Loading...
HomeMy WebLinkAboutcompactionA Universal Sciences snn c .tceCompany UES Project No: 3360.1800059.0000 Workorder No: 243398-1 Report Date: 08/27/2021 607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580 In -Place Density Test Report Client: VEGA'S HOMES CONST, INC.159 OSP UES Technician: Johnnie Smith 904 Osceola Drive Fort Pierce, FL 34982 Project: 18-4929 VEGA'S HOMES CONSTRUCTION Various Locations, County, FL Area Tested: 1950 S Brocksmith Road, Ft. Pierce - Foundation Pad Material: Fill Reference Datum: 0 = Top of Final Grade The tests below meet the 95% minimum compaction requirement. Date Tested: 08/25/2021 Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Laboratory: ASTM D1557 Modified Proctor Maximum Optimum Field Dry Field Soil Pass Test Density Moisture Density Moisture Compaction or No. Location of Test Range (pcf) N (pcf) (%) (%) Fail 1 E Section 0-1 ft 105.7 11.2 102.9 10.0 97 Pass 2 W Section 0-1 ft 105.7 11.2 103.1 10.3 98 Pass 3 Center 0-1 ft 105.7 11.2 104.7 11.1 99 Pass Remarks: 0-1', 1-2', 2-3', 3-4', 4-5' HCP=50+, > 95 % Compaction, PASS. HCP tests are empirically correlated to the relative density of the soil. Permit: 21050130 Reviewed By GFA International, Inc FBPE Registry No.4930 'am;rtic Digitally signed by Thomas FP ° GF sEO� D " W46 *" \, Montano:A0141000000017 W 818498DCD000019A3 Date: 2021.08.2710:18:30 -04'00' Thomas Dominic Montano Branch Manager STATE OF FLORIDA Professional Engineer No. 84146 This item has been digitally signed and sealed by Thomas Dominic Montano on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 1