Loading...
HomeMy WebLinkAboutROOFING PERMIT INFORMATION SHEETi' • �1.:, ST. DUCE WORKS ST LUCIE COUNTY ROOFING PERMIT INFORMATION SHEET Florida Building Code 7th Edition (2020) Based on Section 1525 of the Florida Building Code - Building INSTRUCTION PAGE COMPLETE THE NECESSARY SECTIONS ❑F THE UNIFORM ROOFING SHEET APPLICATION FORM AN❑ ATTACH THE REQUIRE❑ ❑OCUMENTS AS NOTED BELOW: Roof System Required Sections of the Permit Application Form Attachments Required See List Below Low Slope Application A, B, C 1,2,3,4,5,6,7 Prescriptive BUR-RAS 150 A, B, C 2,4,5,6,7 Asphaltic Shingles A, B, D Concrete or Clay Tile A, B, D, E Metal Roofs A, B, D Wood Shingles and Shakes A, B, D Other As Applicable 1,2,3,4,5,6,7 ATTACHMENTS REQUIRED As Applicable): 1. Fire Directory Listing Page 2. From Product Approval: Front Page Specific System Description Specific System Limitations General Limitations Applicable Detail Drawings 3, Design Calculations per Chapter 16, or if applicable, RAS 127 or RAS 128 4. Other Component of Product Approval 5. Municipal Permit Application 6. ❑wners Notification for Roofing Considerations (Reroofing Only) 7. Any Required Roof Testing/Calculation ❑ocumentation Form RoofinfoFeb21 Rev Feb 18, 2021 ST. LUCIE WORKS Section C (Low Slope Roof) Fill in specific roof assembly components and identify manufacturer (If a component is not used, identify as "NA") System Manufacturer: Product Approval No.: Design Wind Pressures, From RAS 128 Or Calculations: Zone 1': Zone 1: Zone 2:_Zone 3: Max. Design Pressure, from the specific product approval system: Deck: Type: Gauge Thickness: Slope: Anchor/Base Sheet & No. df Ply(s): Anchor/Base Sheet Fastener/Bonding Material: Insulation Base Layer: Base Insultation Size and Thickness: Base Insulation Fastener/Bonding Material: Top Insulation Layer: Top Insulation Size and Thickness: Top Insulation Fastener/Bonding Material: Base Sheet(s) & No, of Ply(s): Base Sheet Fastener/Bonding Material: Ply Sheet(s)' & No. of Ply(s): Ply Sheet Fastener/Bonding Material: Top Ply: Top Ply Fastener/Bonding Material: Surfacing: Fastener Spacing for Anchor/Base Sheet Attachment: Zone 1':—" oc @ Lap, # Rows— ®= W Zone 1:—"oc@ Lap, # Rows —®_°on Zone 2:_" oc @ Lap, # Rows — ®— oo Zone 3:—" oc @ Lap, If Rows— ®— oc Number of Fasteners Per Insulation Board: Zone 1':—Zone 1:—Zone 2:_Zone 3:— Illustrate Components Noted and Details as Applicable: Woodblocking, Gutter, Edge Termination, Stripping, Flashing, Continuous Cleat, Cant Strip, Base Flashing, Counterflashing, Coping, Etc.. Indicate: Mean Roof Height, Parapet Height, Height of Base Flashing, Component Material, Material' Thickness, Fastener Type, Fastener Spacing or Submit Manufacturers Details that Comply with RAS 111 and Chapter 16.. Section D (Steep Slope Roof System) Roof System Manufacturer: JA TAYLOR ROOFING 5V CRIMP Notice of Acceptance Number: FL#17443.1 Minimum Design Wind Pressures, If Applicable (Frorn RAS 127 or Calculations): Zone 1: -74 Zone 2e: -74 Zone 2n:- 10 one 2r: -108 zone 3er:108 Zone 3r:-128 Deck Type: PLYWOOD Type Underlayment EEL & STICK-OVVENS CORNING TTAN IUM-FL#11602.1 Roof Siope: 2 : 12 ]nsulat on: Fire Barrier: Ridge Ventilation? Fastener Type & Spacing: 16" FIELD 14" PERIMETER, 8D RING $KiANK=N11L-S Adhesive Type: Type Cap Sheet: I Mean Roof Height: 15' FT Roof Covering: METAL Type & SIze Drip Edge: ST. LUCIE WORKS Section E (Tile Calculations( For Moment based tile systems, choose either Method 1 or 2. Compare the values for Mr with the values from Mr. If the Mf values are greater than or equal to the Mrvalues, for each area of the roof, then the tile attachment method is acceptable. Method 1'Moment Based Tile Calculations Per RAS 12T (Zone 1: _x,t_= _)- Mg: _=M,r_ Product ApprovalM (Zone 2e: _xX_= . . .- Mg: _=Ma_ Product Approval M (Zone 2n: xl_= _)-Mg: _v Ma,_ Product ApprovalM (Zone 2r: _X Z_= _)-Mg: _=M, - Product Approval Mf (Zone 3e: �X71_= 1-Mgt_=M,q,_ Product Approval Mr (Zone 3r: _XX-=-I-VQ:-=Ma- Product Approval Mr Method 2 "Simplified Tile Calculations Per Table Below" Required Moment of Resistance (Mr) From Table Below -Product Approval Mf- Mr required Moment Resistance - Mean Roof Height Roof Slope 15' 20' 25' 30' 4d 2:12 34.4 36.5 38.2 39.7 42.2 3:12 32.2 34.4 36.0 37.4 39.8 4:12 30.4 32.2 33.8 35.1 37.3 5:12 28.4 30.1 31.6 32.8 34.9 6:12 26.4 28.0 29.4 30.5 32.4 7:12 24.4 25.9 27.1 28.2 30.0 -Must be used in conjunction with a list of moment based the systems For Uplift based tile systems use Method 3. Compare the values for F' with the values for Fr If the F'values are greater than or equal to the Fr values, for each area of the roof, then the tile attachment method is acceptable. Method 3 "Uplift Based rile Calculations Per RA512T (Zone 1: x L=x W:=___-j -W: cos r=Ft Product Approval F' (Zone 2e: _xL =x W:= )-W:-Cos r_=Fr. Product Approval F' (Zone 2n: xL =x W:=_) -W:_ Cos =Frm Product Approval F' (Zone 2r: x L=x W:=-W: cos r=Far_ Product Approval F' (Zone 3e: x L =x W:= -W: COS r -Fro._ Product Approval F' (Zone 3r: x L=n W:=_) -W: cos r=Frar_ Product Approval F' Whereto Obtain Information Description Symbol Whemtofind Design Pressure Zones 1, 2e, 2n, 2r, 3e, 3r From applicable table in RA5127 or by an engineering analysis prepared by PE based on ASCE 7 Mean Roof Height H Job Site Roof Slope 0 Job Site Aerodynamic Multiplier a Product Approval Restoring Moment due to Gravity Mr Product Approval Attachment Resistance Mr Product Approval Required Moment Resistance Me Calculated Minimum Attachment Resistance F' Product Approval Required Uplift Resistance Fr Calculated Average Tile Weight W Product Approval Tile Dimensions L=lengthW=width Protluct Approval All calculations must be submitted to the building official at the time of permit application.