HomeMy WebLinkAboutReview CommentsReview Comments October 2019 page 1 of 2
1. See page A1.00, while level according St. Lucie County and FEMA website,
we are above it.
2. Will provide if used, when are product approvals submitted in this
process?
3. Prior to final inspection
4. No specific as to what is missing
5. See revised structural plan
6. See revised structural plan
7. See revised structural plan
8. We will hire a threshold inspector
9. See revised structural plan
10. Will be submitted by fire protection subcontractor when fire protection
permit is applied for. Does this permit application come now or later?
11. See pages A1.01 and A 1.02
12. See pages Al .25, A 1.22, A 3.11, A 3.10
13. See page A6 .11
14. See revised structural plan
15. See pages A life safety pages
16. See page A 1.22 and all floor plans
17. See page A 1.00
18. See schedule of doors, 17, 18, and 20
19.?
20. All architectural plans show full compliance for this occupancy
21. Sign requirements are shown at stairs on architectural plans
22. Emergency escape and rescue openings are labeled as window A on the
window schedule
23. See page A1.20, also sound transmission requirements shown on all full-
size apartment floor plans
24. See specifications on architectural plans roof plan
25. Attached
26. Letter from architect
27. See structural plans
28. See structural plan, engineer says no conflict?
29. Elevator manufacturer, attached
30. See architectural life safety plan pages
31. This restroom is accessible
32. required 21 inches is shown as minimum all toilets
33. Architect questions this comment, all plans are off CAD
34. All dwelling units, all doors are 34 inches
35. Architect says not applicable, we are covered under fair housing
page 2 of 2
36. Missing pages??
37. Application has been made, final comments address, CCCL permit under
final review.
38. Survey to provide
39. Attached
40. Garage plan altered slightly to suit working drawings requirements, all
parking spaces, vehicular accessibility, and storage units are accessible, see
architectural garage plans.
41. Submitted with site civil permit application ??
42. Impact fees already paid?