 4-5-' 2444/706, 5-6=-2406/758, 6-7=-3743/1014, 7-8=-3882/1033, 8-9=-3882/1033,:9-10=-3882/1033, 10-29=-3520/948, 11-29=-3520/948, 11-12=-2109/591 BOT CHORD 1-23=-1095/212, 22-23=-269/134, 21-22=-269/134, 18-19=-430/2254, 17-18=-725/3758, �s 16-17=-661/3540,15-16=-364/1901,14-15=-273/1266 WEBS 2-23=-2589/662, 2-21=-256/1533, 4-21=-1182/323, 19-21=-303/1456, 4-19=-131/934, y 6-19=-447/65, 6-18=-404/1937, 7-18=-536/218, 7-17=-25/262, 8-17=-271/151, 10-17=-100/500, 10-16=-696/274, 11-16=-477/2079, 11-15=-588/215, 12-15=-122/884, V 12-14=-2117/492 - NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=6ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) ` This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Bearing at joint(s) 14 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 600 lb uplift at joint 23, 417 lb uplift at joint 14 and 687 lb uplift at joint 1. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Job Truss runs Type-y 0133A AH19 Hip 1 1 was •r.n,,,eci oon.,, n..,e,.e, .. ...-- -• -------.. Job Reference (optional) _ .__ l'y7` O 9-4-0 ID:bOydnXKyuk8YJ6RXcsbc' 3 17-0_0 21-2A 25 4.0 30-3 4 35-2.8 13 5-5 13 4-2-0 4-2-0 ' 14 4-11 4 6.00 12 5x5 = 45 3x4 11 6x5 = 2x4 11 = 5x7 = mu. l ue Scale = 1:89,5 4 II 2 M O Qb 5 � cQ A -" 18 17 3.00 L12 13 4x5 US = 3x6 = 8x8 = 3x4 II 5x5 = 4x10 II D4 2 94-0 9-4.0 ,1-0-0„ 8-2.0 17.0.0 254.0 35-2-6 41-10.0 50-8-0 1.4.0' 6-" 8-10.0 8.4-0 9.10.8 8.7-8 8-10-0 0.1-12 Plate Offsets (X,Y)-- 11:0-0-0,1-2-31 11:0-0-12 Edgel 15.0-2-8 0-2-41,(8:0-2-8,0-3-01,[10:0-5-4.0-2-81 114:0-3-0 0-3-41 116:0-2-12 Edgel 118:0-2-0 0-3-41 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.95 Vert(LL) -0.43 15-16 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.98 Vert(CT) -0.94 15-16 >539 240 BCLL 0.0 Rep Stress Incr YES WI3 0.81 Horz(CT) 0,31 13 n/a n/a BCDL 10.0 Code FBC2017/TP12014 Matrix -MS Wind(LL) 0.23 15-16 >999 240 Weight: 318 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied, except end verticals. BOT CHORD 2x4 SP No.2 `Except' BOT CHORD Rigid ceiling directly applied or 2-2-0 oc bracing. 133: 2x4 SP No.3, 134: 2x4 SP No.1 WEBS 1 Row at midpt 4-20, 6-18, 11-13 WEBS 2x4 SP No.3 WEDGE MiTek recommends that Stabilizers and required cross bracing be installed duringtruss erection, in accordance with Stabilizer Left: 2x8 SP No.2 Installation uide REACTIONS. (lb/size) 20=2449/0-8-0 (min. 0-2-14), 13=1478/0-4-0 (min. 0-1-11), 1=-189/0-3-8 (min. 0-1-8) Max Horz 1=292(LC 7) Max Uplift20=-594(LC 8), 13=-371(LC 8), 1=-340(LC 18) Max Grav20=2449(LC 1), 13=1478(LC 1), 1=92(LC 5) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-179/831, 2-3=-190/908, 3-4=-172/1029, 4-5=-1158/403, 5-6=-977/400, 6-7=-2884/780, 7-8=-2912/775, 8-9=-2981/798, 9-26=-2971/792, 10-26=-2971/792, 10-11=-1844/523 BOT CHORD 1-20=-764/151, 20-27=-128/310, 19-27=-128/310, 19-28=-128/310, 18-28=-128/310, 7-16=-251/144, 15-16=-586/3074, 14-15=-325/1661', 13-14=-250/1120 WEBS 2-20=-363/208, 4-20=-2243/588, 4-1 8=-1 20/1024, 5-18=-38/300, 6-18=-17661405, 16-18=-356/1888, 6-16=-326/1810, 8-16=-266/115, 9-15=-350/195, 10-15=-360/1692, 10-14=-488/192,11-14=-102/757,11-13=-1864/427: NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf, h=25ft; B=45ft; L=24ft; eave=6ft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) ` This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 10.Opsf. 6) Bearing at joint(s) 13 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 594 lb uplift at joint 20, 371 lb uplift at joint 13 and 340 lb uplift at joint 1. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Job I toss ss ype y 0133A AH19A FHIp 1 1 JJob IA/PC Tomne FI Deri.n n..,e.,e- .. _ .. .__.__ Reference (optional) - Run: o.uu s rvov 1 a zui t vnni: d.i 3U s Nov 13 201 / MITeK Inaust ies, Inc. Tue Nov 3 09:50:40 2020 Page 1 9 a- 94-0 ID:bOydnXKyuk5YJ6RXesbcV4zlHOV-nmscEUmi2Xl EOdn8VMicCi YYise rW9RFyyMxgz �6 4 Al 13-9-0 19.0-0 25.7-8 33-2-8 39-10.0 45-1-4 50.8-0 4-6-4 ' 3-1-12 5.3-0 5-3-0 6-7-8 7-7-0 6-7-8 5 3-4 5 6 12 5x7 = 6.00 12 3x5 = 3x6 =2x4 II 5x7 = 6 7 o __ in Scale = 1:89.5 i� 20 _ ....... — 13 4x5 = 5x7 = 3x4 II 4x10 11 D$W 9.4-0 9A - 04-0n 8-2.0 PO 39 9-0-0 25-7-8 .0.8.4 6-7-8 3-208 3961-080 -4 304 7 0-1-12 Plate Offsets (X,Y)— [1:0-0-0,1-2-31 fl:0-0-12 Edoel [6:0-5-4 0-2-81,_[10:0-5-4,0-2-81,[15:0-2-8 0-3-01 fl8:0-2-4.0-3-01 [20:0-5-4 0-3-01 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.93 Vert(LL) -0.21 16-17 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.87 Vert(CT) -0.49 16-17 >999 240 BCLL 0.0 Rep Stress Incr YES Wb 0.76 Horz(CT) 0.25 13 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Matrix -MS Wind(LL) 0.19 16-17 >999 240 Weight: 304 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except BOT CHORD 2x4 SP No.2 end verticals. WEBS 2x4 SP No.3 BOT CHORD Rigid ceiling directly applied or 5-4-6 oc bracing. WEDGE Lek: 2x8 SP No.2 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation auide. REACTIONS. (lb/size) 20=2576/0-8-0 (min. 0-3-1), 13=1443/0-4-0 (min. 0-1-10), 1=-281/0-3-8 (min.0-1-8) Max Horz 1=314(LC 7) Max Uplift20=-661(LC 8), 13=-357(LC 8), 1=-382(LC 18) Max Grav20=2576(LC 1), 13=1443(LC 1), 1=136(LC 5) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. TOP CHORD 1-2=219/859, 2-3=-284/1214, 3-4=-703/199, 4-5=-643/212, 5-6=-1520/436,O" Y 6-7=-2513/670, 7-8=-2694/720, 8-9=-2694/720, 9-2Ei=-2683/714, 10-26=-2683/714, 10-11=-1906/538, 11-12=-1442/404, 12-13=-1396/373 BOT CHORD 1-20 708/178, 19 20=-1169/373, 18-19=-130/657,'17-18=-215/1339, 16-17=-393/2527, 15-16=-268/1705, 14-15=-208/1291 J WEBS 2-20=-448/178, 3-20=-1943/548, 3-19=-405/1924, 5-19=-1242/346, 5-18=-115/919, 6-18=-618/167, 6-17=-314/1570, 7-17=-560/257, 7-16=-53/263, 9-16=-406/226, 10- 1 6=-251/1344, 10-15=-333/132, 11-15=-73/560, 111-14=-850/249, 12-14=-267/1384 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf, BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=6ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5)' This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Bearing at joint(s) 13 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 661 lb uplift at joint 20, 357 lb uplift at joint 13 and 382 lb uplift at joint 1. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 P H:813-247-7400- FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 JOD Truss - russ Type ty y 0133A AH21 Hip 1 1 JJob - _ Reference o tional 9.4.0 - - -- s-4-0 hum ID:bOydnXKyuk5YJ6RXosbcV4zlHOV GyPMSpnKpgQrrYCzhCtx9PFCtx?CAY4AvZnOyMxgy 8 85 12-10.3 19-0-0 25 4-0 33-2-8 39 10-0 45-1-4 50-M 6-B•5 6-1-13 6 1-13 6.4-0 7-10-8 6-7-8 5-3-4 5.6.12 Scale = 1:89.5 5x8 = 4x5 = 3x6 =2x4 11 5x7 = 6.00 F12 5 6 A a is to lr — 12 12 4x5 US = 3x6 = 4x8 = 3x4 11 3x4 II = 4x10 II 2x4 II 9.5.t2 ,1-4-on '1-0-0" 0.1-12 9.4-0 8.2-0 12-10-3 , 6.8-0 4.8-3 19-0.0 6-1-13 25-4-0 6.4-0 33.2-8 7-10.8 39-10-0 6-7-8 9.4-0 45.14 50.8-0 5-3-4 5.6.12 Plate Offsets (X,Y)-- [1:0-0-0,1-2-31 [1:0-0-12 Edge] [5.0-6-0 0-2-81,[9:0-5-4,0-2-81,[14:0-2-8,0-3-01,[16:0-6-4,0-4-121 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.70 Vert(LL) -0.25 15-16 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 1.00 Vert(CT) -0.59 15-16 >860 240 BCLL 0.0 ' Rep Stress Incr YES WI3 0.87 Horz(CT) 0.31 12 n/a n/a BCDL 10.0 Code FBC2017ITP12014 Matrix -MS Wind(LL) 0.21 15-16 >999 240 Weight: 324 lb FT = 20% LUMBER - TOP CHORD 2x4 SP No2 BOT CHORD 2x4 SP No.2 `Except' 63: 2x4 SP No.3 WEBS 2x4 SP No.3 WEDGE Left: 2x8 SP No.2 BRACING - TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracingExce t WEBS REACTIONS. (lb/size) 21=2271/0-8-0 (min. 0-2-11), 12=1500/0-4-0 (min. 0-1-11), 1=-33/0-3-8 Max Horz 1=314(LC 7) Max Uplift2l=-557(LC 8), 12=-375(LC 8), 1=-196(LC 18) Max Grav21=2271(LC 1), 12=1500(LC 1), 1=67(LC 5) P 6-0-0 oc bracing: 1-21 2-2-0 oc bracing: 15-16. 1 Row at midpt 4-21. 5-18, 6-15 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. (min. 0-1-8) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown, TOP CHORD 1-2=-138/612, 2-3=-120/621, 3-4=-100/756, 4-5=-1340/466, 5-6=-2878/772, 6-7=-2887/782, 7-8=-2887/782, 8-27=-2875/776, 9-27=-2875/776, 9-10=-2004/569, 10-11 =-1 503/423, 11-12=-1453/391 BOT CHORD 1-21=-576/114, 20-21=-160/733, 19-20=-160/733, 19-28=-160/733, 18-28=-160/733, 6-16=-454/231, 15-16=-475/2903, 14-15=-289/1794, 13-14=-222/1347 WEBS 2-21=-352/218, 4-21=-2168/500, 4-18=-62/726, 5-1 8=-1 170/252, 16-18=-228/1375, 5-16=-406/2280, 8-15=-429/239, 9-15=-294/1473, 9-14=-366/139, 10-14=-83/598, 10-13=-893/263, 11-13=-287/1446 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; 'rCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=6ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 10.Opsf. 6) Bearing at joint(s) 12 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 557 lb uplift at joint 21, 375 lb uplift at joint 12 and 196 lb uplift at joint 1. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Job Truss I fuss I ype Q Vly 0133A AH21A Hip 1 1 Job Reference (optional) mu. ,uo rvuv JUOAU.4L LVLV ran i 9 4 g q.0 ID:bOydnXKyuk5YJ6RXcsbcV4zlHOV-kBzMf9nyaBYiTin9Fw0AhdnLDLRsMvJgeYKry xgx �6 4 8 6-0 14.9.0 21-0.0 27-7-8 31-2-8 37-10-0 44-1-4 50.8-0 4,_ 4 3.11-12 6-3-0 6-3-0 6 7 8 3-7-0 6-7.8 6 3 4 6.6-12 Scale = 1:89.7 5x7 = 6.00 12 3x5 = 2x4 II 3x6 = 5x7 = - 6 7 8 9 10 TA 3x5 5 5x6 • 3x6 G 5 T 11 4x5 i 4 3 4x5 Q ro 3 12 0 2x4 10 d 2 18 17 1 19 5x6 = 5x12 = 16 12 3 h 1 .'0 15 h 1 Ri c 21 3x6 %3x5 % 3x6 � 14 4x5 3.00 12 3x5 3x5 22 13 45 = Sx7 = 3x4 II 4x10 II tM`dR 9A-0 9.4-0 ,1-4-0�, 8.2.0 fifn0 14-9A 21-0.0 27-7-1 I.4-0 6-8-4 0-4�0 6-3-0 6.3.0 6-7-8 37-2-8 37.10.0 , 44-1-4 , 50.8.0 3-7.0 6-7.8 , 0-1-12 6.3-4 6.6-12 Plate Offsets (X,Y)- [1:0-0-0,1-2-31 11:0-0-12 Edge], [6:0-5-4 0-2-81,_L10:0-5-4,0-2-81,[11:0-3-0,0-3-01 [22:0-5-4 0-3-01 LOADING (psf) SPACING- 2-0-0 Cs' I. DEFL. in (loc) I/deft Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.86 Vert(LL) -0.18 17 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.58 Vert(CT) -0.36 16-17 >999 240 BCLL 0.0 ' Rep Stress Incr YES WS 0.75 Horz(CT) 0.23 13 n/a n/a BCDL 10.0 Code FBC2017/TP12014 Matrix -MS Wind(LL) 0.16 17 >999 240 Weight: 311 lb FT = 20% LUMBER- BRACING. TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied, except end verticals. BOT CHORD 2x4 SP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except: WEBS 2x4 SP No.3 6-0-0 oc bracing: 1-22 WEDGE 5-10-7 oc bracing: 21-22. Left: 2x8 SP No.2 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation ouide. REACTIONS. (lb/size) 22=2457/0-8-0 (min. 0-2-14), 13=1461/0-4-0 (min. 0-1-10), 1=-179/0-3-8 (min. 0-1-8) Max Horz 1=336(LC 7) Max Uplift22=-632(LC 8), 13=-362(LC 8), 1=-273(LC 18) MaxGrav22=2457(LC 1), 13=1461(LC 1), 1=110(LC 5) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less Except when shown. - TOP CHORD 1-2=-178/701, 2-3=-235/1022, 3-4=-1059/279, 4-5=..987/295, 5-6=-1761/491, 6-7=-2458/658, 7-8=-2527/678, 8-9=-2520/674, 9-10=-2520/674, 10-11=-2012/559, 11-12=-1622/441, 12-13=-1407/382 BOT CHORD 1-22=-609/149, 21-22=-984/327, 20-21=-172/943, 19-20=-156/960, 18-19=-219/1550, e v 17-18=-330/2468, 16-17=-217/1786, 15-16=-202/1459, 14-15=-219/1431 — = Q WEBS 2-22=-390/158, 3-22=-1895/546, 3-21=-404/1973, 5-21=-1090/328, 5-19=-56/751, 6-19=-428/124, 6-18=-234/1292, 7-18=-442/182, 8=17=-288/156, 10-17=-176/1091, 11-16=-33/466, 11-14=-773/251, 12-14=-277/1477 NOTES- 1) Unbalanced roof live loads have been considered for this design., 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.0psf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=6ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Bearing at joint(s) 13 considers parallel to grain value using ANSIfTPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 632 lb uplift at joint 22, 362 lb uplift at joint 13 and 273 lb uplift at joint 1. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Job Truss Truss ype ty y 0133A AH23 Hip 1 1 WPC T --- a FI Pedro iime�e- v .._ __ .. .__ Job Reference (optional) co 0 --•--••••-• •-- Run: o. 30 s Nuv w Gut t rnnt: o.iiJu S nov is zui r mi i eK maustnes, Inc. Tue Nov 3 09:50:44 2020 Pagel grt_ 9 4-0 ID:bOydnXKyuk5YJ6RXcsbcV4zlHOV-gX564rpC6loQl?xYNLRen2tin97EaJ> @m87eOjyMxgv -7-14 10-9-4 15.10 10 21-0-0'' 25-4 0 27-7-8 31-2-8 37-10-0 44 1 4 50 8-0 5 7-14 5-1-6 5 1-6 5-1-6 % 4-4-0 2-3-8 3-7-0 6 7-8 6 3 4 6 6-12 Scale = 1:89.7 5X7 = 45 = 2x4 II 3x6 = 5x7 = Gv Za ZZ 15 4x5 = 3x6 = 4x10 = 3x4 11 3x4 11 9-4-0 941.0 9-4-0 0 6 co 44 LOADING (psf) SPACING- 2-0-0 CSI. DEFL, in (loc) I/deft Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.79 Vert(LL) -0.21 19-20 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.59 Vert(CT) -0.39 18-19 >999 240 BCLL 0.0 ' Rep Stress Incr YES WI3 0.84 Horz(CT) 0.29 15 n/a n/a BCDL 10.0 Code FBC20171TPI2014 M6trix-MS Wind(LL) 0.18 19-20 >999 240 Weight: 354 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP 1'40.2 TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except BOT CHORD 2x4 SP No.2 *Except* end verticals. 