Loading...
HomeMy WebLinkAboutROOFING PERMIT INFORMATION SHEET°-' ST. LUCIE '!VORK;S ST LUCIE COUNTY ROOFING PERMIT INFORMATION SHEET Florida Building Code 7th Edition (2020) Based on Section 152S of the Florida Building Code -Building INSTRUCTION PAGE COMPLETE THE NECESSARY SECTIONS OF THE UNIFORM ROOFING SHEET APPLICATION FORM AND ATTACH THE REQUIRED DOCUMENTS AS NOTED BELOW: Roof System Required Sections of the Permit Application Form Attachments Required See List Below Low Slope Application A, B, C Prescriptive BUR-RAS 150 A, B, C 2,4,5,6,7 Asphaltic Shingles A, B,D 1R4,5,8,7 Concrete or Clay Tile A, B, D, E 1,2A4,5,6,7 Metal Roofs A, B, D 1,2,3,4,6A7' Wood Shingles and Shakes A, B, D 1,2,4,6,6,7 Other As Applicable 12,3,4,5,8,7 ATTACHMENTS REQUIRED As Applicable): 1. Fire Directory Listing Page 2. From Product Approval: Front Page Specific System Description Specific System Limitations General Limitations Applicable Detail Drawings 3. Design Calculations per Chapter 16, or if applicable, RAS 127 or RAS 128 4. Other Component of Product Approval 5. Municipal Permit Application 6. Owners Notification for Roofing Considerations (Reroofing Only) Z Any Required Roof Testing/Ca lculation Documentation Form RooflnfoFeb21 Rev Feb 19, 2021 ST. LUCIE '' 'ARKS Section C (Low Slope Roof) Fill in specific roof assembly components and identify manufacturer (If a component is not used, identify as "NA") System Manufacturer: Product Approval Design Wind Pressures, From RAS 128 Or Calculations: Zone 1': _ Zone 1: Zone 2: _Zone 3: Max. Design Pressure, from the specific product approval system: Deck: Gauge Thickness: Slope: Anchor/Base Sheet & No. df Ply(s): Anchor/Base Sheet Fastener/Bonding Material: Insulation Base Layer: Base Insultation Size and Thickness: Base Insulation Fastener/Bonding Material: Top Insulation Layer: Top Insulation Size and Thickness: Top Insulation Fastener/Bonding Material: Base Sheet(s) & No. of Ply(s): Base Sheet Fastener/Bonding Material: Ply Sheet(s)' & No. of Ply(s): Ply Sheet Fastener/Bonding Material: Top Ply: Top Ply Fastener/Bonding Material: Surfacing: Fastener Spacing for Anchor/Base Sheet Attachment: Zone 1':_" oc @ Lap, N Rows— ® —' ac Zone 1:—" oc @ Lap, p Rows _ ® _"co Zone 2:—" oc @ Lap, # Rows _ ® —' m Zone 3:_" oc @ Lap, If Rows— ® co Number of Fasteners Per Insulation Board: Zone 1':_Zone 1:_Zone 2:_Zone 3:_ Illustrate Components Noted and Details as Applicable: Woodblocking, Gutter, Edge Termination, Stripping, Flashing, Continuous Cleat, Cant Strip, Base Flashing, Counterflashing, Coping, Etc., Indicate: Mean Roof Height, Parapet Height, Height of Base Flashing, Component Material, Material' Thickness, Fastener Type, Fastener Spacing or Submit Manufacturers Details that Comply with RAS 111 and Chapter 16.. "Or LUCIE WORKS 010 Section D (Steep Slope Roof System) Roof System Manufacturer: JA TAYLOR ROOFING 5V CRIMP Notice of Acceptance Number: FL#17443.1 Minimum Design Wind Pressures, If Applicable (From RAS 127 or Calculations): Zone 1: - 77 Zone 2e: 101 zone 2-: Zone 2r: -98 Zone 3e�128 Zone 3r: Deck Type: PLYWOOD' Type Underiayment: EEL & STICK-OWENS CORNING TITANIUM-FL#11602-1 Roof Slope: 5 - 121 Insulation: Fire Barrier: Ridge Ventilation? Fastener Type & Spacing: B" FIELD 14" PERIMETER, S❑ RINGS NAILS Adhesive Type: Type Cap Sheet: Mean Roof- Height: 15' FT Roof Covering; M ETAL Type & Slze Drip Edge: sr. LUCIE WORKS Section E (Tile Calculations) For Moment based tile systems, choose either Method 1 or 2. Compare the values for M, with the values from Mr. If the Mr values are greaterthan or equal to the M,values, for each area of the roof, then the tile attachment method is acceptable. Method 1'Moment Based Tile Calculations Per RAS 12T (Zone 1: _xy__ )-. MT. _=Mn_ Product ApprovalM (Zone 2e: '_Xl_= _ I- Mg: _=M._ Product Approval Mr (Zone 2n: _x 1_=_)- Mg: _=Mm_ Product Approval Mr (Zone 2r: _xx - _)_Mg;_=M,_ Product Approval Mr (Zone 3e: '`xll_=,_j-Mg:_=M®._ Product Approval Mr (Zone 3r: _X.1-=--Mg:_=M,b_ Product Approval M, Method 2 "Simplified Tile Calculations Per Table Below" Required Moment of Resistance (Mr) From Table Below_Product Approval Mr - Mr required Moment Resistance - Mean Roof Height Roof Slope 15' 20' 25' 30' 40' 2:12 34.4 36.5 38.2 39.7 42.2 3:12 32.2 34.4 36.0 37.4 39.8 4:12 30.4 32.2 33.8 35.1 37.3 5:12 28.4 30.1 31.6 32.8 34.9 6:12 26.4 28.0 29.4 30.5 32.4 7:12 24.4 25.9 27.1 28.2 30.0 'Must be used in conjunction with a list of moment based the systems • For Uplift based tile systems use Method 3. Compare the values for F' with the values for F, If the F'values are greater than or equal to the Fr values, for each area of the roof, then the tile attachment method is acceptable. Method 3 "Uplift Based Tile Calculations Per RAS 12T (Zone 1: x L =x W:=_.J -W: cos r =F,t_ Product Approval F' (Zone 2e: _xL=xW:= ... J-W:_cos; r =Fa• Product Approval F' (Zone 2n: -x L=xW:=_)-W:cos r=frm_ Product Approval F' (Zone 2r: a L= x W:=� -W: Cos r= Far_ Product Approval P' (Zone 3e: x L x W:=... J -W:cos r=Fa._ Product Approval F' (Zone 3r: x L= x W:= ) -W: Cos r= Far_ Product Approval F' Whereto Obtain Information Description Symbol Where to find Design Pressure Zones 1, 2e, 2n, 2r, 3e, 3r From applicable table in RAS 127 or by an engineering analysis prepared by PE based on ASCE 7 Mean Roof Height H lob Site Roof5lope B Job Site Aerodynamic Multiplier a ProduRApproval Restoring Moment due to Gravity Ma Product Approval Attachment Resistance Mt Product Approval Required Moment Resistance Ma Calculated Minimum Attachment Resistance F' Product Approval Required Uplift Resistance Fr Calculated Average Tile Weight W Product Approval Tile Dimensions L=length W=width Product Approval All calculations must be submitted to the building official at the time of permit application.