Loading...
HomeMy WebLinkAboutEAST ELEVATION PLANlal =..-J II � �/ � :_n -- � � �-'�' �/ � , ," , I r::==::s ' I"'--. I I I I 7 == )::,,.._ II �Fl -□ --n -- f---D D --- u u . ��□□□□� � �::= >--->--- II I u u u u u u u --------------- -,---------....,,, ----"' -i " D = 11 I I I u II v ,,.---p, V "� . --I-==� I-r=:=j -- -�-�-==-"□DC D'D e □-f----o=�:==-;==t -t� � t==i •i====�=c��c ��--=r- ......... ,,,,, " .... u•" .,,,,. ,, ........ ,,, D • '-- - � = -== I== --t II II t-F II r,:: 11111111 II 1�m rm II � i,Hf :H,h��� RR �H�� RF if IRRRr l������:,: :: :: .. .. rA�-� (I\ EAST ELEVATION II L-,,--1 v� / � c:=::i 1\,---_ II ' � Ill " I �; \\\\\\I ,1 m11I "' nnr "' "'" V \\ \\ \\II M II \\ D 1r 1 2 3 4 5 6 7 8 9 10 11 12 13 D1 14 D2 EAST ELEVATION NOTES: 1. No Scale 2. Relevance- Windows and Doors Only 3. Typical Details Apply to Window Clusters 4. See Accompanying Window and Door Schedule, each Elevation 1D12D23456 789NORTH ELEVATIONNOTES:1. No Scale2. Relevance- Windows and Doors Only3. Typical Details apply to Window Clusters4. See Accompanying Window and Door Schedule each Elevation 2 1 3 4 5 D1 6 7 8 G1 SOUTH ELEVATION NOTES: 1.No Scale 2.Relevance- Windows and Doors Only 3. Typical Details apply to Window Clusters 4. See Accompanying Window and Door Schedule each Elevation -..-Ii ,I, ------.IL__ .J i =-.IC. ----= □□ L--'-=' -'---- =1.,.-..._ i....-- 1.,.-:::::::;: ®I I L--- . -..._ i I w ... --- " ...... ._ -' I . II v i· ' . . ---- l -I i,-.,_i,-=Et=: ' -i,--L...-- . I --.... --- - • ----lL ::::U -.lL. 1r- .-----,, -._ =='--===-=l -T 1-----' -- ,. · i-- .,___J \:======::\ ==========HLI.- ---l l • 1 ,-- "_-- - - 1 2 3 D1 4 5 6 D2 D3 8 9 10 11 D5 D4 Notes: 1. No Scale 2. Relevance- Windows and Doors Only 3. Typical Details Apply to Window Clusters 4. See Accompanying Window and Door Schedule, each Elevation West Elevation 7 3. General notes apply to all subject openings, all elevations. See Comment Section below for notes, exceptions, differing conditions. NORTH SOUTH Windows 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 *Doors D1 D1 D2 D3 G1 1. Reference drawings for this property are limited. Aspects of the Elevation Drawings provided may differ from actual field conditions. CONTINUED NEXT PAGE Windows Doors Shown as window on elevation dwg. NC e) Install new cementitious siding IAW manufacturer's instructions; install new cedar trim; caulk perimeter w silicone sealant f) Refer to accompanying section drawings for typical detail of put back. g) All openings require flashing except where protected by overhangs (porch, stoop, etc). See Schedule. h) NC below indicates "No Comment". General Notes a) Remove existing cedar trim and building paper from each opening; inspect sheathing for damage. b) Where damage to sheathing is evident, remove siding, felt, to limits of damage plus 6" (min) or as needed for put-back. c) Remove damaged sheathing back to sound material and replace; ensure proper backing at all joints. d) Install new building paper (15# asphalt felt or equal) over new sheathing, overlap 6", secure in place; install new flashing. *See related Note on West Elevation drawing NC Shown as window on dwg; actually a door NC NC NC NC No repairs required; toubleshoot as needed NC NC NC 4. Typical approach to repairing each exterior window and door opening to include: 2. Coordinate w St Lucie County Building Dept re: phased inspection of work in progress if necessary. NOTES/COMMENTS NOTES/COMMENTS Dwg depicts staircase to D1, since replaced with spiral stairway (see photos). NC NC NC NC NC NC NC NC NC EAST WEST Windows Windows 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 13 *Doors 14 D1 15*D2 D3 No repairs required; toubleshoot as needed *Doors D4 No repairs required; toubleshoot as needed D1 D5 No repairs required; toubleshoot as needed D2 D6 D3 D7 D8 *See Note below *North of the Main Entrance (D2) the wall line turns back to the east, location of D3 and Window15 not shown on any elevation dwg. See reference photo P-1. *See Note below No radius window above NC No radius window above No repairs required; toubleshoot as needed NC NC NC No repairs or flashing req'd; toubleshoot as needed No repairs or flashing req'd; toubleshoot as needed NC No repairs or flashing req'd; toubleshoot as needed No repairs or flashing req'd; toubleshoot as needed REQUIRED REPAIRS/ COMMENTS See Note below No repairs or flashing req'd; toubleshoot as needed No repairs or flashing req'd; toubleshoot as needed No repairs or flashing req'd; toubleshoot as needed NC NC No repairs or flashing req'd; toubleshoot as needed Window not clearly indicated on dwg; REQUIRED REPAIRS/ COMMENTS CONTINUED FROM PAGE 1 *At each end of the rear entrance porch the bulding line turns west, location of doors D7 and D8 not shown on any elevation dwg. See reference photo P-2. No repairs or flashing req'd; troubleshoot as needed. NC No repairs required; toubleshoot as needed No repairs required; toubleshoot as needed Dwg depicts staircase to D6, since replaced with spiral stairway (see photos). *See Note below No repairs or flashing req'd; toubleshoot as needed Main Entry NC Shown as door on dwg, actually a window. Arched window NC NC