133: 2x4 SP No.3 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except: WEBS 2x4 SP No.3 6-0-0 oc bracing: 1-26 WEDGE 9-10-15 oc bracing: 19-20. Left: 2x8 SP No.2 WEBS 1 Row at midpt 4-26, 6-23 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS. (lb/size) 26=2330/0-8-0 (min. 0-2-12), 15=1495/0-4-0 (min. 0-1-11), 1=-87/0-3-8 (min. 0-1-8) Max Horz 1=336(LC 7) Max Uplift26=-574(LC 8), 15=-374(LC 8), 1=-203(LC 18) Max Grav26=2330(LC 1), 15=1495(LC 1), 1=70(LC 5) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown, TOP CHORD 1-2=-132/628, 2-3=-158/738, 3-4=-147/851, 4-5=-1121/389, 5-6=-1344/501, 6-7=-2316/657, 7-8=-2564/695, 8-9=-2649/723, 9-1 0=-2640/71 8, 10-11=-2640/718, 11-12=-2078/582, 12-13=-1574/457, 13-14=-1666/444, 14-15=-1442/394 BOT CHORD 1-26=-620/111, 26-32=-140/300, 25-32=-140/300, 25-33=-140/300, 24-33=-140/300, V 24-34=-170/1018, 23-34=-170/1018, 7-21=-824/207, 20-21=-338/2346, 19-20=-356/2570, 18-19=-233/1846, 17-18=-215/1491, 16-17=-232/1463 WEBS 2-26=-344/198, 4-26=-2092/564, 4-24=-173/1104, 5-24=-683/212, 5-23=-10/424, 6-23=-1408/234, 21-23=-246/1654, 6-21=-309/2117, 7-20=-96/648, 8-20=-262/85, 9-19=-355/191, 11-19=-206/1167, 12-1 8=-41/493, 12-16=-797/261, 14-16=-294/1521 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; 'TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=6ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are 3x5 MT20 unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) ' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = I O.Opsf. 7) Bearing atjoint(s) 15 considers parallel to grain value using ANSIITPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 574 lb uplift at joint 26, 374 lb uplift at joint 15 and 203 lb uplift at joint 1. ALLTECH STRUCTURAL LOAD CASES) Standard ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Job NSS Truss Type Fly 0133A AH25 Piggyback Base 1 1 umc T.,..... FI P d 1 Job Reference (optional) a, , e ro imenez Run: 8.130 s Nov 13 2017 Print: 6.130 s Nov 13 2017 MITek Industries, Inc. Tue Nov 3 09:50:45 2020 Page 1 9-4.0 9.4-0 ID:bOydnXKyuk5YJ6RXcsbcV4zlHOV-8jfVHBgrt3wHK9Wkw2ytJFPu5ZR(Vki1r7otcw9yMxgu 8.9-9 13.0-10 , 19-3-11 25 4 0 32-5-3 39.6 5 44-11-7 50.8-0 6-9-9 6-3-1 6-3-1 6.0-5 7-1-3 7-1-3 6.5-1 5-8.9 Scale=1:89.5 3= 5x8 x5 4x5 = 3x6 = 5x7 = 6.00 F12 5 s a 4' LU I 12 3x5 = 3x6 = 4x8 = 3x4 II 3x4 II US 2x4 11 4x10 11 0442 9-0-0 9.4.0 1.4.0 6-2-0 13.0.10 19.3-11 25.4.0 29.5.0 34-5.11 39.6-5 44-11-7 50.6.0 1.4-06-84 4-10.10 6.3-1 6-0.5 4.1.0 5.0.11 5-0-11-8-9 0.1-12 Plate Offsets (X,Y)-- [1:0-0-0.1-2-31 [1:0-0-12 Ed -gel [5:0-6-0 0-2-81,[9:0-5-4,0-2-81,[18:0-6-0 0-3-81 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/defl Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.75 Vert(LL) -0.26 17 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.72 Vert(CT) -0.48 16-17 >999 240 BCLL 0.0 Rep Stress Incr YES WI3 0.84 Horz(CT) 0.34 12 n/a n/a BCDL 10.0 Code FBC2017/TP12014 Matrix -MS Wind(LL) 0.23 17 >999 240 Weight: 328 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except BOT CHORD 2x4 SP No.2 *Except` end verticals. 133: 2x4 SP No.3 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except: WEBS 2x4 SP No.3 6-0-0 oc bracing: 1-23 WEDGE 8-9-0 oc bracing: 17-18 Left: 2x8 SP No.2 8-4-15 oc bracing: 16-17. WEBS 1 Row at midpt 4-23, 5-20 MITek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation uide. REACTIONS. (lb/size) 23=227110-8-0 (min. 0-2-11), 12=1500/0-4-0 (min. 0-1-11), 1=-32/0-3-8 (min. 0-1-8) Max Horz 1=317(LC 7) Max Uplift23=-555(LC 8), 12=-376(LC 8), 1=-198(LC 18) Max Grav23=2271(LC 1), 12=1500(LC 1), 1=65(LC 5) �� ' FORCES. (lb) -Max. Comp./Max. Ten. . - All forces 250 (Ib) or less except when shown TOP CHORD 1-2=-135/618, 2-3=-111/615, 3-4=-91/752, 4-5=-1352/473. 5-6=-2714/745, ;� 6-7=-3369/830, 7-8=-3369/830, 8-29=-2530/695, 9-29=-2530/695, 9-10=-2024/576, 10-11=-1532/429, 11-12=-1454/392 ®roy BOT CHORD 1-23=-584/113, 22-23=-164/770, 21-22=-164/770, 21-30=-164/770, 20-30=-164/770, ' 00 6-18=-1054/291, 17-18=-456/2784, 16-17=-494/301;5, 15-16=-268/1803, 14-15=-281/1781, 13-14=-219/1372 WEBS 2-23=-356/222, 4-23=-2176/495; 4-20=-52/698, 5-20=-1170/249, 18-20=-234/1392, 5-18=-380/2151, 6-17=-122/940, 8-17=-84/813, 8-16=-1162/303, 9-16=-216/1204, 9-14=-363/124, 10-14=-82/582, 10-13=-871/267, 11;-13=-288/1460 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; VuIt=150mph (3-second gust) Vasd=116mph; TCDL=4.0psf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=6ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) . This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 10.Opsf. 6) Bearing at joint(s) 12 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 555 lb uplift at joint 23, 376 lb uplift at joint 12 and 198 lb uplift at joint 1. ALLTECH STRUCTURAL LOAD CASE(S) Standard ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:81 3-247-7400-FAX:81 3-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Job Truss Truss ype Qty ply 0133A B Common 7 1 Job Reference (optional) -• • -•••I— , --• •' ••••••••• ••'•- nul . V, wu a .— 10 Gu 1 I turn: O. IOU 51N Vv I O ZU I / W111 UK muuSlntj5, Inc. I Ua IVOV s uu;ou:So LUZU Y8 a l 9-4-0 ID:bOydnXKyuk5YJ6RXcsbcV4zIHOV-cwDtVXgTeN28yJ4wUmT6,%T�!bbymc2izUEScITcy xgt 7-10A 15-2.0 I 22.5-12 i 30.4.0 7-10-4 7.3-12 7.3-12 7-10A 44 = 6.00 r2 4 Scale=1:55.6 3x4 = 3x4 = 4x5 = 3x4 = 1.5x4 3x4 = 3x4 = 1.5x4 9A-0 94.0 1-0.01 B 0 10-8-0 19.8-0 28-8-0 30-0-0 2 1-0.0 0 9.0.0 9.0-0 9.0-0 0 01-0-0 Plate Offsets (X,Y)-- [1:0-0-12,Edgel, [7:0-0-12,Edgel LOADING (psf) SPACING- 2-0-0 CSI. DEFL, in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.58 Vert(LL) -0.30 9-12 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.79 Vert(CT) -0.42 9-12 >783 240 BCLL 0.0 ' Rep Stress Incr YES WI3 0.39 Horz(CT) 0.05 8 n/a n/a BCDL 10.0 Code FBC2017ITP12014 Matrix -MS Wind(LL) 0.08 9-12 >999 240 Weight: 157 lb FT = 20% LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 REACTIONS. (lb/size) 13=1122/0-8-0 (min. 0-1-8), 8=1122/0-8-0 (min. 0-1-8) Max Horz 13=167(LC 7) Max Upliftl3=-317(LC 8), 8=-278(LC 8) BRACING - TOP CHORD Structural wood sheathing directly applied or 4-0-10 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-13. 6-8 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation quide. FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less Except when shown. TOP CHORD 1-2=-398/14, 2-3=-1380/404, 34=-1283/428, 4-5=-1283/430, 5-6=-1380/406, , 6-3/47 BOT CHORD 1-13=0/30/335, 12-13=-292/1366, 12-20=-96/933, 11-20=-96l933, 10-11=-96/933, — 10-21=-96/933, 9-21=-96/933, 8-9=-296/1305, 7-8=0/335 _ WEBS 4-9=-99/542, 6-9=-297/249, 4-12=-96/542, 2-12=-297/246, 2-13=-1243/432, 6-8=-1243/401 1 NOTES- - 1) Unbalanced roof live loads have been considered for this design. ` 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph;,TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. - - II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left -and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) ` This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = I O.Opsf. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 317 lb uplift at joint 13 and 278 lb uplift at joint 8. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Job Truss Truss Type Qty 0133A IAIDC Tamn- CI DnA-.. Ilm,....... BH7 Hip Girder .. 1ply 1 2 Job Reference (optional) . ••_•.-•..--- ..-. .. -..,, ,.. ... ,....v�.... ,., �., �, m,Ivn nluuvmo',nw. luo rvuv uue.uu.�.a tutu rays I ID: bOydnXKyuk5YJ6RXcsbcV4zIHOV-1 Vu77Yt&iQjpnpV9u1 pU5aYOAofApxwQrP3xyMxgq 11-0 7-0-0 12.5.15 17_10.1 23-0-0 26-0-12 30-0A 3 11-4 3-0-12 5 5-15 5 4.3 5.5-15 3.0-12 3-11.4 Special Special Special 3x8 = 4x8 = Special Special ?1.5x4 II Special 3x4 = Special Special Special 4x4 = 6.00 12 3 22 23 4 24 25 5 6 26 27 7 �1 Scale = 1:50.2 1.5x4 D&x42 9 0 15 28 28 14 13 30 12 31 11 32 33 10 4x6 — 3x4 = Special Special 4x6 = Special 4x6 = 2x4 11 Special Special 3x8 —_ 4x6 = 5x10 11 Special :3x8 = Special Special 5x10 II Special 9-4-0 9-4-0 30-4-0 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.82 Vert(LL) -0.11 14 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.72 Vert(CT) -0.20 11-14 >999 240 BCLL 0.0 ' Rep Stress Incr NO WE3 0.29 Horz(CT) 0.03 9 n/a n/a BCDL 10.0 Code FBC2017/rP12014 Matrix -MS Wind(LL) 0.12 14 >999 240 Weight: 357 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD 2x6 SP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 2x4 SP No.3 WEDGE Left: 2x6 SP No.2, Right: 2x6 SP No.2 REACTIONS. (lb/size) 1=1719/0-8-0 (min, 0-1-8), 9=1716/0-8-0 (min. 0-1-8) Max Horz 1=-77(LC 23) Max Upliftl=-575(LC 8), 9=-572(LC 8) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. } TOP CHORD 1-2=-2187/798, 2-3=-2315/842, 3-22=-3354/1250, 22-23=-3354/1250, 4-23=-3354/1250, ` 4-24=-3354/1250, 24-25=-3354/1250, 5-25=-3354h250, 5-6=-3354/1250, 6-26=-2088/791, 26-27=-2088/791, 7-27=-2088/791, 7-8=-2303/834,i8-9=-2178/791 BOT CHORD 1-15=-609/1785, 15-28=-652/2064, 28-29=-652/2064, 14-29=-652/2064, 13-14=-1117/3362, - 13-30=-1117/3362, 12-30=-1117/3362, 12-31=-1117/3362, 11-31=-1117/3362, 11-32=-1117/3362, 32-33=-1117/3362, 10-33=-1117/3362, 9-10=-604/1778 WEBS 2-15=-144/415, 3-14=-547/1538, 4-14=-537/406, 6-11=0/442, 6-1 0=-1 531/549, -! 7-10=-1121612, 8-1 0=-1 43/412 NOTES- 1) 2-ply truss to be connected together with 10d (0.131°x311) nails as.follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 cc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-9-0 cc. Webs connected as follows: 2x4 -1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads notedias (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf, h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) . This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. d 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 575 lb uplift at joint 1 and 572 lb uplift at joint 9. Continued on page 2 ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813.247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Job Truss Trmuss ype1P= 0133A BH7 Hip Girdernce (optional) Tampa,Fl, Pedro Jimenez Run: 8.130 s Nov 13 2017 Print: 8.130 s Nov 13 2017 MiTek Industries, Inc. Tue Nov 3 09:50:49 2020 Page 2 ID:bOydnXKyuk5YJ6RXcsbcV4zlHOV-1 Vu?7YtLxlQjpnpV9u1 pU5aYOAoQF5GxwQrP3xyMxgq NOTES- 9) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 95 lb down and 113 lb up at 7-0-0, 107 lb down and 109 lb up at 9-0-12, 107 lb down and 109 lb up at 11-0-12, 95 lb down and 109 lb up at 13-0-12, 95 lb down and 109 lb up at 15-0-12, 95 lb down and 109 lb up at 15-3-4, 95 lb down and 109 lb up at 17-3-4, 107 lb down and 109 lb up at 19-3-4, and 107 Ibdown and 109 lb up at 21-34, and 95 lb down and 113 lb up at 23-4-0 on top chord, and 138 lb down and 60 lb up at 7-0-0, 51 lb down at 9-0-12, 51 lb down at 11-0-12, 51 lb down at 13-0-12, 51 lb down at 15-0-12, 51 lb down at 15-3-4, 51 lb down at 17-3-4, 51 lb down at 19-3-4, and 51 lb down at 21-34, and 138 lb down and 60 lb up at 23-3-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increase-1.25 Uniform Loads (plf) Vert: 1-3=-54, 3-7=-54, 7-9=-54, 1-9=-20 Concentrated Loads (lb) Vert:3=-68(B) 5=-68(B) 7=-68(B) 13=-33(B)15=-121(B) 110=-121(B) 22=-68(8) 23=-68(B) 24=-68(B) 25=-137(B) 26=-68(B) 27=-68(B) 28=-33(B) 29=-33(B) 30=-66(B)31=-33(B) 32=-33(B) 33=-33(B) ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 P H:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FLOS6191 Job Truss Truss Type Qty ply 0133A BH7A Half Hip Girder 1 I 2 Job Reference (optional) _• -- ------ ,.....�� ' ���m.wwvorvvv ,.a auu rvn, on nwumnoa mc. iue nuv uumw;.7l GuLU ra e. y�_ ID:bOydnXKyuk5YJ6RXcsbcV4zIHOV-ztOmYEubTvhR24zuHJ3HZ1MuNzUnjyVvrNWE;iJV8py xgo 11-4 7-0 0 12-6 14 18-0-0 23-5-2 29-0-0 3-11-4 3 0 12 5 6 14 5 5 2 5.5-2 5-6-14 Special Special Special Special Special 4x8 = Special Special 1.5x4 II Special 3x8 = 30 = Scale = 1:48.7 Special 1.5x4 II Special Special 3x5 = 15 -- .. -- 13-- ... 11 — 10 — 00 9 4x6 — 3x4 = 46 = 3x8 = 4x6 = 2x4 11 Special 3x10 = Special Special 2x4 II 5x1011 Special Special SpeciEil Special Special Special Special Special 9-4-0 9-4-0 LOADING (pso TCLL 20.0 TCDL 7.0 BCLL 0.0 BCDL 10.0 SPACING- 2-0-0 Plate Grip DOL 1.25 Lumber DOL 1.25 Rep Stress Incr NO Code FBC2017/TPI2014 CSI. TC 0.83 BC 0.72 WI3 0.50 Matrix -MS DEFL. in (loc) I/deft L/d Vert(LL) -0.10 13 >999 360 Vert(CT) -0.19 13-15 >999 240 Horz(CT) 0.03 9 n/a n/a Wind(LL) 0.12 13 >999 240 PLATES GRIP MT20 244/190 Weight: 357 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc puriins, except BOT CHORD 2x6 SP No.2 end verticals. WEBS 2x4 SP No.3 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEDGE Left: 2x6 SP No.2 REACTIONS. (lb/size) 9=1707/Mechanical, 1=1734/0-8-0 (min. 0-1-8) Max Horz 1=163(LC 5) Max Uplift9=-638(LC 5), 1=-575(LC 8) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-2210/797, 2-3=-2341/841, 3-19=-3422/1256, 19-20=-3422/1256, 4-20=-3422/1256, - 4-21=-3422/1256, 21-22=-3422/1256, 22-23=-3422/1256, 23-24=-3422/1256, 5-24=-3422/1256, 5-25=-2256/829, 6-25=-2256/829, 6-7=-2256/829, 7-26=-2256/829, _ 26-27=-2256/829, 8-27=-2256/829, 8-9=-1612/666 BOT CHORD 1-15=-720/1804, 15-28=-791/2088, 14-28=-791/2088, 14-29=-791/2088, 13-29=-791/2088, - 13-30=-1277/3385, 12-30=-1277/3385, 12-31=-127//3385, 11-31=-1277/3385, r, 11-32=-1277/3385, 32-33=-1277/3385, 10-33=-127//3385 r WEBS 2-15=-144/355, 3-13=-555/1572, 4-13=-548/417, 5-11=0/359, 5-1 0=-1 341/484, 7-10=-503/395, 8-10=-965/2630 ' NOTES- 1) 2-ply truss to be connected together with 1 Od (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-9-0 oc. Webs connected as follows: 2x4 -1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf, h=25ft; B=45ft; L=24ft; eave=oft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 4) Provide adequate drainage to prevent water ponding. