Loading...
HomeMy WebLinkAboutCreekside Lot 35-ss/ DENSITY REPORTUES Project No: Workorder No: Report Date: 3360.1800067.0000 242808-1 08/27/2021 607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580 In-Place Density Test Report Client:D.R. HORTON, INC. EAST FLORIDA DIVISION UES Technician:Mark Rogers 1430 Culver Drive, NE Palm Bay, FL 32907 Date Tested:08/27/2021 Project:CMT CREEKSIDE Yorktown Drive & Okeechobee Road,Fort Pierce, St Lucie County, FL Type of Test: Area Tested:Lot 35 - 3354 Trinity Circle, Ft Pierce, FL Field:ASTM D-6938 Nuclear Gauge Method Material:Backfill Laboratory:ASTM D1557 Modified Proctor Reference Datum:0 = Top of Fill The tests below meet the 95% minimum compaction requirement. Test No.Location of Test Range Maximum Density (pcf) Optimum Moisture (%) Field Dry Density (pcf) Field Moisture (%) Soil Compaction (%) Pass or Fail 1 Northeast corner of lot 0-1 ft 118.6 10.8 113.4 10.2 96 Pass 2 Southwest corner of lot 0-1 ft 118.6 10.8 112.7 9.8 95 Pass 3 Center of lot 0-1 ft 118.6 10.8 112.9 10.2 95 Pass Remarks:Permit: 2103-0838 Reviewed By GFA International, Inc FBPE Registry No.4930 Paul H. Danforth Regional VP STATE OF FLORIDA Professional Engineer No. 44653 This item has been digitally signed and sealed by Paul H. Danforth on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 1 The in-place density tests were performed within the foundation/building pad footprint of the referenced residential lot. The test results either meet or exceed the requirements of the FHA/HUD manual and the current edition of the Florida Building Code for soil compaction. The Contractor is responsible for maintaining the tested soil sub grade in the same condition that existed at the time UES performed the referenced density tests. UES is not responsible if the tested area is altered from the approved condition at the time of testing.