Loading...
HomeMy WebLinkAboutROOFING PERMIT INFORMATION SHEETST. LUCIE WORKS ST LUCIE COUNTY ROOFING PERMIT INFORMATION SHEET Florida Building Code 7th Edition (2020) Based on Section 1525 of the Florida Building Code - Building INSTRUCTION PAGE COMPLETE THE NECESSARY SECTIONS OF THE UNIFORM ROOFING SHEET APPLICATION FORM AND ATTACH THE REQUIRED DOCUMENTS AS NOTED BELOW: Roof System Low Slope Application Prescriptive BUR-RAS 150 Asphaltic Shingles Concrete or Clay Tile Metal Roofs Wood Shingles and Shakes Other Required Sections of the Permit Application Form A, B, C A, B, C A, 8, D A,B,D,E A, B, ❑ A, B, D As Applicable Attachments Required See List Below 1,2,3,4A6,7 t,4,5,6,7 1,2.4,5r8,7 1,2,3,4,5,6,7 1,2,3,4,50,7 t,2,4A6,7 I,2,3.4,5,6,7 ATTACHMENTS REQUIRED As Applicable): 1. Fire Directory Listing Page 2. From Product Approval: Front Page Specific System Description Specific System Limitations General Limitations Applicable Detail Drawings 3. Design Calculations per Chapter 16, or if applicable, RAS 127 or RAS 128 4. Other Component of Product Approval 5. Municipal Permit Application 6. Owners Notification for Roofing Considerations (Reroofing Only) 7. Any Required Roof Testing/Calculation Documentation Form RooflnfoFeb21 Rev Feb 18, 2021 '" LUCIE WORKS Section C (Low Slope Roof) Fill in specific roof assembly components and identify manufacturer (If a component is not used, identify as "NA") System Manufacturer: Product Approval No.: Design Wind Pressures, From RAS 128 Or Calculations. - Zone V: _ Zone 1: Zone 2: Zone 3: Max. Design Pressure, from the specific product approval system: Deck: Type: Gauge Thickness: Slope: Anchor/Base Sheet & No. df Ply(s): Anchor/Base Sheet Fastener/Bonding Material: Insulation Base Layer: Base Insultation Size and Thickness: Base Insulation Fastener/Bonding Material: Top Insulation Layer: Top Insulation Size and Thickness: Top Insulation Fastener/Bonding Material: Base Sheet(s) & No. of Ply(s): Base Sheet Fastener/Banding Material: Ply Sheet(s)' & No. of Ply(s): Ply Sheet Fastener/Sanding Material: Top Ply: Top Ply Fastener/Bonding Material: Surfacing: Fastener Spacing for Anchor/Base Sheet Attachment: Zone 1':—" oc @ Lap, # Rows @ "ao Zone 1:—" ❑c @ Lap, # Rows @ Doc Zone 2:_,_." oc @ Lap, # Rows @ moo Zone 3:—" oc @ Lap, # Rows @ "oc Number of Fasteners Per Insulation Board: Zone 1': Zane 1: Zone 2: Zone 3 Illustrate Components Noted and Details as Applicable: Woodblocking, Gutter, Edge Termination, Stripping, Flashing, Continuous Cleat, Cant Strip, Base Flashing, Counterflashing, Coping, Etc., Indicate: Mean Roof Height, Parapet Height, Height of Base Flashing, Component Material, Material' Thickness, Fastener Type, Fastener Spacing or Submit Manufacturers Details that Comply with RAS 111 and Chapter 16. ST. LUC E WORKS Section D (Steep Slope Roof System) Roof System Manufacturer: JA TAYLOR ROOFING EDGE-LOC 1" STANDING SEAM Notice of Acceptance Number: N0A:18-1023.17 Minimum Design Wind Pressures, If Applicable (From RAS 127 or Calculations): Zone 1: -57 Zone 2e:-57 Zone 2n -91 Zone 2r: -91 Zone 3e: -91 Zone 3r: -128 Deck Type: i PLYWOOD Roof $iope: Type Underlayment: ELF ApHEREp UNaERLAYMEiJT To POLYGLASS MTs FL#5259.1 insulation: Fire Barrier: Ridge Ventilation? Fastener Type & Spacing: Fj�F EL�14- ERIMETER, 8❑ RING S NK NAILS Adhesive Type: Type Cap Sheet: [!!an Roof Height: 15' FT Roof Covering: METAL Type R Size Drip 2" x 2 112" Edge: ST. LUCIE WORKS Section E (Tile Calculations) For Moment based tile systems, choose either Method 1 or 2. Compare the values for M, with the values from Mf. If the Mf values are greater than or equal to the Mrvalues, for each area of the roof, then the rile attachment method is acceptable. Method 1'Moment Based Tile Calculations Per RAS 12T (Zone 1: x h � Md Product Approval ML- (Zone 2e: _ X. = ---) - Mg: = M,,�* Product Approval Mr (Zone 2n: x X - Mg; = Product Approval Mf (Zone 2r: x 7L = j - Mg: = Me, Product Approval Mf (Zone 3e: x 76 = - Mg: - Mr& Product Approval Mt (zone 3r: x - Mg'. -- Mar ar Product Approval Mf_ Method 2 "Slmplified Tile Calculations Per Table Below" Required Moment of Resistance (Mr) From Table Below Product Approval Mf Mr required Moment Resistance* Mean Roof Height Roof Slope 2:12 3:12 4:12 5:12 6:12 1s, 34.4 32.2 30.4 28.4 26.4 2D' 36.5 34.4 32.2 30.1 28.0 25' 38.2 36.0 33.8 31.6 29.4 3d 39.7 37.4 35.1 32.8 30.5 40' 42.2 39.8 37.3 34.9 32,4 7:12 24.4 25.9 z7.1 28.2 30.0 *Must be used in conjunction with a list of moment based tile systems ■ For Uplift based tile systems use Method 3. Compare the values for F' with the values for F, If the F' values are greater than or equal to the Fr values, for each area of the roof, then the tile attachment method is acceptable. Method 3 "Uplift Based Tile Calculations Per RAS 12T (zone 1: x L =x W:= j -W: cos r =Fr1 Product Approval F' (Zone 2e: x L =x W:=�� -W.-cos r =F,2e Prod u ct Ap p rova I F' (Zone 2n: x I =x W:=:� -W; cos r =Fr2" Product Approval F' (Zone 2r: x L =x W:= ) -W: cos r =Fr2r Product Approval F' (Zone 3e: x (-= x W:= 7 -W: cos r =Fr3e Product Approval F' (Zone 3r: x L =x W:= ) -W: cos r =Fr3r Product Approval F'