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) ` This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Refer to girder(s) for truss to truss connections. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 638 lb uplift at joint 9 and 575 lb uplift at joint 1. Continued on page 2 ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 c s Truss Type y 0133A A FBH Half Hip Girder 1 Z ,lob Reference (optional) BPS, 1 ampa,Fl, Pedro Jimenez Run: 8.130 a Nov 13 2017 Print: 8.130 s Nov 13 2017 MiTek Industries, Inc. Tue Nov 3 09:50:51 2020 Pagge 2 ID:bOydnXKyuk5YJ6RXcsbcV4zlHOV-ztOmYEubTvhR24zuHJ3HZWruNzUn)yWDNkKW8pvmxga NOTES- 9) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 95 Ib down and 113 Ib up at 7-0-0, 107 Ib down and 109 Ib up at 9-0-12, 107 Ib down and 109 Ib up at 11-0-12, 95 Ib down and 109 lb up at 13-0-12, 95 Ib down and 109 Ib up at 15-0-12, 95 Ib down and 109 Ib up at 15-3-4, 106 Ib down and 109 Ib up at 17-3-4, 107 Ib down and 109 Ib up at 19-3-4, 107 Ibrdown and 109 Ib up at 21-3-4, 107 Ib down and 109 Ib up at 23-3-4, and 107 Ib down and 109 Ib up at 25-3-4, and 107 Ib down and 109 Ib up at 27-3-4 on top chord, and 138 Ib down and 60 Ib up at 7-0-0, 51 Ib down at 9-0-12, 51 Ib down at 11-0-12, 51 Ib down at 13-0-12, 51 Ib down at 15-0-12, 51 Ib down at 15-3-4, 51 Ib down at 1744, 51 Ib down at 19-3-4, 51 Ib down at 21-3-4, 51 Ib down at 23-3-4, and 51 Ib down at 25-3-4, and 51 Ib down at 27-3-4 on bottom chord. The design/selection of such connection device(s) Is the responsibility of others. LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Incre4e=1.25 Uniform Loads (plf) Vert: 1-3=-54, 3-8=-54, 1-9=-20 Concentrated Loads (lb) Vert: 3=-68(F) 6=-68(F) 15=-121(F) 7=-68(F) 10=-33(F) 12=-66(F) 19=-68(F) 20=-68(F) 21=-68(F) 22=-137(F) 24=-68(F) 25=-68(F) 26=-68(F) 27=-68(F) 28=-33(F) 29=-33(F) 30=-33(F) 31=-33(F) 32=-33(F) 33=-33(F) 34=-33(F) 35=-33(F) ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33616 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Job I russ Truss ype y 3 013A BH9 Hip 1 1 Job Reference (optional) ra a-� s 4-0 4-94 s-o-o ID:bOydnXKyuk5YJ6RXcsbcV4zIHOV-R4a81avEDDpHgEY4r0aW5kC9RN BNNc033gFy xgn 15-2.0 21-4-0 25-6-12 30-4 0 ' 4-9-0 1-2 6-2.0 6-2-0 4-2-12 4-9-0 4x8 = 3 1 91 1.5x4 II 4 00 4x8 = Scale = 1:51.2 3x4 = 2x4 4 3x4 = L 3x4 = 3x8 =3x4 = 3x4 = 2x4 Z�- 3x4 = 9.4.0 9.4.0 . 30.4-0 LOADING (psf) SPACING- 2-0-0 C51. DEFL. in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.43 Vert(LL) -0.08 13-14 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.56 Vert(CT) -0.16 13-14 >999 240 BCLL 0.0 Rep Stress Incr YES WI3 0.46 Horz(CT) 0.05 8 n/a n/a BCDL 10.0 Code FBC20171TPI2014 Miitrix-MS Wind(LL) 0.07 11 >999 240 Weight: 160 lb FT = 20% LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 REACTIONS. (lb/size) 14=1122/0-8-0 (min. 0-1-8), 8=1122/0-8-0, (min. 0-1-8) Max Horz 14=99(LC 7) Max Uplift14=-318(LC 8), 8=-278(LC 8) BRACING - TOP CHORD Structural wood sheathing directly applied or 4-3-1 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation quide. FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less Except when shown. TOP CHORD 2-3=-1435/388, 3-21=-1570/481, 4-21=-1570/481, 4-22=-1570/481, 5-22=-1570/481, 5-6=-1435/391 BOT CHORD 13-14=-286/1198, 12-13=-204/1239, 11-12=-204/1239, 10-11=-207/1239, 9-10=-207/1239, 8-9=-294/1198 WEBS 3-11=-128/483, 4-11=-382/212, 5-11=-125/483, 2-14=-1383/512, 6-8=-1383/482 NOTES- = 1) Unbalanced roof live loads have been considered for this design. ` 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat:, II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) • This truss has been designed for a live load of 20.Opsf on the bottom chord In all areas where a rectangle 3-6-0 tall by 2-0-0 wide Will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 318 lb uplift at joint 14 and 278 lb uplift at joint 8. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Job Truss Truss Type y 0133A BH9A Hip 1 1 Job Reference (optional - � --••••-• •-- —1.. o I— I. cv a ruui, o. wu s I— is cu a —I.. inuubmes mc, s ue rvov o ua:ou:oi d rage s ID:bOydnXKyuk5YJ6RXcsbcV4zIHOV-vG8Wzwws Wx8H07HOk51exkEynAdB. VYOpdDiyMxgm 9-4-0 4-9-4 9-0-0 15-2-0 21-4.0 29.0.0 4-9-4 42-12 ; 6-2-0 6-2-0 7-8-0 48 = 1.5x4 II 3 21 4 22 4x8 = F Scale = 1:49.4 7 I6. 3X4 — 2x4 3x4 = 3x4 = 3x8 = 3x4 = 1.5x4 II 3x12 II 9.4-0 9-4-0 LOADING (psf) SPACING- 2-0-0 CSt. DEFL. in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.83 Vert(LL) -0.12 8-10 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.76 Vert(CT) -0.21 8-10 >999 240 BCLL 0.0 • Rep Stress Incr YES W13 0.46 Horz(CT) 0.09 7 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Matrix -MS Wind(LL) 0.08 8-10 >999 240 Weight: 151 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins. BOT CHORD 2x4 SP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 2x4 MiTek recommends that Stabilizers and required cross bracing SLIDER Rightt 2x8 S SP No.2 2-6-0 be installed installed during truss erection, in accordance with Stabilizer I REACTIONS. (lb/size) 7=1017/Mechanical, 13=1129/0-8-0 (min. 0-1-8) Max Horz 13=93(LC 7) Max Uplift7=-252(LC 8), 13=-319(LC 8) f FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-251/0, 2-3=-1447/391, 3-21=-1592/481, 4-21=,•1592/481, 4-22=-1592/481, 5-22=-1592/481, 5-6=-1487/396, 6-7=-344/0 BOT CHORD 12-13=-313/1206, 11-12=-233/1249, 10-11=-233/1249, 9-10=-252/1259, 8-9=-252/1259, 7-8=-255/1255 — WEBS 3-10=-137/496, 4-10=-396/205, 5-10=-101/523, 2-13=-1392/515 NOTES- 1) Unbalanced roof live loads have been considered for this design. Q - 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.0psf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat.' ll; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live loan nonconcurrent with any other live loads. 5) ' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 252 lb uplift at joint 7 and 319 Ib uplift at joint 13. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL056191 oruss Truss Type�Ply 0133A �811411 Hip 1 1 Job Reference (optional) rro, i ampa,ri, rears Jimenez Run: UAW s NOV 13 2017 Print: 8.130 5 NOV 13 2017 MiTek Industries, Inc. Tue Nov 3 09:50:54 2020 Pagge 1 ID:bOydnXKyuk5YJGRXcsbcV4zIHOV NSiuAGxUlg3?vYiTyRc B9HXF$.WxwGjg3iYA18yMxgl 9.4.0 5.9.4 11-0-0 15-2-0 19 4-0 24.6-12 30.4-0 5-9.4 5 2-12 4-2.0 4.2-0 5 2.12 5.94 M if O 4x4 = 3x4 = 4x4 = Scale = 1:51.2 3x4 = 1.5x4 i 3x8 =: 3x4 = 3x4 = 3x8 = 1.5x4 ,z 3x4 = 9-4-0 94.0 30.4-0 LOADING (psf) SPACING- 2-0-0 CS1. DEFL. in (loc) I/defi Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.28 Vert(LL) -0.17 12-13 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC: 0.82 Vert(CT) -0.35 12-13 >955 240 BCLL 0.0 Rep Stress Incr YES WB 0.66 Horz(CT) 0.06 8 n/a n/a BCDL 10.0 Code FBC2017[rPI2014 M.Itrix-MS Wind(LL) 0.07 9-12 >999 240 Weight: 162 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 4-7-15 oc purlins. BOT CHORD 2x4 SP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 2x4 SP No.3 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS. (lb/size) 13=1122/0-8-0 (min. 0-1-8), 8=1122/0-8-0 (min. 0-1-8) Max Horz 13=-121(LC 6) Max Upliftl3=-318(LC 8), 8=-278(LC 8) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. ,1 TOP CHORD 1-2=-430/0, 2-3=-1366/378, 3-20=-1167/377, 4-20=1167/377, 4-21=-1167/378, 5-21 =-1 167/378, 5-6=-1366/380, 6-7=-430/0 BOT CHORD 1-13=0/367, 12-13=-306/1259, 11-12=-212/1251, 11-22=-212/1251, 10-22=-212/1251, 9-10=-212/1251, 8-9=-312/1259, 7-8=0/367 no% WEBS 3-12=-32/370, 5-9=-33/370, 2-13=-1299/561, 6-8=-1299/530 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; ;TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) - This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 10.Opsf. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 318 lb uplift at joint 13 and 278 lb uplift at joint 8. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247.7400-FAX:813.247.7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Iruss 33A IBH11A ]Hip 9-4-0 IU:DUyUfIAr YUKD T JbKACSUC V4ZIMU V-reUNUCXbVV9t$SAIUTVVU / Ujmgal bg7tjg04 5.9.4 11-0-0 15 2-0 1s 4 0 24-0.4 29-0-0 5.9-4 5-2-12 4-2-0 42-0 48 4 4 11-12 4x4 =i I 3x4 = 4x4 = Scale = 1:48.9 3x4 =1.Sx4 i x — 3x8 = 3x5 = 3X8 = 4x10 II 9-4-0 9-4-0 1 4 O1r8,0 11-0-0 19.4-0 29-0-0 1 4 00 40 9-4-0 + 8-40 9.8-0 Plate Offsets (X,Y)— r1:0-1-4.0-0-21 rB:0-8-0 0-0-21 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.60 Vert(LL) -0.17 9-11 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.83 Vert(CT) -0.34 11-13 >968 240 BCLL 0.0 ' Rep Stress Incr YES Wt3 0.67 Horz(CT) 0.07 8 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Matrix -MS Wind(LL) 0.09 9-11 >999 240 Weight: 158 lb FT = 20% LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 SLIDER Right 2x8 SP No.2 2-6-0 REACTIONS. (lb/size) 8=1018/Mechanical, 13=1128/0-8-0 (min. 0-1-8) Max Horz 13=115(LC 7) Max Uplift8=-252(LC 8), 13=-319(LC 8) BRACING - TOP CHORD Structural wood sheathing directly applied or 3-7-13 cc purlins BOT CHORD Rigid ceiling directly applied or 9-10-8 cc bracing. FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. TOP CHORD 1-2=425/0, 2-3=-1379/380, 3-21=-1179/378, 4-21=-1179/378, 4-22=-1183/383, 5-22=-11831383, 5-6=-1353/383, 6-7=-1499/438, 7-8=-513/0 BOT CHORD 1-13=0/363, 12-13=-333/1269, 11-12=-333/1269, 11-23=-240/1263, 10-23=-240/1263, 10-24=-240/1263, 9-24=-240/1263, 8-9=-314/1277 WEBS 3-11=-32/375, 5-9=-29/370, 2-13=-1315/562 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=oft; Cat. ll; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber ` DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 10.Opsf. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 252 lb uplift at joint 8 and 319 lb uplift at joint 13. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 IF I russ I Truss Type BH13 Hip 9 0 6-9-4 , 13-0-0 1740 23.6-12 30 4.0 6.9.4 6.2-12 4-0A ' 6-2-12 6-9-4 US = 6.00 12 4x4 = 4 S Scale = 1:52.6 d d 8 a9 1$ 3x4 = 1.5x4 II 3x4 = 3x4 = 3x8 = 1.5x4 II 1.5x4 - 3x4 = 1.5x4 -I;- 3x4 = 9.4.0 9.4-0 M1-0A 1r8.0 6-9.4 13.0.0 1'4-1 23-6-12 28.8.0 a0 4-0 2 - 0 0 0 5-1� 6-2-12 44-0 8-2-12 5-1-4 0.4 0 1-4-0 Plate Offsets (X,Y)— 11:0-1-0,Edgel, [4:0-5-4,0-2-01 [8:0-1-0 Edael LOADING (psf) SPACING- 2-0-0 CSI. DEFL, in (loc) I/deft Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.39 Vert(LL) -0.07 13-15 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 • BC 0.49 Vert(CT) -0.15 13-15 >999 240 BCLL 0.0 ' Rep Stress Incr YES WB 1.00 Horz(CT) 0.06 9 n/a n/a BCDL 10.0 Code FBC2017lrP12014 Matrix -MS Wind(LL) 0.06 13-15 >999 240 Weight: 173 lb FT = 20% LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 REACTIONS. (lb/size) 16=1122/0-8-0 (min. 0-1-8), 9=112210-8-0 (min. 0-1-8) Max Horz 16=143(LC 7) Max Uplift16=-318(LC 8), 9=-278(LC 8) BRACING - TOP CHORD Structural wood sheathing directly applied or 4-10-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less Except when shown. TOP CHORD 2-3=-12521359. 3-4=-1170/379, 4-5=-10511383, 5-6=-11711380, 6-7=-1253/359 BOT CHORD 15-16=-271/1324, 14-15=-272/1324, 13-14=-272/1324, 12-13=-133/1050, 11-12=-133/1050, 10-11=-277/1323, 9-10=-276/1324 WEBS 2-13=-340/159, 4-13=-17/312, 5-11=-18/313, 7-11=-339/164, 2-16=-1410/349, 7-9=-1409/321 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; ITCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) ' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 318 lb uplift at joint 16 and 278 lb uplift at joint 9. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 oruss Truss Type ty y 0133A �8111115 Hip 1 1 Job Reference (optional) vvra, i ampa,ri, recro aimenez j Run: 6.130 s Nov 13 2017 Print: 8.130 s Nov 13 2017 MiTek Industries, Inc. Tue Nov 3 09:50:56 2020 Page 1 9-40 ID:bOydnXKyuk5YJ6RXcsbcV4zlHOVGDxPOd_p3ZR097EBHhwL?4.R9vSs8lI JWOuvyMxgh 7-9-4 15 0 0 15-0-0 22-6-12 304.0 7-9-4 T0 2-12 .410 7-2-12 7-94 k s 4x10 = Scale = 1:55.6 6.00 12 3x5 = 1.5x4 11 3x4 = 3x8 = 1.5x4 11 1.5x4 �-, 3x5 = 1.5x4 i 3x4 = 94.0 9.4-0 i 1.4.01r8,0 7.94 , 15.0.0 15.4-0 22.8-12 30-4-0 28-&0 29.0.0 1-4-00-0.0 6-i-0 7.2-12 OA•0 7.2-12 6.1-4 0-4.01.4-0� Plate Offsets (X,Y)— [1:0-2-8,Edgel, r4:0-3-0,0-2-01, [5:0-0-0,0-1-121, [8.0-0-8,Edgel LOADING (psf) SPACING- 2-0-0 CcI. DEFL. in (loc) I/deft Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TG 0.59 Vert(LL) -0.08 10-12 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.59 Vert(CT) -0.18 10-12 >999 240 BCLL 0.0 Rep Stress Incr YES WI3 0.40 Horz(CT) 0.06 9 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Matrix -MS Wind(LL) 0.07 12-14 >999 240 Weight: 163 lb FT = 20% LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 REACTIONS. (lb/size) 15=1122/0-8-0 (min. 0-1-8), 9=1122/0-8-0 (min. 0-1-8) Max Horz 15=165(LC 7) Max Upliftl5=-317(LC 8), 9=-278(LC 8) BRACING - TOP CHORD Structural wood sheathing directly applied or 4-7-14 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-12, 7-12. 2-15, 7-9 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-307/91, 2-3=-11461337, 34=-1048/361, 4-5=4)47/376, 5-6=-1060/362, 6-7=-1151 /338, 7-8=-319/126 BOT CHORD 14-15=-267/1330, 13-14=-268/1329, 12-13=-268/1329, 11-12=-270/1322, 10-11=-270/1322, 9-10=-270/1323 WEBS 2-14=0/267, 2-12=-486/207, 4-12=-108/596, 7-12=-470/207, 7-10=0/269, 2-15=-1330/323, 7-9=-1312/289 NOTES- 1) Unbalanced roof live loads have been considered for this design.,' 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph;;TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=aft; Cat.