In -Place Density Test Report
Client: VEGA'S HOMES CONST, INC.159 OSP UES Technician: Johnnie Smith
904 Osceola Drive
Fort Pierce, FL 34982
Project: 18-4929 VEGA'S HOMES CONSTRUCTION
Various Locations, County, FL
Area Tested: 1950 S Brocksmith Road, Ft. Pierce -
Foundation Pad
Material: Fill
Reference Datum: 0 = Top of Final Grade
The tests below meet the 95% minimum compaction requirement.
Date Tested: 08/25/2021
Type of Test:
Field: ASTM D-6938 Nuclear Gauge Method
Laboratory: ASTM D1557 Modified Proctor
Maximum
Optimum
Field Dry
Field
Soil
Pass
Test
Density
Moisture
Density
Moisture
Compaction
or
No.
Location of Test
Range
(pcf)
N
(pcf)
(%)
(%)
Fail
1
E Section
0-1 ft
105.7
11.2
102.9
10.0
97
Pass
2
W Section
0-1 ft
105.7
11.2
103.1
10.3
98
Pass
3
Center
0-1 ft
105.7
11.2
104.7
11.1
99
Pass
Remarks: 0-1', 1-2', 2-3', 3-4', 4-5' HCP=50+, > 95 % Compaction, PASS. HCP tests are empirically correlated to the relative
density of the soil.
Permit: 21050130
Reviewed By
GFA International, Inc
FBPE Registry No.4930
'am;rtic
Digitally signed by Thomas
FP ° GF sEO�
D
" W46 *"
\,
Montano:A0141000000017
W
818498DCD000019A3
Date: 2021.08.2710:18:30
-04'00'
Thomas Dominic Montano
Branch Manager
STATE OF FLORIDA
Professional Engineer No. 84146
This item has been digitally signed and sealed by Thomas Dominic
Montano on the date adjacent to the seal. Printed copies of this
document are not considered signed and sealed and the signature
must be verified on any electronic copies.
To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and
authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval.
Page 1