HomeMy WebLinkAboutROOFING PERMIT INFORMATION SHEET� Tr LU(I U L
ST. LUCIE WORKS
ST LUCIE COUNTY ROOFING PERMIT INFORMATION SHEET
Florida Building Cade 7th Edition (2020)
Based on Section 1525 of the Florida Building Code - Building
INSTRUCTION PAGE
COMPLETE THE NECESSARY SECTIONS OF THE UNIFORM ROOFING SHEET
APPLICATION FORM AND ATTACH THE REQUIRED DOCUMENTS AS NOTED
BELOW:
Roof System
Required Sections of
the Permit Application
Form
Attachments Required
See List Below
Low Slope Application
A, B, C
1 2 g ,¢ g g 7
Prescriptive BUR-RAS 150
A, B, C
2,4,5,6,7
Asphaltic Shingles
A, B, D
- 1,2,4,5,6,7
Concrete or Clay Tile
A, B, D, E
1,2,3,4,5,6,7
Metal Roofs
A, B, D
1,2,3,4,5,6.7
Wood Shingles and
Shakes
A, B, D
IA4,6,6,7
Other
As Applicable
1,2,3,4,5,6,7
ATTACHMENTS REQUIRED As Applicable):
1,
Fire Directory Listing Page
2.
From Product Approval:
Front Page
Specific System Description
Specific System Limitations
General Limitations
Applicable Detail Drawings
3.
Design Calculations per Chapter 16, or if applicable, RAS 127 or RAS 128
4.
Other Component of Product Approval
5.
Municipal Permit Application
6.
Owners Notification for Roofing Considerations (Reroofing Only)
7,
Any Required Roof Testing/Calculation Documentation
Form RooflnfoFeb21 Rev Feb 18, 2021
ST. LUCIE.
Section C (Low Slope Roof)
Fill in specific roof assembly components and identify
manufacturer
(If a component is not used, identify as "NA")
System Manufacturer:
Product Approval No.:
Design Wind Pressures, From RAS 128 Or Calculations:
Zone 1': Zone 1: Zone 2: Zone 3:
Max. ❑esign Pressure, from the specific product approval
system:
Deck:
Type:
Gauge Thickness:
Slope:
Anchor/Base Sheet & No. df Ply(s):
Anchor/Base Sheet Fastener/Bonding Material:
Insulation Base layer:
Base Insultation Size and Thickness:
Base Insulation Fastener/Bonding Material:
Top Insulation Layer:
Top Insulation Size and Thickness:
Top Insulation Fastener/Bonding Material:
Base Sheet(s) & No. of Ply(s):
Base Sheet Fastener/Bonding Material:
Ply Sheet(s)' & No. of Ply(s):
Ply Sheet Fastener/Bonding Material;
Top Ply:
Top Ply Fastener/Bonding Material:
Surfacing:
Fastener Spacing for Anchor/Base Sheet Attachment:
Zone 1':—" oc @ Lap, # Rows @ "(M
Zone 1:—" oc @ Lap, # Rows @ "G
Zone 2:—" oc @ Lap, # Rows @ "o
Zone 3:—" oc @ Lap, # Rows @ "oo
Number of Fasteners Per Insulation Board:
Zone 1': Zone 1: Zane 2: Zone 3:
Illustrate Components Noted and Details as Applicable:
Woodblocking, Gutter, Edge Termination, Stripping,
Flashing, Continuous Cleat, Cant Strip, Base Flashing,
Counterflashing, Coping, Etc.,
Indicate: Mean hoof Height, Parapet Height, Height of Base
Flashing, Component Material, Material' Thickness, Fastener
Type, Fastener5pacing ❑rSubmit Manufacturers Details that
Comply with RAS 111 and Chapter 16. .