- II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left end right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 317 lb uplift at joint 15 and 278 lb uplift at joint 9. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX: 813-247-7409 CA:9333 KELLY E LYONS, P.E. FLOS6191 truss Truss Type 0133A IC1 Common 1 1-8-0 94-0 w:DuyanxKy0K5YJbRXCSbcV4zlHOV-Cc39RJ7FLgp9dT9dJijO 5.3.8 9-3-0 1-8-0 ? 3-7-8 3-11-8 4x4 = 3 1.5x4 11 2x4 119A-0 9-4-0 9 Scale = 1:20.5 LOADING (psf) TCLL 20.0 TCDL 7.0 BCLL 0.0 ' BCDL 10.0 i-v-v v-v-u 3.r_tl SPACING- 2-0-0 CSI. Plate Grip DOL 1.25 TC; 0.25 Lumber DOL 1.25 BC' 0.30 Rep Stress Incr YES WB 0.05 Code FBC2017/TPI2014 Matrix -MS - 3-11-8 DEFL. in (loc) I/defi Ud Vert(LL) -0.02 6 >999 360 Vert(CT) -0.03 5-6 >999 240 Horz(CT) 0.00 5 n/a n/a Wind(LL) 0.01 5-6 >999 240 PLATES GRIP MT20 244/190 Weight: 35 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except WEBS 2x4 SP No.3 end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed duringuide. truss erection, in accordance with Stabilizer REACTIONS. (lb/size) 5=261/0-8-0 (min. 0-1-8), 7=412/0-8-0 (mini. 0-1-8) Installation Max Horz 7=78(LC 7) Max Uplift5=-60(LC 8), 7=-151(LC 8) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less e:,(cept when shown. WEBS 2-7=-255/158 % NOTES- 1 1) Unbalanced roof live loads have been considered for this design. ro , 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; 1 CDL=4.Opsf; BCDL=6.Opsf, h=25ft; B=45ft; L=24ft; eave=4ft; Cat. / II; Exp B; Encl., GCpi=0.18; MWFRS (directional); Cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load¢ nonconcurrent with any other live loads. 4) This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3 6-0 tall by 2-0-0 wide Y!✓ will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing platE: capable of withstanding 60 lb uplift at joint 5 and 151 lb uplift at ` joint 7. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAx:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#66191 o rruss cuss ypeQty y 0133A cJ1 Jack•Open 9-4-0 26 p 1 VJPS, 7empa,Fl, Pedro Jimenez ; Job Reference o tional Run: 8.130 s Nov 13 2017 Pdnt: 8.130 s Nov 19 2. M " Intl —le v !nc T,c ni ., a HE-- anon 2x4 = 0-4-0 ID:bOydnXKy0&VGRXcsbcV4zlHOV-87Bws71VtH3tsmJ?Q7lsVrczVPPXo12rUOU Jg AMx d 0-10.15 0.10-15 9-4-0 9-9-0 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft Ud TCLL 20.0 Plate Grip DOL 1.25 TC 0.01 Vert(LL) -0.00 6 >999 360 TCDL 7.0 Lumber DOL 1.25 BC 0.01 Vert(CT) -0.00 6 >999 240 BCLL 0.0 Rep Stress Incr YES WB 0.00 Horz(CT) -0.00 3 n/a n/a BCDL 10.0 Code FBC2017/TP12014 Matrix -MP Wind(LL) 0.00 6 >999 240 LUMBER - TOP CHORD 2x4 SP N0.2 BOT CHORD 2x4 SP No.2 REACTIONS. (lb/size) 1=33/Mechanical, 2=18/Mechanical, 3=15/Mechanical Max Horz2=17(LC 8) Max Upliftl=-13(LC 8), 2=-2(LC 8), 3=-2(LC 8) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. Scale = 1:6.8 PLATES GRIP MT20 244/190 Weight: 3 lb FT = 20% BRACING - TOP CHORD Structural wood sheathing directly applied or 0-10-15 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation quide. NOTES- 1) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; 1'CDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) ` This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate: capable of withstanding 13 lb uplift at joint 1, 2 lb uplift at joint 2 and 2 lb uplift at joint 3. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH: 813-247-7400- FAX: 813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 ° 1 russ Truss Type y 0133A CJ3 Jack -Open Q 1 WPS, Tempa,Fl. Pedro Jimenez Jo R ference (optional nun. o. IOU s ivuv Fa to 1 r Mini: a.i 3v s Mov 1J zu9 r MI rek Intlustnes, Inc. Tue Nov 3 09:51:04 2020 Page 1 ID: bOydnXKyuk5YJ6RXcsb cV i,UOV-4NIgGh2lPvJa64TOWoKbGiHoD4sGxC8MFzi5ZyMxgb T512 2-10-15 r 1;5.12 1-5-3 o_ o Lh 10-9-0 Scale=1:11.8 LOADING (psf) SPACING- 2-0-0 CSI. TCLL 20.0 Plate Grip DOL 1.25 TC 0.08 DEFL. Vert(LL) in 0.00 (loc) 5 I/deft >999 Ud 360 PLATES GRIP MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC? 0.08 Vert(CT) 0.00 5 >999 240 BCLL 0.0 ' Rep Stress Incr YES WB 0.02 Horz(CT) -0.01 3 n/a n/a BCDL 10.0 Code FBC2017ITP12014 Marix-MP Wind(LL) -0.00 5 >999 240 Weight: 10 lb FT = 20% LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP N0.2 WEBS 2x4 SP No.3 REACTIONS. (lb/size) 3=7/Mechanical, 4=-16/Mechanical, 5=219/0-3-8 (min. 0-1-8) Max Horz 5=55(LC 8) Max Uplift3=-20(LC 5), 4=-16(LC 1), 5=-85(LC 8) Max Grav3=17(LC 13), 4=12(LC 8), 5=219(LC 1) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. BRACING - TOP CHORD Structural wood sheathing directly applied or 2-10-15 oc pudins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation quide. NOTES. 1) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph;1'CDL=4.Opsf, BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. - II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left afid right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcVrrent with any other live loads. 3) ' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wider will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate, capable of withstanding 20 lb uplift at joint 3, 16 lb uplift at joint 4 and 85 lb uplift at joint 5. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Job Truss russ yps y )133A CJ3A Jack -Open 1 1 Job Reference o tional WPS, Tampa,Fl, Pedro Jimenez Run: 8.130 s Nav 13 Print: 8.130 a Nov 13 2017 MITek Industries, Inc. Tue Nov 3 09:51:05 2020 Page 1 0 ID:bOydn ulc�Y XcsboV4zlHOV-Zas2U13NACRRjE1a5FJZ7TET dRt70oHbvjFe?yMxg a An Mq- 4 3 9-4-0 II .9-4.0 10.9-0 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft Ud TCLL 20.0 Plate Grip DOL 1.25 TC` 0.05 Vert(LL) -0.00 4 >999 240 TCDL 7.0 Lumber DOL 1.25 BC: 0.03 Vert(CT) -0.00 4 >999 180 BCLL 0.0 ' Rep Stress Incr YES WB 0.00 Horz(CT) -0.00 2 n/a n/a BCDL 10.0 Code FBC2017/TP12014 Matrix -MR LUMBER- BRACING. TOP CHORD 2x4 SP No.2 TOP CHORD BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 BOT CHORD REACTIONS. (lb/size) 4=5310-8-0 (min. 0-1-8), 2=37/Mechanical, 3=16/Mechanical Max Horz 4=51(LC 8) Max Uplift2=-36(LC 8), 3=-6(LC 8) Max Grav4=53(LC 1), 2=39(LC 13), 3=27(LC 3) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less eaccept when shown. Scale: V=1' PLATES GRIP MT20 244/190 Weight: 6 lb FT = 20% Structural wood sheathing directly applied or 1-6-15 oc purlins except end verticals. Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. NOTES- 1) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; 7!CDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left end right exposed; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live loadlnonconcurrent with any other live loads. 3)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate: capable of withstanding 36 lb uplift at joint 2 and 6 lb uplift at joint 3. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 i russ Truss Type CJ5A I Jack -Open 9-4-0 ID:bOydnXKyuk5YJ6RXcst1RV i 3-6-15 3.6-15 1.5x4 Scale = 1:16.9 4 j-`qxd II 9-4-0 11-9-0 3-6-15 LOADING (psf) TCLL 20.0 TCDL 7.0 BCLL 0.0 ' BCDL 10.0 SPACING- 2-0-0 Plate Grip DOL 1.25 Lumber DOL 1.25 Rep Stress Incr YES Code FBC2017/TP12014 CS]. TC 0.17 BC; 0.12 WB 0.00 Matrix -MR DEFL. in Vert(LL) -0.01 Vert(CT) -0.01 Horz(CT) -0.01 Wind(LL) 0.01 (loc) I/deft Ud 3-4 >999 360 3-4 >999 240 2 n/a n/a 3-4 >999 240 PLATES GRIP MT20 244/190 Weight: 12 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 3-6-15 oc purlins, WEBS 2x4 SP No.3 BOT CHORD except end verticals. Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer REACTIONS. (lb/size) 4=125/0-8-0 (min. 0-1-8), 2=85/Mechanical, 3=40/Mechanical Installation ouide. Max Horz4=88(LC 8) Max Uplift2=-67(LC 8) Max Grav4=125(LC 1), 2=85(LC 13), 3=64(LC 3) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 s 2) This truss has been designed for a 10.0 psf bottom chord live load=nonconcurrent with any other live loads. 3) " This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate,: capable of withstanding 67 lb uplift at joint 2. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Job Truss utly Ply 0133A DGR Hip Girder 1 2 Job Reference (optional) WPS. Tamoa.Fl. Pedre.limanaz —1. o.1 uu s nuv w zu i r Print: a.iau s Nov is zui r MI I eK Inouslnes, Inc. Tue Nov 3 09:51:08 2020 Pagel 9-4-0 D:bOydnXKyuk5YJ6RXcsbcV4zlHOV-z9YB625GS7gObhm9nNsGI6sr�ItChPjHtxwEKyMxgX 3-4-4 6.5-0 7-5-0 10.5-12 13-10.0 3-4-4 3=0-12 1-a0 3-0.12 3-4-4 I 4x4 = 4x8 = Scale = 1:27.5 -' 2x4 11 3x8 = 3x4 = ' 2x4 11 9-4-0 WO M-4-0 II Special Special Special 9 3x10 II 9-4-0 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/defl L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC' 0.62 Vert(LL) -0.05 9-10 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.70 Vert(CT) -0.09 9-10 >999 240 MT18HS 244/190 BCLL 0.0 Rep Stress Incr NO WB 0.26 Horz(CT) 0.03 8 n/a n/a BCDL 10.0 Code FBC2017lrP12014 Matrix -MS Wind(LL) 0.05 9-10 >999 240 Weight: 206 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 5-0-8 oc purlins. BOT CHORD 2x6 SP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 2x4 SP No.3 SLIDER Left 2x8 SP No.2 2-6-0, Right 2x8 SP No.2 2-6-0 REACTIONS. (lb/size) 1=3347/0-8-0 (min. 0-2-0), 8=235610-8-0 (min. 0-1-8) Max Horz 1=71(LC 7) Max Upliftl=-963(LC 8), 8=-735(LC 8) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. D TOP CHORD 1-2=-1447/433, 2-3=-4155/1234, 3-4=-3600/1148, 4-5=-3278/1077, 5-6=-3548/1154, �4✓1 6-7=-3248/1058, 7-8=-900/296 1 1 1 BOT CHORD 1-25=-1000/3500, 12-25=-1000/3500, 12-26=-1000/3500, 26-27=-1000/3500, _ / 11-27=-1000/3500, 10-11=-958/3212, 10-28=-844/2i'12, 9-28=-844/2712, 8-9=-844/2712 /� WEBS 3-12=-181/838, 3-11=-370/77, 4-11=-418/1387, 5-11'=-5/354, 5-10=-469/1147, 6-10=-252/638 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-6-0 oc. Webs connected as follows: 2x4 -1 row at 0-9-0 oc. _ 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted i3s (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; T•CDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) Provide adequate drainage to prevent water ponding. 6) All plates are MT20 plates unless otherwise indicated. 7) This truss has been designed for a 10.0 psf bottom chord live load .nonconcurrent with any other live loads. 8)' This truss has been designed for a live load of 20.0psf on the bottom chord In all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. ii 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 963 lb uplift at joint 1 and 735 lb uplift at joint 8. 10) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 998 lb down and 272 lb up at 2-1-4. 998 lb down and 272 lb up at 4-1-4, and 997 lb down and 272 lb up at 6-1-4, and 1687 lb down and 658 lb up at 8-0-8 on bottom chord. The design/selection of such connection device(s)'is the responsibility of others. LOAD BASES) Standard ALLTECH STRUCTURAL Continued on page 2 ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 P H:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 jot) I russ cuss ype Qty y 0133A DGR Hip Girder 1 2 LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increase=1.25 Uniform Loads (plf) Vert: 1-4=-54, 4-5=-54, 5-8=-54, 13-19=-20 Concentrated Loads (lb) Vert: 25=-998(F) 26=-998(F) 27=-997(F) 28=-1687(F) r, ALLTECH STRUCTURAL 2121 VV EARSS AV. ENGINEERING FL33618 PH:813-247-7400-FAX:813-247-7409 KELLY E LYONS3P.E. FL#66191 Job russ I cuss Type Qty y I133A C Common 2 1 Job Reference (optional) WPS, Tampa,Fl, Pedro Jimenez 8.130 s Nov 13 2017 MiTek In�� I �'ps, Inc. Tue Nov 310:11:24 2020 Pa� ge 1 ,o� 9-4-0 ID:bOydnXKyuk5YJ6RXcsbcV4zlHOV-M5OuKrpO5l"gksOmhR1XDIC?PA6igiv3VFwryMxN; 1-8-0 3-7-8 P 3-7-8 4x4 = Scale = 1:20.5 3 IM 1.5x4 11 1.5x4 11 9.4-0 9-4-0 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC11 0.26 Vert(LL) -0.02 7 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC, 0.28 Vert(CT) -0.03 7 >999 240 BCLL 0.0 ' Rep Stress Incr NO W8 0.05 Horz(CT) 0.00 6 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Matrix -MS Wind(LL) 0.01 7 >999 240 Weight: 39 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD 2x4 SP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 2x4 SP No.3 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer REACTIONS. (lb/size) 8=392/0-8-0 (min. 0-1-8), 6=392/0-8-0 (min. 0-1-8) Installation guide. Max Horz 8=58(LC 7) Max Uplift8=-147(LC 8), 6=-92(LC 8) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. NOTES 1) Unbalanced roof live loads have been considered for this design.; / 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; 7CDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. - II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber 9!" DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load.nonconcurrent with any other live loads. 4) ' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing platE! capable of withstanding 100 lb uplift at joint(s) 6 except Qt=1li) . = 17 8=147. ti LOAD CASE(S) Standard ` ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 ` PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Joo IIruss I Truss yi 0133A DH7 Hip Girder 9-4-0 3x4 1.OX4 II 9-4-0 Special; 4)'c8 = Special Special 4x4 = uno — 3x4 = Special Special 3x4 = 9-4-0 Scale = 1:30.5 LOADING (psf) TCLL 20.0 TCDL 7.0 BCLL 0.0 ' BCDL 10.0 SPACING- 2-0-0 Plate Grip DOL 1.25 Lumber DOL 1.25 Rep Stress Incr NO Code FBC2017/TPI2014 CSI. TC' 0.16 BC 0.32 WB 0.32 Matrix -MS DEFL, in Vert(LL) -0.02 Vert(CT) -0.04 Horz(CT) 0.01 Wind(LL) 0.02 (loc) I/defl Ud 8-9 >999 360 8-9 >999 240 8 n/a n/a 10 >999 240 PLATES GRIP MT20 244/190 Weight: 86 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 5-11-4 cc purlins. WEBS 2x4 SP No.3 BOT CHORD Rigid ceiling directly applied or 10-0-0 cc bracing, Except: 6-0-0 cc bracing: 7-8. