HomeMy WebLinkAboutCreekside Lot # 108 frame all.pdf•���Lt����r�r� ��rfirr���
INSPECTION RESULTS ,, I l0 '-
Inspection Date: ITS1 I l -a I Permit No, 3 - Q 8' 3 5
Project: -
Address:?
31 k 1%1 bAAA-�
Check one:
XRegular Inspection:
❑ Reinspection Date of Initial Inspection: V - It L
Inspection Type Requested (check):
�.., ..,.bI
I vnoc,gavunu
�naergrouno
Dud Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & i
Masonry
Stack Piping & Test
HW Piping & Tes
Wall/Ceiling
Ceiling Rough -in
Water Piping & Test
CHW Piping & Te
Framing
Panel/Feeder
Gas Piping & Test
Cond. piping & T.
Structural
Service/Ground
If I Storm Piping & Test 1
1
Protection
Final Building Final Electrical ) ) Final Plumbing Final Mechan cal
Other Inspection Type: ��)n
Area Inspected/Code: L J^ b - F,,1AAji- Jb Y(_/
Inspection Results: %AAP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved 0 Not Ready
Conditions/Comments
1.
2.
3.
4.
5.
6.
7.
Inspector's Name:
OFFICES THROUGHOUT FLORIDA
60714W Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 - (772) 924-3580 (fax)
www,teamgfa.com