ST. LUCIE WORKS
Section D (Steep Slope Roof System)
Roof System Manufacturer:
JA TAYLOR ROOFING EDGE-LOC 1" STANDING SEAM
Notice of Acceptance Number: NOA:18-1 Q23.17
Minimum Design Wind Pressures, If Applicable (From RAS 127 or Calculations):
Zone 1: -67 Zone 2e:-7Zone 2n:-74 Zone 2r: -67 Zone 3e: -1 15Zone 3r:
Deck Type: PLYWOOD
Type Underlayment: ELF ADHERED UNDERLAYM ENT TO PDLYGLASS WS FL#5259.1
Roof Slope: - —
12
Insulation:
Fire Barrier:
Ridge Ventiiation? Fastener Type &Spacing: 6" FIELD 14" PERIMETER, 8o RING 5 NK NAILS
Adhesive Type:
Type Cap Sheet.
15' FT
Mean Roof Height: - Roof Covering: METAL
Type & Size Drip 2" X 2 112"
Edge.
ST. LUC E NORKS
Section E (Tile Calculations)
For Moment based the systems, choose either Method 1 or 2. Compare the values for Mr with the values from Mr. If the Mrvalues
are greater than or equal to the
Mrvalues, for each area of the roof, then the the attachment method is acceptable.
Method 1'Mom ent Based Tile Calculations Per RAS 12T
(lone 1:
xA-= ---)-Mg: M„ Prod u ct Ap prova I M _
(Zone2e:
xl = ��-Mg. =Mao Prod u ct App rova I Mt -
(Zone 2n:
x --Mg: = Mom, Product Approval Mf
(Zone 2r:
x = j - Mg. - MarProduct Approval Mr
(Zone 3e:
x = _ -Mg = M,� Product Approval Mf
(Zone 3r: `
x I = - Mg: Mr& Product Approval MF
Method 2 "Simplified Tile Calculations Per Table Below"
Required Moment of Resistance
(Mr) From Tahle Below Product Anoroval Mr
Mr required Moment Resistance*
Mean Roof Height Roof Slope
15'
20'
25'
30'
40'
2:12
34.4
36.5
38.2
39.7
42.2
3:12
32.2
34.4
36.0
37.4
39.8
4:12
30.4
32.2
33.8
35.1
37.3
5:12
28.4
30.1
31.6
32.8
34.9
6:12
26.4
28.0
29.4
30.5
32.4
7:12
24.4
25.9
27.1
28.2
30.0
-must ne usea in conjunction with a list of moment based tile systems
• For Uplift based the systems use Method 3. Compare the values for F' with the values for Fr If the F' values are greater than or
equal to the Fr values, for each area of the roof, then the tile attachment method is acceptable.
Method 3 "Uplift Based Tile Calculations Per RAS 12T
(Zone 1: x L =x W: _ _ ) -W; cos r =Fri Product Approval F'
JZone 2e: x L =x W:= j -W; cos r =Fr2e Product Approval F'
(Zone 2n: x L =x W:= j -W: cos r =Fr2n Product Approval F'
(Zone 2r: x L =x W: -W: -W; cos r =Fr2r Product Approval F'
(zone 3e: x L =x W:= ) -W: Cos r =Frse Product Approval F'
(Zone 3r: x L =x W:= i -W: cos r =Fro. Product Approval F'
Where to Obtain Information
Description
Symbol
Where to find
Design Pressure
Zones 1, 2e, 2n, 2r, 3e, 3r
From applicable table in RAS 127 or by an engineering analysis
prepared by PE based on ASCE 7
Mean Roof Height
H
Job site
Roof slope
B
Job Site
Aerodynamic Multiplier
a
Product Approval
Restoring Moment due to Gravity
Mg
Product Approval
Attachment Resistance
Mf
Product Approval
Required Moment Resistance
Me
Calculated
Minimum Attachment Resistance
F'
Product Approval
Required Uplift Resistance
Fr
Calculated
Average Tile Weight
W
Product Approval
Tile Dimensions
L = length W = width
Product Approval
All calculations must be submitted to the building official at the time of permit application.