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer REACTIONS. (lb/size) 13=723/0-8-0 (min. 0-1-8), 8=868/0-8-0 (min. 0-1-8) Installationuide. Max Horz 13=-71(LC 6) Max Uplift13=-248(LC 8), 8=-284(LC 8) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-933/339, 2-3=-945/398, 3-17=-818/366, 4-17=-I318/366, 4-5=-947/382 BOT CHORD 11-12=-247/816, 10-11=-247/816, 10-18=-241/819, €I-18=-241/819, 8-9=-229/677 WEBS 1-13=-696/259, 1-12=-285/845, 5-8=-931/370 co co o NOTES- 1) Unbalanced roof live loads have been considered for this design. os J '- J IL r- ep 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; V < N J Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber a co DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. ILL E--2V Q-LLj 4) This truss has been designed fora 10.0 psf bottom chord live load.nonconcurrent with any other live loads. 5) ' This truss has been designed for a live load 20.Opsf CC Z ~ Q d CO of on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. II— a! > u- uj Q 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 248 lb uplift at joint 13 and 284 lb uplift at I W W Z 0) 00 joint 8. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 96 lb down and 113 lb up at 5-8-0, and 107lb down and 109 lb V O ►W— Z Q J up at 6-11-0, and 96 lb down a6d 113 lb up at 8-2-0 on top chord, and 138 lb down and 60 lb up at 5-8-0, and 51 lb down at 6-11-0, and 138 lb down and 60 lb up at 8-1-4 bottom J W'UJ n� } on chord. The design/selection of such connection device(s) is the responsibility of others. ' < , M'' , r ;' = :?. r,, ".•;J 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). �` t "' ' W. ,l LOAD CASE(S) Standard 7N'- `, N 0:4 1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increase=1.25 Uniform Loads (plf) • Vert: 1-3=-54, 3-4=-54, 4-7=-54, 13-14=-20 , . i;,• -i � =_ , Ct. � Concentrated Loads (lb) r' O ALL TECHUP, Vert: 3=-68(B) 4=-68(B) 10=-121(B) 9=-121(B) 17=-68(8) 18=-33(B) -i'' AL - rye`. `t.'•'i'� ��\:.��^'p/�" - KELLY E LYONS, P.1i -FL#:a6181 Job Truss I cuss I ype 1 0133A WPC Tmm�n FI Dorirn limena� EH7 Hip Girder .. _ ...-- 1 .. 1p'y 2 Job Reference (optional) II IDI tlR IIKS3J4w0DxIUUi111tlJ, II1 G, DI uwB bOydnXKyuk5YJ6RXcsbcV4zIHOV-rvuniy09mWM Special 4x8 =Special Special Special 1.5x4 11 Special Special Special 3x8 = Special 4x4 = Scale = 1:44.9 3X4 = 3x4 = 3X4 3X8 = 'X`r — 1.5X4 11 special 3x8 = 3x4 = 3x4 = Special Special Special Special Special Special 9-4-0 94-0 LOADING (psf) SPACING- 2-0-0 CSI. DEFL, in (loc) I/deft Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.17 Vert(LL) -0.05 11-13 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.35 Vert(CT) -0.09 11-13 >999 240 BCLL 0.0 ' Rep Stress Incr NO WB 0.18 Horz(CT) 0.03 9 n/a n/a BCDL 10.0 Code FBC2017ITP12014 Matrix -MS Wind(LL) 0.05 11-13 >999 240 Weight: 286 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except: 6-0-0 oc bracing: 1-15,8-9. REACTIONS. (lb/size) 15=1480/0-8-0 (min. 0-1-8), 9=1480/0-8-0 (min. 0-1-8) Max Horz 15=-77(LC 23) Max Upiiftl5=-538(LC 8), 9=491(LC 8) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less ei(cept when shown. TOP CHORD 2-3=-1985/726, 3-22=-2440/928, 4-22=-2440/928, 4,23=-2440/928, 23-24=-2440/928, 24-25=-2440/928, 25-26=-2440/928, 5-26=-2440/92f1, 5-27=-1763/684, 6-27=-1763/684, 6-7=-1985/732 BOT CHORD 14-15=-449/1357, 14-28=-535/1739, 13-28=-535/17;i9, 12-13=-809/2441, 12-29=-809/2441, 29-30=-809/2441, 11-30=-809/2441, 11-31=-809/2441, 10-31=-809/2441, 9-10=-463/1356 WEBS 2-14=-155/503, 3-13=-346/941, 4-13=-419/326, 5-1l'=0/291, 5-10=-923/342, 6-10=-135/587, 7-10=-155/505, 2-15=-18881757, 7-9=-1886/722 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. /17 Bottom chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to " ply connections have been provided to distribute only loads noted: s (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat.. 11; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 _. 5) Provide adequate drainage to prevent water ponding. - 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 538 lb uplift at joint 15 and 491 lb uplift at joint 9. 9) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 95 lb down and 113 lb up at 7-0.0, 107 lb down and 109 lb up at 9-0-12, 107 lb down and 109 Ib up at 11-0-12, 95 lb down and 109 lb up at 13-0-12, 95 lb down and 109 lb up at 13-7-4, 107 lb down and 109 lb up at 15-7-4, and 107 lb down and 109 lb up at 17-7-4, and 95 lb down and 113 lb up at 19-8-0 on top chord, and 138 lb down and 60 lb up at 7-0-0,,51 lb down at 9-0-12, 51 lb down at 11-0-12, 51 lb down at 13-0-12, 51 lb down at 13-7-4, 51 lb down at 15-7-4, and 51 lb down at 17-7-4, and 138 lb down and 60 lb up at 19-7-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. "ARJMW(06g9gndard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV..TAMPA FL33618 P H:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 33A I EH7 I Hip Girder 11 I 2 VPS, Tampa,Fl, Pedro Jimenez Run: 8.130 s Nov 13 2017 Print ..,—y,.l1—y— I w�nwuwYcinvv-iwnrywamvvivinOoJwwuLJXUVyIeMKI I t5ATJGVV/Uby LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increase=1.25 Uniform Loads (plf) Vert: 1-3=-54, 3-6=-54, 6-8=-54, 16-19=-20 Concentrated Loads (lb) i • Vert: 3=-68(F) 6=-68(F) 14=-121(F) 13=-33(F) 4=-68(F) 1i=-33(F) 5=-68(F) 10=-121(F) 22=-68(F) 24=-68(F) 25=-68(F) 27=-68(F) 28=-33(F) 29=-33(F) 30=-33(F) 31=-33(F) ALLTECH STRUCTURAL _ ENGINEERING, INC. 2121 W SEARSS AV. TAMPA FL33618 P H:813-247-7400- FAX: 813-247-7409 CA:9333 KELLY E LYONS, P.E. FLO56191 E �'U"'5 buss type 0133A IEH7A Hip Girder Special 4xB = Special Special Special Special ' 1.5x4 11 Special 3x8 = Special Special 4x4 = 3x4 1.Sx4 �i 3x4 = _'" ... 3x8 = — — 1.6A 11 opecia! 3x8 = 1.6x4 11 3x4 = = Special Special Special SpSpecial Special Special 9-4-D 9-4-0 Scale=1:44.2 LOADING (psf) SPACING- 2-0-0 CSL DEFL. in (loc) I/deft Ud PLATES GRIP TCLL 20.0 TCDL 7.0 Plate Grip DOL 1.25 TC 0.18 Vert(LL) -0.05 12-14 >999 360 MT20 244/190 Lumber DOL 1.25 BC: 0.38 Vert(CT) -0.10 12-14 >999 240 BCLL 0.0 Rep Stress Incr NO WB 0.21 Horz(CT) 0.04 9 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Majrix-MS Wind(LL) 0.06 12-14 >999 240 Weight: 285 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. WEBS 2x4 SP No.3 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS. (lb/size) 16=1495/0-8-0 (min. 0-1-8), 9=1404/0-8-0 (min. 0-1-8) Max Horz 16=71(LC 7) Max Upliftl6=-533(LC 8), 9=-463(LC 8) FORCES. (Ib) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-2097/756, 3-20=-2560/957, 4-20=-2560/957, 4-21=-2560/957, 21-22=-2560/957, 22-23=-2560/957, 5-23=-2560/957, 5-24=-1917/718„6-24=-1917/718, 6-7=-2138/772 BOT CHORD 15-16=-529/1515, 15-25=-592/1841, 14-25=-592/1841, 13-14=-856/2577, 12-13=-856/2577, 12-26=-856/2577, 11-26=-856/2577, 10-11=-548/1670, 9-10=-548/1670 WEBS 2-15=-151/450, 3-14=-346/967, 4-14=-419/326, 5-12=0/302, 5-11=-906/334, 6-11 =-1 59/670, 7-11=-176/360, 2-16=-1954/775, 7-9;=-2113/693 NOTES- 1) 2-ply truss to be connected together with 1 Od (0.131 "xY) nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted its (F) or (B), unless otherwise Indicated. 3) Unbalanced roof live loads have been considered for this design. ; 4) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6,Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live loadnonconcurrent with any other live loads. 7) • This truss has been designed for a live load of 20.Opsf on the bot'iom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 533 lb uplift at joint 16 and 463 lb uplift at joint 9. 9) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 95 lb down and 113 lb up at 7-0-0, 107 lb down and 109 lb up at 9-0-12, 107 lb down and 109 lb up at 11-0-12, 101 lb down and 109 lb up at 13-0-12, 106 lb dowq and 109 lb up at 13-7-4, 107 lb down and 109 lb up at 15-7-4, and 107 lb down and 109 lb up at 17-7-4, and 95 lb down and 113 lb up at 19-8-0 on top chord, and 138 lb down and 60 lb up al:1-0-0, 51 lb down at 9-0-12, 51 lb down at 11-0-12, 51 lb down at 13-0-12, 51 lb down at 13-7-4, 51 lb down at 15-7-4, and 51 lb down at 17-7-4, and 175 lb down and 60 lb up at 19-7-4 on bottom chord. The design/selection of such connection device(s) is the re;ponsibility of others. LOAD CASES) Standard Continued on page 2 ALLTECH STRUCTURAL Y,2 ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 P H:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Truss Truss TypeQty Py IJOD 0133A ,.�� r ___ �; �_�._ „_____ I EH7A Hip Girder 1 2 Job Reference (optional) • n mw J UifA �: 14 LULU rd e ID:bOydnXKyuk5YJ6RXcsbcV4zIHOV-oIvSN6Al2zaAJcUuuoDJ7ezhnIG._N�un IVUV 6_nFQVcQgcgpOESy xgR LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increase=1.25 Uniform Loads (plf) Vert: 1-3=-54, 3-6=-54, 6-8=-54, 9-17=-20 Concentrated Loads (lb) ! Vert: 3=-68(B) 6=-68(B) 13=-66(B) 15=-121(B) 14=-33(B) 11=-68(B) 12=-33(B) 5=-68(B) 11=-168(B) 20=-68(B) 22=-68(B) 23=-68(B) 24=-68(B) 25=-33(B) 26=-33(B) ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 IA./ PH:813-247-7400-FAX:813-247-7409 KELLY E LYONS, P.E. FL#56191 JIM Iruss 0133A EH9 94-0 daa n n n i Scale=1:44.9 4x4 = 3x4 = 4x4 = 3X4 = 1.5x4 3x8 = 3x4 = 3x8 = 1.S0 Q 3x4 = 9-4-0 9.4.0 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.20 Vert(LL) -0.09 9-11 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.62 Vert(CT) -0.20 9-11 >999 240 BCLL 0.0 ' Rep Stress Incr YES WB 0.40 Horz(CT) 0.04 8 n/a n/a BCDL 10.0 Code FBC2017/TP12014 Mafrix-MS Wind(LL) 0.05 9-11 >999 240 Weight: 139 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 5-2-7 oc purlins. BOT CHORD 2x4 SP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 2x4 SP No.3 MiTek recommends that Stabilizers and required cross bracing be installed installed during truss erection, in accordance with Stabilizer I REACTIONS. (lb/size) 12=987/0-8-0 (min. 0-1-8), 8=987/0-8-0 (min. 0-1-8) Max Harz 12=-99(LC 6) Max Upliftl2=-285(LC 8), 8=-244(LC 8) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1187/321, 3-19=-1020/318, 4-19=-1020/318, 4-20=-1020/321, 5-20=-1020/321, 5-6=-1187/323 BOT CHORD 11-12=-240/1018, 10-11=-212/1138, 9-10=-212/113f1, 8-9=-248/1018 WEBS 3-11=-22/324, 5-9=-23/324, 2-12=-1194/450, 6-8=-14l94/420 NOTES• J 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult- 150mph (3 second gust) Vasd=116mph; TCDL=4.0psf, BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Gat. 11; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding, t 4) This truss has been designed for a 10.0 psf bottom chord live load! nonconcurrent with any other live loads. 5) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide. will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 285 lb uplift at joint 12 and 244 lb uplift at"--. joint 8. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FLOS6191 Job Truss I russ Type Qty P ly 0133A EH9A Hip 1 1 IIIIDC Tomnn Cl On A... Ii........... Job Reference (optional) nlu. •uv ava.uLlo tutu ra tf 1 940 ID:bOydnXKyukSYJeRXcsbcV4zIHOV-khlDonCHaagtYwNhF3019141n,B1421g4G�1SLIX,sy xgP 49-0 900 1340 17-8-0 2144 2540 4-9-4 42-12 4.40 4 4-0 3.8-4 3-11-12 4x4 = 3x4 = 4x4 = Scale=1:42.8 1.5x4 i 3x8 = ..4 — 3x8 = 3x4 = 3x4 = 9-4-0 9-4-0 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.32 Vert(LL) -0.08 9-11 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC' 0.65 Vert(CT) -0.18 9-11 >999 240 BCLL 0.0 ' Rep Stress Incr YES WB 0.46 Horz(CT) 0.04 8 n/a n/a BCDL 10.0 Code FBC20171TPI2014 Matrix -MS Wind(LL) 0.05 9-11 >999 240 Weight: 136 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 5-2-6 oc purlins, except BOT CHORD 2x4 SP No.2 end verticals. WEBS 2x4 SP No.3 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be Installed during truss erection, in accordance with Stabilizer Installationuide. REACTIONS. (lb/size) 12=988/0-8-0 (min. 0-1-8), 8=876/0-8-0 (ruin. 0-1-8) Max Horz 12=119(LC 7) Max Upliftl2=-285(LC 8), 8=-217(LC 8) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1189/321, 3-16=-1022/319, 4-16=-1022/319, 4=5=-1027/320, 5-6=-1188/326 BOT CHORD 11-12=-245/1020, 10-11=-243/1143, 9-10=-243/1141, 8-9=-248/1037 WEBS 3-11=-24/325, 5-9=-32/332, 2-12=-1194/451, 6-8=-1106/319 NOTES- �/1 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; 17CDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left a(id right exposed; end vertical left and right exposed; Lumber (� DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) ' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing platy: capable of withstanding 285 lb uplift at joint 12 and 217 lb uplift at joint 8. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Truss I rugs I ype City Piy IJ00 0133A EH11 Hip 2 1 WPC T.