Loading...
HomeMy WebLinkAboutCreekside lot 9 Bond beam.pdfRtV f m M-ENSINEERING SCIENCES M INSPECTION RESULTS Inspection Date: y - I Permit No. 01 /Q Project: Q p2 Sc Address: 3 3 13 r: � OA_41 Check one: XRegular Inspection: ❑ Reinspection Date of Initial Inspection: fl — y -ri Inspection Type Requested (check): Footing - ----• Underground rwmamu Underground MECHANICAL Slab Floor Rough -in Rough -in Dud Rough -In Steam Piping &Test Masonry Wall/Ceiling Wall Rough -In Ceiling Rough -In Stack Piping &Test Water HW Piping & Test Framing Panel/Feeder Piping & Test Gas Piping & Test CHW Piping & Test Structural Service/Ground Storm Piping &Test Cond. Piping &Test Insulation Sheet Rock 0....F..... Appliance/Equipment . __._.. - _. Fixtures Wall & Ceiiine Final Building Final Electrical Final Plumbing �a-ujbpecuon Final Merhantr�� Other Inspection Type: Area Inspected/Code: . A $ Inspection Results.)KAP-Approved 0 AE-Approved with Exceptions ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspectors Name: 11 Lic d: pA 1 C S__' _ OFFICES THROUGHOUT FLORIDA ❑ DA-Disallowed 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com