- M P-1— IIMe.,e. _ __ _ _ Job Reference (optional) 111 UJII IOJ, II Ili. 1 UV INUV J Ut%Z) I. 1 / LULU ra e 1 9�_o i ID:bOydnXKyuk5YJ6RXcsbcV4zlHOV-Ctbb77CvLuykA4yuomXOc?kT✓giopiP2Mndu3Jy xg0 I 5-94 , 11.0.0 15-8A 20-10.12 , 26.8.0 5.94 5 2-12 4-8.0 5-2-12 5-9.4 i 4x8 = 4x4 = 3 18 19 4 Scale = 1:45.8 3x4 = 1.bx4 i 3x4 = aX14 — 3x8 = 1.5x4 - 3x4 = 9-4-0 94-0 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC•' 0.26 Vert(LL) -0.19 10-11 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.84 Vert(CT) -0.38 10-11 >754 240 BCLL 0.0 ' Rep Stress Incr YES WB 0.54 Horz(CT) 0.04 7 n/a n/a BCDL 10.0 Code FBC20171TP12014 Matrix -MS Wind(LL) 0.05 8-10 >999 240 Weight: 142 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 5-3-2 oc purling. BOT CHORD 2x4 SP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 2x4 SP No.3 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer REACTIONS. (lb/size) 11=987l0-8-0 (min. 0-1-8), 7=987/0-8-0 (min. 0-1-8) Installationuide. Max Horz 11=121(LC 7) Max Upliftl1=-284(LC 8), 7=-244(LC 8) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less e),;cept when shown. TOP CHORD 1-2=-452/0, 2-3=-1099/316, 3-18=-925/322, 18-19=-t125/322, 4-19=-925/322, 4-5=-1099/317, 5-6=-451/0 i'- BOT CHORD 1-11=0/387, 10-11=-257/1057, 9-10=-109/925, 8-9=-109/925, 7-8=-263/1057, 6-7=0l386 WEBS 3-10=0/277, 4-8=0/277, 2-11=-1049/514, 5-7=-1050/483 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. y II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left arid right exposed ; end vertical left and right exposed; Lumber - `t7- DOL=1.60 plate grip DOL=1.60 - 3) Provide adequate drainage to prevent water ponding. - 4) This truss has been designed for a 10.0 psf bottom chord live load,nonconcurrent with any other live loads. 5)' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate) capable of withstanding 284 lb uplift at joint 11 and 244 lb uplift at joint 7. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC, 2121 W BEARSS AV. TAMPA FL33g9B PH:813-247-7400-FAX; 813-247.,74 AQ KELLY E Lyoms P., JOo Iruss 0133A EH15 9�-0 6-� .v.uvT-' ­ 1Y n.... r�nwuuVYu nv V-IJYaGU I UAU%,YUIICA-fIVIULUt;L nfjAWVVT'4 13-Q•0 13.N 19-10-12 26.8.0 ( 6 9 4 Ii1;05 6-2-12 6.9-4 4x4 = 6.00 r12 4x4 = 8 3x4 = 1.5x4 i 1.5x4 I I 5x6 = 1.5x4 11 1.5x4 _ 3x4 = 3x4 = Scale = 1:48.6 9-4.0 9A-0 , 1-0.01.BA ' 1-0-0 0'-4�0 6-9-0 , 5-1.4 � 13.0-0 3-& 19.10.12 26-8-0 25.0-0 2 0 Plate Offsets (X Y)-- fl:0-2-0 Edgel f8:0-2-0 Edgel f12.0-2-4 fi-2=12 0-3-01. 6.2-12 b1.4 14.0 LOADING (psf) SPACING- 2-0-0 CSI. DEFL, in (loc) I/dell Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC' 0.38 Vert(LL) -0.05 12-13 >999 360 MT20 244/190 TCDL 7.0• Lumber DOL 1.25 SC; 0.44 Vert(CT) -0.11 12-13 >999 240 BCLL 0.0 ' Rep Stress Incr YES WB 0.83 Horz(CT) 0.04 9 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Matrix -MS Wind(LL) 0.05 12-13 >999 240 Weight: 151 lb FT = 20% LUMBER - TOP CHORD 2x4 SP No.2 SOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 REACTIONS. (lb/size) 14=987/0-8-0 (min. 0-1-8), 9=987/0-8-0 (min. 0-1-8) Max Horz 14=143(LC 7) Max Upiiftl4=-284(LC 8), 9=-244(LC 8) BRACING. TOP CHORD Structural wood sheathing directly applied or 5-7-6 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-988/292, 3-4=-906/312, 4-5=-815/324, 5-6=-907/312, 6-7=-989/292 ' BOT CHORD 13-14=-219/1111, 12-13=-220/1111, 11-12=-74/815, 10-11=-224/1110, 9-10=-224/1111 WEBS 2-12=-382/167, 4-12=-42/300, 5-11=-42/300, 7-11= 381/172, 2-14=-1177/293, 7-9=-1176/265 NOTES- v 1 1) Unbalanced roof live loads have been considered for this design. ^� 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 - 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load:nonconcurrent with any other live loads. 5) ` This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plat(( capable of withstanding 284 lb uplift at joint 14 and 244 lb uplift at joint 9. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENG2121 W EARISS AV, ANEERING(MPA FL33618 PH:813-247.7400-FAX:813-247-7409 33 KELLY E LYONS3P.E. FL#56191 Job Truss Truss I ype Qty Ply 0133A ER Jada0pen 74 1 1/IIDS Tamno GI Derirn limnne- - , .-. _ "__ .. ._ __._ _ . Job Reference (optional) - ------ 9-4A �.u.i. v. i V V a ivVv I V CV i I ruin. o, IJV 3 1vuV 1 U / NII I eK I11UU5[f185 mc. lue rvov s uy:oi:zu zuzu Nage i ID:bOydnXKyuk5YJ6RXcsbcV4zIH0 = jd9FodpKJ1XhfUv45EdMykfUn09QV2krYgeyMxgL 7-0.0 7-0-0 Scale = 1:22.9 0 �I 15II 9-4-0 12-9-8 1-4-0 0-4-0 5.4-0 LOADING (psf) SPACING- 2-0-0 CSI, DEFL. in (loc) I/detl L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC' 0.34 Vert(LL) -0.03 4-5 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.26 Vert(CT) -0.06 4-5 >999 240 BCLL 0.0 ' Rep Stress Incr YES WB 0.07 Horz(CT) -0.04 3 n/a n/a BCDL 10.0 Code FBC2017/rP12014 Matrix -MP Wind(LL) 0.03 4-5 >999 240 Weight: 23 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD 2x4 SP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 2x4 SP No.3 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer REACTIONS. (lb/size) 3=122/Mechanical, 4=53/Mechanical, 5=338/0-8-0 (min. 0-1-8) Installationuide. Max Horz 5=133(LC 8) Max Uplift3=-94(LC 8), 5=-90(LC 8) Max Grav3=123(LC 13), 4=91(LC 3), 5=338(LC 1) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. WEBS 2-5=-298/233 NOTES- 1) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cal. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber <!0" DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live loa6nonconcurrent with any other live loads. /. 3) ' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate: capable of withstanding 94 lb uplift at joint 3 and 90 lb uplift at joint 5. - LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC, 2121 W BEARSS AV, TAMP,A P09619 PH:813-247-74AA-FAXi313-g47. 7499 CAt9333 KELLY E LY046, P.E, iFLL#,,§§y191 Job Truss Truss City Ply 0133A EJ7A Jack -Open 11 1 Job Reference (optional) �I 94-0 ,.ui i. v. wv o i�w w cv a rnm. o. ,uu s rvuv rvu i nn uiuusmns, If1G, I Ua IVOV 3 Uy:OI:YI LULU ra e i ID:bOydnXKyuk5YJ6RXcsbcV4zIH0 j GQ07SAehG?1I'KnrveM3gPldseHOb6C4y xgK 2-a0 7-a0 2-a0 5 a0 9-4-0 10-6-10 12-9.8 1-4-0 0-8-0 --- 5-0-0 LOADING (psf) TCLL 20.0 TCDL 7.0 BCLL 0.0 BCDL 10.0 SPACING- 2-0-0 Plate Grip DOL 1.25 Lumber DOL 1.25 Rep Stress Incr YES Code FBC2017/TP12014 CSi. TC, 0.28 BC; 0.30 WB 0.06 Matrix -MP DEFL. in (loc) I/defl Vert(LL) -0.04 5-6 >999 Vert(CT) -0.07 5-6 >818 Horz(CT) -0.00 3 n/a Wind(LL) 0.00 5-6 >999 Ud 360 240 n/a 240 LUMBER. TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 BRACING - TOP CHORD BOT CHORD REACTIONS. (lb/size) 3=110/Mechanical, 6=361/0-8-0 (min. 0-1-11), 4=43/Mechanical Max Horz6=133(LC 8) Max Uplift3=-82(LC 8), 6=-106(LC 8) Max Grav3=11O(LC 1), 6=361(LC 1), 4=83(LC 3) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. WEBS 2-6=-315/172 Scale=1:21.9 PLATES GRIP MT20 244/190 Weight: 31 lb FT = 20% Structural wood sheathing directly applied or 6-0-0 oc purlins Rigid ceiling directly applied or 6-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. NOTES- 1) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; 1'CDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) ` This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 82 lb uplift at joint 3 and 106 lb uplift at joint 6. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS. P.E. FI-mig1 ERB (Jack -Open I1 I 1 9-4-0 5 8-0 IU:OVyunAKyUKbYJbKXC8dC1Ti 5.8 i -0 2x4 Scale = 1:21.9 4-0 61x-01 i 12-9--9- 8 5.8-0 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC' 0.43 Vert(LL) -0.04 3-4 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC' 0.33 Vert(CT) -0.09 3-4 >716 240 BCLL 0.0 ' Rep Stress Incr YES WE 0.00 Horz(CT) -0.05 2 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Matrix -MR Wind(LL) 0.06 3-4 >999 240 Weight: 19 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 5-8-0 oc purlins, except BOT CHORD 2x4 SP No.2 end verticals. WEBS 2x4 SP No.3 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer REACTIONS. (lb/size) 4=202/0-8-0 (min. 0-1-8), 2=137/Mechanicail, 3=65/Mechanical Installation cluide. Max Horz4=128(LC 8) Max Uplift4=-7(LC 8), 2=-102(LC 8) Max Grav4=202(LC 1), 2=137(LC 1), 3=103(LC 3) FORCES. (Ib) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- a, 1) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; 1'CDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=oft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber - DOL=1.60 plate grip DOL=1.60 - sy 2) This truss has been designed for a 10.0 psf bottom chord live load, nonconcurrent with any other live loads. i J 3) • This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide 1 will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 7 lb uplift at joint 4 and 102 lb uplift at joint 2. LOAD CASE(S) Standard - ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 russ I cuss I ype Qpy My IJob 0133A ERC Jack -Open 1 1 M..T......... CI I].. J... I:.......-- Job Reference o tional • - - -- - �.ru, v, lw v nv• w cv I r r uul. �. GV 11 IVII l tlp 11 WllJ01tlJ IIIG. I Utl IVOV 3 Utl{Dl [ZZ LULU ra 9 7 9-4-0 ID:bOydnXKyuk5YJ6RXcsb OV-Zr0U2rG290a1Grrr6K6ZJ2RJxT9SU4ZnV2KfkWy xgJ 1 2-6-() 5-6-0 2-0-0 3-2-0 t 1.5X4 6 1.5x4 II 9A-0 5 5x5 = 3.00 12 a 10-1-2 12-9.8 Scale = 1:23.0 LOADING (psf) SPACING- 2-0-0 CSh DEFL. in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC' 0.29 Vert(LL) -0.06 5 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.38 Vert(CT) -0.11 4-5 >621 240 BCLL 0.0 Rep Stress Incr YES WS 0.03 Horz(CT) -0.05 3 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Matrix -MP Wind(LL) 0.09 5 >737 240 Weight: 22 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 BOT CHORD REACTIONS. (lb/size) 6=202/Mechanical, 3=119/Mechanical, 4=8i3/Mechanical Max Horz6=128(LC 8) Max Uplift6=-7(LC 8), 3=-77(LC 8), 4=-16(LC 8) Max Grav6=202(LC 1). 3=119(LC 1), 4=94(LC 3) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. Structural wood sheathing directly applied or 5-8-0 oc purlins, except end verticals. Rigid ceiling directly applied or 6-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. NOTES- 1) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; iCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=oft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load, nonconcurrent with any other live loads. 3) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 7 lb uplift at joint 6, 77 lb uplift at joint 3 and 16 lb uplift at joint 4. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 ERD I Roof Spedal 11 I 1 s Nov 132017 9-4-0 6 1.5x4 II 9-4-0 1.5X4 II 3x4 = _ 5 5x10 = 3.00 12 10-1-2 11-11-11 LOADING (psf) SPACING- 2-0-0 CSI- DEFL. in (loc) I/deft Ud TCLL 20.0 Plate Grip DOL 1.25 TC' 0.60 Vert(LL) -0.11 5 >602 360 TCDL 7.0 Lumber DOL 1.25 BC' 0.11 Vert(CT) -0.19 5 >341 240 BCLL 0.0 Rep Stress Incr YES WB 0.04 Horz(CT) 0.21 3 n/a n/a BCDL 10.0 Code FBC2017frP12014 Matrix -MP Wind(LL) 0.17 5 >396 240 LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 BOT CHORD REACTIONS. (lb/size) 6=202/Mechanical, 3=171/Mechanical, 4=34/Mechanical Max Harz6=-89(LC 6) Max Uplift6=-95(LC 4), 3=-116(LC 5) Max Grav6=202(LC 1), 3=171(LC 1), 4=62(LC 3) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. Scale=1:19.2 PLATES GRIP MT20 2441190 Weight: 29 lb FT = 20% Structural wood sheathing directly applied or 5-8-0 oc purlins, except end verticals. Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation quide. NOTES- 1) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber DOL=1,60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live Ioad!nonconcurrent with any other live loads. — 4) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Refer to girder(s) for truss to truss connections. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plates capable of withstanding 95 lb uplift at joint 6 and 116 lb uplift at joint 3. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERINGINC. 2121 W EARSS AV. TA$MPA FL33618 PH:813-247-7400-FAX:813-247-7409 33 KELLY E LYONS3P.E. FL#56191 o russ Truss ype y 0133A �E,17E Roof Special 1 1 InICc T�..in� CI o..a... r...,...,.- Job Reference (optional) r�a — �inio ez Run: n.130 s Nov 13 2u17 Print: 8.130 a Novi 7 MITek Industries Inc. Tue Nov 3 09:51:24 2020 Page 1 -0 ID:bOydnXKyuk5YJ6RXcsbcV4zIHOVI� TWlh2dve Ejk910TXjDHumyzB4zMpmpPyMxgH i 2-6-0 3-8-0 5-8-0 2-6-0 1-2-0 2-0-0 8 1.5x4 II 9-4-0 6.00 12 7 5x10 = 3.00 12 10-1-2 11-10.8 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/defl Ud TCLL 20.0 Plate Grip DOL 1.25 TC 0.05 Vert(LL) -0.01 6-7 >999 360 TCDL 7.0 Lumber DOL 1.25 BC 0.13 Vert(CT) -0.01 6-7 >999 240 BCLL 0.0 ' Rep Stress Incr YES WB 0.08 Horz(CT) -0.00 4 n/a n/a BCDL 10.0 Code FBC2017ITP12014 Matrix -MP Wind(LL) 0.00 7 >999 240 LUMBER- BRACING. TOP CHORD 2x4 SP No.2 TOP CHORD BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 BOT CHORD REACTIONS. (lb/size) 8=201/Mechanical, 4=52/Mechanical, 6= 1 512/Mechanical Max Horz 8=86(LC 8) Max Uplift8=-69(LC 4), 4=-38(LC 8), 6=-36(LC 5) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less ei"cept when shown. Scale = 1:18.2 PLATES GRIP MT20 2441190 Weight: 31 lb FT = 20% Structural wood sheathing directly applied or 5-8-0 oc purlins, except end verticals. Rigid ceiling directly applied or 6-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. NOTES- 1) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; 1'CDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load; nonconcurrent with any other live loads. 4) ` This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Refer to girder(s) for truss to truss connections. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate: capable of withstanding 69 lb uplift at joint 8, 38 lb uplift at joint 4 and 36 lb uplift at joint 6. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Job cuss Truss Type Qty y 0133A HR Diagonal Hip Girder 11 1 7JobReference %�/PIZ Tom-, M DoM. me-s, (optional) • -� • -•• rw• � • ••- - - .-.�. Run. a. ou ti NOv -13 20l r Print U30 5 Nov lJ 2U1 / MI I eH In Ine. I Ue NOV 3 U9:51:25 2020 Pa� ge 1 9-4-o ID:bOydnXKyuk5YJ6RXcsbcV4zlHOV-zQ4chsJwSLzc SgGxh3pYgBThQbEBOZJLryMxgG 5-1-3 9-9.5 5-1-3 4-8-1 3x4 11 Scale = 1:25.2 Special opeclai 1.5x411 special 4 3x8 11 Special Special 3x6 = Special 9-4-0 LOADING (psf) SPACING- 2-0-0 CS1. DEFL. in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC ' 0.34 Vert(LL) -0.03 7 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.36 Vert(CT) -0.05 7 >999 240 BCLL 0.0 Rep Stress Incr NO WR 0.07 Horz(CT) -0.02 3 n/a n/a BCDL 10.0 Code FBC2017frP12014 Matrix -MS Wind(LL) 0.03 7 >999 240 Weight: 47 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except BOT CHORD 2x4 SP No.2 end verticals. WEBS 2x4 SP No.3 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEDGE MiTek recommends that Stabilizers and required cross bracing Left: Zx6 SP No.2 be Installed during truss erection, in accordance with Stabilizer REACTIONS. (lb/size) 3=113/Mechanical, 5=116/Mechanical, 1=3135/0-9-2 (min. 0-1-8) Installation guide. Max Horz 1=158(LC 7) Max Uplift3=-72(LC 5), 5=-40(LC 5). 1=-173(LC 8) Max Grav3=113(LC 1). 5=140(LC 30), 1=416(LC 29) ` FORCES. (lb) -Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-11=-267/130 NOTES- 1) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.0psf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=oft; Cat. „ p) II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left ar,ld right exposed; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live loadnonconcurrent with any other live loads. j 3) ` This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members.t 4) Refer to girder(s) for truss to truss connections. v 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 72 lb uplift at joint 3, 40 lb uplift at joir� 5 and 173 lb uplift at joint 1. 6) Gap between inside of top chord bearing and first diagonal or vertical web shall not exceed 0.500in. 7) Hanger(s) or other connection device(s) shall be provided sufficierit to support concentrated load(s) 55 lb down and 11 lb up at 1-4-9, 55 lb down and 11 lb up at 1-4-9, 57 lb down and 43 lb up at 4-2-8, 57 lb down and 43 lb up at 4-2-8, and 81 lb down and 67 lb up at 7-0-7, and 81 lb down and 67 lb up at 7-0-7 on top chord, and 6 Ib',down and 7 lb up at 1-4-9, 6 lb down and 7 lb up at 1-4-9. 44 lb up at 4-2-8, 44 lb up at 4-2-8, and 15 lb down and 2 lb up at 7-0-7, and 15 lb down and 2 lb up at 7-0-7 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASES) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increae=1.25 Uniform Loads (plf) Vert: 1-3=-54, 4-7=-20 Concentrated Loads (lb) Vert: 9=-13(F=-6, B=-6) 11=45(F=22, B=22) 13=59(F=29, EI=29) 14=4(F=2, B=2) ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247.7409 CA:9333 KELLY E LYONS, P.E. FL#56191 uds buss Iype y 0133A LHJ713 I Diagonal Hip Girder, 1 1 �jcbReferencet WPS, Tampe,Fl, Pedro Jimenez ional Run: 8.130 s Nov 13 2017 Print: 8.130 s Nov 13 2017 MiTek Inuss���� ID:bOydnXKyuk5YJ6RXcsbcV4z-IHOV-voBN5YKB_ZM 9-4-0 5-1-3 9-9-5 5-1-3 4 8 1 3x4 11 3 - Special 4.24 F12 Special 12 Special 4x4 Special 2 11 Special Special 10 W1 1 13 14 15 5 2x4 = Special 6 Special Special 4 1.5x4 -::r- Special Special 3x6 — Special 9-4-0 Scale = 1:25.2 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft Ud PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC' 0.44 Vert(LL) -0.08 5-6 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC 0.43 Vert(CT) -0.14 5-6 >668 240 BCLL 0.0 Rep Stress Incr NO WB 0.12 Horz(CT) -0.00 5 n/a n/a BCDL 10.0 Code FBC2017ITP12014 Matrix -MS Wind(LL) -0.03 5-6 >999 240 Weight: 47 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 BOT CHORD REACTIONS. (lb/size) 3=100/Mechanical, 5=163/Mechanical, 6=4:?7/0-11-5 (min. 0-1-5) Max Horz6=158(LC 7) Max Uplift3=-76(LC 5), 5=-39(LC 5), 6=-208(LC 8) Max Grav3=100(LC 1), 5=180(LC 30), 6=447(LC 29) ; FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. BOT CHORD 6-14=-220/278, 14-15=-220/278, 5-15=-220/278 WEBS 2-6=-405/318 Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. Rigid ceiling directly applied or 6-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation quide. NOTES- 1) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left arid right exposed; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load, nonconcurrent with any other live loads. 3) ` This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 5 except Qt=1b) 6=208. 6) Gap between inside of top chord bearing and first diagonal or verti6al web shall not exceed 0.500in. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 55 lb down and 11 lb up at 1-4-9, 55 lb down and 11 lb up at 1-4-9. 66 lb down and 43 lb up at 4-2-f1, 57 lb down and 43 lb up at 4-2-8, and 88 lb down and 83 lb up a 7-0-7, and 81 lb down and 67 lb up at 7-0-7 on top chord, and 28 I!) down and 7 lb up at 1-4-9, 28 lb down and 7 lb up at 1-4-9, 7 lb down and 14 lb up at 4-2-8, 44 lb up at 4-2-8, and 22 lb down at 7-0-7, and 15 lb down and 2 lb up at 7-0-7 on bottom chord. The design/selection of such connection device(s) is the responsibility 6f others. 8) In the LOAD CASE(S) section, loads applied to the face of the trusts are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increase=1.25 Uniform Loads (plf) Vert: 1-3=-54, 4-7=-20 Concentrated Loads (lb) Vert: 11=22(F) 12=-9(B) 13=-13(F=-6, B=-6) 14=27(F=29, Ei=-2) 15=-9(F=2, B=-11) ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 P H:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 I russ K I Common 12- 0 Iv7f/� :ouyanxKyuKSYJbRxcsbCV4zIHOV-O?IlJuLpIGLB_m[ZJhLguEpw 6-9-8 13-7-0 6 9.8 6-9-8 4x4 = 2 3x10 11 1.5x4 11 sxv = 12-M 3x101 �10-0 Scale = 1:25.0 1 4 0 1,5 8 6.9-8 12-1-8 12r3-0 13 7.0 , 1-4-0 0.1-8 5 4 0 5-4-0 0-1-8 1-4 0 Plate Offsets (X,Y)--[1:0-1-4,0-0-21,[1:0-0-4.1-2-111 [3:0-14 0-0-21i[3:0-0-4.1-2-111 LOADING (psf) SPACING- 2-0-0 CS1. DEFL. in (loc) I/defl L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC 0.28 Vert(LL) -0.02 4-9 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC, 0.25 Vert(CT) -0.03 4-9 >999 240 BCLL 0.0 • Rep Stress Incr YES WB 0.07 Horz(CT) 0.00 3 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Matrix -MS Wind(LL) -0.02 5 >999 240 Weight: 55 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD 2x4 SP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 2x4 SP No.3 WEDGE MITek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Left: 2x8 SP No.2, Right: 2x8 SP No.2 Installation quide. REACTIONS. (lb/size) 1=503/0-3-0 (min. 0-1-8), 3=503/0-3-0 (mlrt. 0-1-8) Max Horz 1=-75(LC 6) Max Uplift1=-125(LC 8), 3=-125(LC 8) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less eiccept when shown. TOP CHORD 1-2=-433/131, 2-3=-433/131 BOT CHORD 1-4=-26/326, 3-4=-26/326 NOTES- 1)Unbalanced roof live loads have been considered for this design. , 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.0psf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber . , DOL=1.60 plate grip DOL=1.60 -_a'0 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 1 4) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide . Will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing platE: capable of withstanding 100 lb uplift at joint(s) except Gt=1b) 1=125, 3=125. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FLOS6191 Jon IIruss 12-0.0 5 5 e ID:bOydnXKyuk5YJSRXcsboV4zlHOV-s6J7WEMRWalF c BVI'Cdj FJ� 10-11-0 5-5-8 4x4 = 3X8 I I 12-0-0 IF 3x8 160.0 Scale: 1/2"=l' LOADING (psf) SPACING- 2-0-0 CS' DEFL. in floc) I/deft Ud PLATES GRIP TCLL 20.0 TCDL 7.0 Plate Grip DOL 1.25 TC 0.23 Vert(LL) -0.02 6-9 >999 360 MT20 244/190 Lumber DOL 1.25 BC 0.23 Vert(CT) -0.04 6-9 >999 240 BCLL 0.0 Rep Stress Incr YES WB 0.08 Horz(CT) 0.02 1 n/a n/a BCDL 10.0 Code FBC2017ITP12014 Matrix -MS Wind(LL) 0.02 6-9 >999 240 Weight: 55 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD 2x4 SP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 2x4 SP No.3 SLIDER Left 2x8 SP No.2 2-6-0, Right 2x8 SP No.2 2-6-0 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer REACTIONS. (lb/size) 1=404/0-3-0 (min. 0-1-8), 5=404/0-3-0 (min. 0-1-8) Installationuide. Max Horz 1=-60(LC 6) Max Upliftl=-100(LC 8), 5=-100(LC 8) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-400/139, 3-4=-400/139 BOT CHORD 1-6=-57/358, 5-6=-57/358 NOTES- 1) Unbalanced roof live loads have been considered for this design. n� 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; T'CDL=4.0psf; BCD L=6.Opsf; h=25ft; B=45ft; L=24ft; eave=oft; Cat. 11; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left ar`,id right exposed; end vertical left and right exposed; Lumber r DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live loadnonconcurrent with any other live loads. 1 This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at Joints) except Ot=lb) 1=100, 5=100. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENG2121 W B ARISS AV. ANEERING�MPA FL33618 PH:813-247-7400-FAX:813-247.7409 KELLY E LYONS, P.E. FL#56191 Job russ russ ype y 0133A KGE GABLE 1 1 Job Reference o tional WPS, Tampa,Fl, Pedro Jimenez Run: 8.130 s Nov 13 2017 Pont- 8.130 s Nov 13 2017 MiTek Industrje��I . Tue Nov 3 09:51:31 2020 Page 1 12_00 ID:bOydnXKyuk5YJ6RXcsbcV4zIHOV-oaRuxwNh2BjIrE•�aldAlgByJsw5GW5876ay0eYVyMxgP cec 6-9-8 i 6--9-89-8 4x4 = 3X4 = 3x10 II 3x10 II 12-0-0 12-0-0 1 4 0 1,5r8 6-9-8 12-1-8 1 13 7-0 1 4-0 0-1-8 5-4-0 5-4-0 0 1 8 1 Scale = 1:25.9 Plate Offsets (X,Y)-- f1:0-1-4,0-0-21 11.0-0-4 1-2-1 11 f3:0-1-4 0-0-21'[3:0-0-4.1-2-111 40 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TCi 0.28 Vert(LL) -0.02 4-17 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC' 0.25 Vert(CT) -0.03 4-17 >999 240 BCLL 0.0 Rep Stress Incr YES WB; 0.07 Horz(CT) 0.00 3 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Matrix -MS Wind(LL) -0.02 13 >999 240 Weight: 65 lb FT = 20% LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 OTHERS 2x4 SP No.3 WEDGE Left: 2x8 SP No.2, Right: 2x8 SP No.2 REACTIONS. (lb/size) 1=503/0-3-0 (min. 0-1-8), 3=503/0-3-0 (min. 0-1-8) Max Horz 1=-75(LC 6) Max Upliftl=-125(LC 8), 3=-125(LC 8) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (Ib) or less except when shown. TOP CHORD 1-2=-433/131, 2-3=-433/131 BOT CHORD 1-4=-26/326, 3-4=-26/326 BRACING - TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation ouide. NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf, BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left acid right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For Studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/ TPI 1. 4) All plates are 1.5x4 MT20 unless otherwise indicated. 5) Gable studs spaced at 2-0-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load;nonconcurrent with any other live loads. 7) • This truss has been designed for a live load of 20.Opsf on the bosom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 1=125, 3=125. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 Ni0133A M Monopitch 122 1 1 3 f Run: 8.130 s Nov 13 2017 Print: 8.130 s Nov 13 201 g q 0 ID:bOydnXKyuk5YJ6RXcsbcV4zlHOV-Girfl 4"2-8 8-2-0 4y2-8 3-11-8 1.5x4 II 3 3x4 =�-0 9.4-0 Scale = 1:27.3 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft L/d PLATES GRIP TCLL 20.0 Plate Grip DOL 1.25 TC' 0.25 Vert(LL) -0.05 4-9 >999 360 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 BC} 0.37 Vert(CT) -0.10 4-9 >992 240 BCLL 0.0 ' Rep Stress Incr YES WB 0.09 Horz(CT) 0.00 4 n/a n/a BCDL 10.0 Code FBC2017/TP12014 Matrix -MP Wind(LL) 0.01 5 >999 240 Weight: 42 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except BOT CHORD 2x4 SP No.2 end verticals. WEBS 2x4 SP No.3 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEDGE Left: 2x8 SP No.2 ; MiTek recommends that Stabilizers and required cross bracing be Installed during truss erection, in accordance with Stabilizer REACTIONS. (lb/size) 4=238/0-4-0 (min. 0-1-8), 1=356/0-3-8 (mini. 0-1-8) Installationuide. Max Horz 1=188(LC 7) Max Uplift4=-79(LC 5), 1=-79(LC 8) Max Grav4=245(LC 13), 1=356(LC 1) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; ICDL=4.Opsf; BCDL=6.Opsf, h=25ft; B=45ft; L=24ft; eave=oft; Cat, II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed: end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60e 2) This truss has been designed for a 10.0 psf bottom chord live Ioadjnonconcurrent with any other live loads. 3) ' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Provide mechanical connection (by others) of truss to bearing plato capable of withstanding 100 lb uplift at joint(s) 4, 1. LOAD CASE(S) Standard - ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247.7409 CA:9333 KELLY E LYONS, P.E. FL#56191 MGR (Jack -Open Girder I1 Run: 8.130 s Nov 132017 Print: 9-4-0 ID:bOydnXKyuk5YJ6RXcsbc 3x, 6 J.VVIIG 2X4 I I 9-4-0 10-7-0 LOADING (psf) SPACING- 2-0-0 CSI, DEFL. in floc) I/deft L/d TCLL 20.0 Plate Grip DOL 1.25 TC; 0.06 Vert(LL) -0.01 4-5 >999 360 TCDL 7.0 Lumber DOL 1.25 BC, 0.54 Vert(CT) -0.02 4-5 >999 240 BCLL 0.0 ' Rep Stress Incr NO Wig 0.22 Horz(CT) 0.00 4 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Matrix -MP Wind(LL) 0.01 4-5 >999 240 LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD BOT CHORD 2x6 SP No.2 WEBS 2x4 SP No.3 BOT CHORD REACTIONS. (lb/size) 6=637/0-8-0 (min. 0-1-8), 4=1267/Mechanit:al Max Horz 6=128(LC 25) Max Uplift6=-177(LC 8), 4=-509(LC 8) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less ei;cept when shown. TOP CHORD 1-6=-707/254, 1-2=-1317/454 BOT CHORD 5-7=-411/956, 4-7=-550/1328 WEBS 2-5=-283/814, 1-5=-368/1160, 2-4=-1210/505 Scale: 1/2"=1' PLATES GRIP MT20 244/190 Weight: 72 lb FT = 20% Structural wood sheathing directly applied or 5-8-0 oc purlins, except end verticals. Rigid ceiling directly applied or 10-0-0 oc bracing. NOTES- 1) 2-ply truss to be connected together with 1 Od (0.131 "xY) nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-7,'-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted tis (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.0psf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=oft; Cat. Il; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) This truss has been designed for a 10.0 psf bottom chord live loadlnonconcurrent with any other live loads. 6) This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide Will fit between the bottom chord and any other members. 7) Refer to girder(s) for truss to truss connections. 8) Bearing at joint(s) 6 considers parallel to grain value using ANSI/TI'I 1 angle to grain formula. Building designer should verify capacity of bearing surface. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except Gt=lb) 6=177, 4=509. 10) Hanger(s) or other connection device(s) shall be provided sufficleht to support concentrated load(s) 1506 lb down and 595 lb up at 3-11-8 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increase=1.25 Uniform Loads (plf) - Vert: 1-3=-54, 4-6=-20 Continued on page 2 ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247.7400-FAX:813-247-7409 33 KELLY E LYONS3P,E. FL#56191 0133A I MH7 Half Hip Girder 9-4-0 Special 4x8 = 1.5x4 II 3x10 II 3x4 = 9-4-0 Special 9-4-0 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft Ud TCLL 20.0 Plate Grip DOL 1.25 TC 0.18 Vert(LL) -0.01 6-7 >999 360 TCDL 7.0 BCLL 0.0 Lumber DOL Rep Stress Incr 1.25 NO BC 0.23 WB Vert(CT) -0.02 6-7 >999 240 BCDL 10.0 Code FBC2017/TPI2014 0.12 Masrix-MP Horz(CT) Wind(LL) 0.00 0.01 5 6-7 n/a >999 n/a 240 LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD BOT CHORD 2x4 SP No.2 WEBS 2x4 SP No.3 BOT CHORD WEDGE Left: 2x8 SP No.2 REACTIONS. (lb/size) 5=405/0-4-0 (min. 0-1-8), 1=383/0-3-8 (min. 0-1-8) Max Horz 1=165(LC 7) Max Uplift5=-175(LC 5), 1=-96(LC 8) Max Grav5=41O(LC 25), 1=383(LC 1) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-275/89 WEBS 3-6=-45/298, 3-5=404/148 Scale = 1:28.0 PLATES GRIP MT20 244/190 Weight: 52 lb FT = 20% Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation aulde. NOTES- 1) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; T;CDL=4.Opsf, BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 _ 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load;nonconcurrent with any other live loads. 4) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1 except Qt=lb) 5=175. 6) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated loads) 95 lb down and 113 lb up at 7-0-0 on top chord, and 143 lb down and 55 lb up at 7-0-0 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 7) In the LOAD CASE(S) section, loads applied to the face of the trust; are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increase=1.25 Uniform Loads (plf) Vert: 1-3=-54, 3-4=-54, 5-8=-20 Concentrated Loads (lb) Vert: 3=-70(8) 6=-125(B) ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAIWPA FL33618 PH:813-247-7400-FAX; 813-247-7409 KELLY E LYONS P3 E. FL#56191 0133A IPS01 IPiggyback 12 I 1 19-6-12 1.5x4 II 3x4 = 6.00 FIF 3 4 Scale = 1:34.3 1.5x4 II 1.5x4 II 3x4 = 14 5 1A 6 v 3x4 = 13 12 11 10 3x4 = 1.5x4 II 3x4 = 1.5x4 11 1.5x4 II 19-6-12 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/defl Ud TCLL 20.0 Plate Grip DOL 1.25 TC! 0.38 Vert(LL) -0.00 8 n/r 120 TCDL 7.0 Lumber DOL 1.25 BCC. 0.27 Vert(CT) -0.00 8 n/r 120 BCLL 0.0 ' Rep Stress Incr YES WB 0.08 Horz(CT) 0.00 8 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Matrix-S LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 OTHERS 2x4 SP No.3 PLATES GRIP MT20 244/190 Weight: 63 lb FT = 20% BRACING - TOP CHORD Structural wood sheathing directly applied or 10-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer REACTIONS. All bearings 18-4-0. Installation guide. (lb) - Max Horz2=37(LC 7) Max Uplift All uplift 100 lb or less at joint(s) 2, 8 excej)t 11=-183(LC 4), 13=-137(LC 4), 10=-138(LC 5) Max Grav All reactions 250 lb or less at joint(s) 2, 8 except 11=481(LC 18), 13=413(LC 17), 10=413(LC 18) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less eiccept when shown. WEBS 5-11=-353/259, 4-13=-309/202, 6-10=-309/202 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; 7'CDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=oft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left ar`! d right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) Gable requires continuous bottom chord bearing. _ 5) This truss has been designed for a 10.0 psf bottom chord live load[nonconcurrent with any other live loads. 6) ' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide Will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 8 except Qt=lb) 11=183, 13=137. 10=138. 8) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, 2121 W EARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 33 KELLY E LYONS3P.E. FL#66191 CD 0 uu u my is [u7 i rnnu mi JU s Nov 93 zu17 MITeK Industries, Inc. Tue Nov 3 09:51:37 2020 Pagel 19-6.12 &5 J ID:bOydnXKyuk5YJ6RXcsbcV4zlHOV-dko9CzSSd1TVZ9Ukzzu4QDZumWIWrj7yuTym8yMxgi 14-6-5 5-8-5 810-0 20-2-10 5-8-5 ` 3x4 = 1.5x4 II 3x4= Scale=1:34.3 3x4 = 13 12 11 10 3x4 = 1.5x4 II 3x4 = 1.5x4 II 1.5x4 II 19-6.12 LOADING (psf) SPACING- 2-0-0 CSI'. DEFL. in (loc) I/defl Ud TCLL 20.0 Plate Grip DOL 1.25 TCj 0.26 Vert(LL) 0.00 9 n/r 120 TCDL 7.0 Lumber DOL 1.25 BC, 0.28 Vert(CT) 0.00 9 n/r 120 BCLL 0.0 ' Rep Stress Incr YES WB 0.06 Horz(CT) 0.01 8 n/a n/a BCDL 10.0 Code FBC2017ITP12014 Matrix-S LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 OTHERS 2x4 SP No.3 PLATES GRIP MT20 244/190 Weight: 66 lb FT = 20% BRACING - TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer REACTIONS. All bearings 18-4-0. Installation auide. (lb) - Max Horz 2=-59(LC 6) Max Uplift All uplift 100 lb or less atjoint(s) 2, 13, 10„8 except 11=-141(LC 5) Max Grav All reactions 250 lb or less at joint(s) 2, 8 Except 11=420(LC 1), 13=285(LC 17). 10=285(LC 18) FORCES. (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-259/119, 3-4=-260/157, 6-7=-260/156, 7-8=-251')/117 WEBS 5-11=-294/218 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCD1.=4.0psf; BCDL=6.Opsf, h=25ft; 13=4511; L=24ft; eave=4ft; Cad. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) Gable requires continuous bottom chord bearing. 5) This truss has been designed for a 10.0 psf bottom chord live loadjnonconcurrent with any other live loads. 6)' This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 13, 10, 8 except (jt=lb) 11=141. 8) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W EARSS AV. TAMPA FL33618 PH:813.247-7400-FAX:813-247-7409 33 KELLY E LYONS3P.E. FL#56191 0133A Iruss PB03 IPiggyback 12 I 1 Y 00 13 0 19-6-12 7-8-5 ID:bOydnXKyuk5YJ6RXcsbcV4zlHOV-5wMXPJT4OLbmBi3khPJzQ63LwdjEJC88YCVIbyMxg; 7-8-5 12-6.5 20-2-10 4-10-0 7-8-5 Scale=1:34.3 3x4 1.5x4 II 3x4 = 4 5 6 3x4 = 13 12 11 10 3x4 = 1.5x4 11 3x4 = 1.5x4 11 1.5x4 II 19-6-12 LOADING (psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft Ud TCLL 20.0 Plate Grip DOL 1.25 TC. 0.20 Vert(LL) 0.00 8 n/r 120 TCDL 7.0 Lumber DOL 1.25 BCC 0.28 Vert(CT) 0.00 8 n/r 120 BCLL 0.0 ' Rep Stress Incr YES WE 0.05 Horz(CT) 0.01 8 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Mairix-S LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 OTHERS 2x4 SP No.3 PLATES GRIP MT20 244/190 Weight: 69 lb FT = 20% BRACING - TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer REACTIONS. All bearings 18-4-0. Installation auide. (lb) - Max Harz 2=-81(LC 6) Max Uplift All uplift 100 lb or less at joint(s) 2, 11, 8 e:(cept 13=-100(LC 8), 10=-100(LC 8) Max Grav All reactions 250 lb or less at joint(s) 2', 8 Except 11=309(LC 1), 13=352(LC 17), 10=352(LC 18) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-287/98, 3-4=-310/172, 6-7=-310/172, 7-8=-287/97 NOTES- 1) Unbalanced roof live loads have been considered for this design, 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; TCDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=oft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber " DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) Gable requires continuous bottom chord bearing. 5) This truss has been designed for a 10.0 psf bottom chord live load; nonconcurrent with any other live loads. 6) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3.6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing platq' capable of withstanding 100 lb uplift at joint(s) 2, 11, 8 except Qt=lb) 13=100, 10=100. 8) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX: 813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 10D (Truss - russ I ype ly 1133A P804 Piggyback 2 1 Job Reference o tional WPS, Tampa,Fl, Pedro Jimenez ! Run: 8.130 s Nov 13 2017 Print• 8.130 5 Nov 13 2017 MiTek Industries, Inc. Tue Nov 3 09:51:39 2020 Page 1 19 6 12 ID:bOydnXKyuk5YJ6RXcsbcV4zlHOV-Z6wvdrrl9fkdpSe65OwYVeeCEKz4zlZIQCy3r1yMxG A-R 5 u I -- 9-8-5 •- - " IV-1- IV 0-10-0 9.8-5 1.5x4 II 3x4 = I 3x4 = I 4 5 6 Scale = 1:35.9 3x4 = 13 12 11 10 3x4 = 1.5x4 11 3x4 = 1.5x4 11 1.5x4 11 19-6-12 LOADING (psf) SPACING- 2-0-0 CSi. DEFL. in (loc) I/deft Ud TCLL 20.0 Plate Grip DOL 1.25 TC' 0.32 Vert(LL) -0.00 9 n/r 120 TCDL 7.0 Lumber DOL 1.25 BC; 0.27 Vert(CT) -0.00 9 n/r 120 BCLL 0.0 • Rep Stress Incr YES WE 0.11 Horz(CT) 0.00 8 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Masrix-S LUMBER - TOP CHORD 2x4 SP No.2 BOT CHORD 2x4 SP No.2 OTHERS 2x4 SP No.3 PLATES GRIP MT20 244/190 Weight: 71 lb FT = 20% BRACING - TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MITek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer REACTIONS. All bearings 18-4-0. Installation quide. (lb) - Max Horz 2=-103(LC 6) Max Uplift All uplift 100lb or less atjoint(s) 2, 11, 8 except 13=-151(LC 8), 10=-151(LC 8) Max Grav All reactions 250 lb or less at joint(s) 2, 8 except 11=390(LC 1), 13=406(LC 17). 10=406(LC 18) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less e)(cept when shown. WEBS 5-11=-263/79, 3-13=-307/214, 7-10=-307/214 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph; 1'CDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=oft; Cat. II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left a(id right exposed; end vertical left and right exposed; Lumber- ' DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. - 4) Gable requires continuous bottom chord bearing. 5) This truss has been designed for a 10.0 psf bottom chord live load; nonconcurrent with any other live loads. 6) • This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6.0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 11, 8 except Gt=lb) 13=151, 10=151. 8) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813-247-7400-FAX:813-247-7409 CA:9333 KELLY E LYONS, P.E. FL#56191 [fuss . I I russ Type P805 19-6-12 10-1 5 ID:bOydnXKyuk5YJ6RXcsbcV4zlHOV-1JUHq?ULwysUQcbJf5Rn2rBNcjJKi66keI 10-1-5 ? 20-2-10 10-1-5 4x4 = 3x4 = 11 10 9 e 3x4 = 1.5x4 11 3x4 = 1.5x4 11 1.5x4 11 19-6-12 Scale = 1:34.8 M Io rOD 6 2_ 10 DEFL. in (loc) I/defi Ud PLATES GRIP LOADING (psf) SPACING- 2-0-0 CSI'. TCLL 20.0 Plate Grip DOL 1.25 TC} 0.34 Vert(LL) -0.00 7 n/r 120 MT20 244/190 TCDL 7.0 Lumber DOL 1.25 130 0.27 Vert(CT) -0.00 7 n/r 120 BCLL 0.0 ' Rep Stress Incr YES WE, 0.12 Horz(CT) 0.00 6 n/a n/a BCDL 10.0 Code FBC2017/TPI2014 Matrix-S Weight: 71 lb FT = 20% LUMBER- BRACING - TOP CHORD 2x4 SP No.2 TOP CHORD BOT CHORD 2x4 SP No.2 Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD OTHERS 2x4 SP No.3 Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer REACTIONS. All bearings 18-4-0. Installationuide. (lb) - Max Horz 2=-107(LC 6) Max Uplift All uplift 100 lb or less at joint(s) 2, 9, 6 except 11=-160(LC 8), 8=-160(LC 8) Max Grav All reactions 250 lb or less at joint(s) 2', 6 Elxcept 9=400(LC 1), 11=414(LC 17), 8=414(LC 18) FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less e;<cept when shown. WEBS 4-9=-272/84, 3-11=-316/224, 5-8=-316/224 NOTES- ' 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=150mph (3-second gust) Vasd=116mph;1'CDL=4.Opsf; BCDL=6.Opsf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat.-.' II; Exp B; Encl., GCpi=0.18; MWFRS (directional); cantilever left and right exposed; end vertical left and right exposed; Lumber- DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live loadnnonconcurrent with any other live loads. 5) 'This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 .widewill fit between the bottom chord and any other members. - r 6) Provide mechanical connection (by others) of truss to bearing platf; capable of withstanding 100 lb uplift at joint(s) 2, 9, 6 excepi;Gt=ib) 11=160, 8=160. ' r.. 7) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. LOAD CASE(S) Standard ALLTECH STRUCTURAL ENGINEERING, INC. 2121 W BEARSS AV. TAMPA FL33618 PH:813.247-7400-FAX:813-247-7409 33 KELLY E LYONS3P,E. FL#56191