Loading...
HomeMy WebLinkAboutInstallation Guidelines for 60Hz Air-Cooled Generators�P« �. 3 ST.LUCIE COUNTY G PLAN REVIEW !g ap BLDG: m0 DATE_: �3 ELE �* jjjL§L DATEJ'���/ PLUMB: - DATE: MECH; DATE: ` ley` FILE COPY .r �v �? R �r, �� �; ' � � s� -._� a.=_ - z=� s — V_ Total Square Footage of Residence Square Footage@ 3 Watts Per Ft2 1950 managed ? All Appliances,Motors, and Low Power Factor Loads: Range 7680 Diswasher 1680 Washer 1200 Microwave 1500 Refrigerator - 1200 Tankless water heater 200 Sump Pump 750 Water Pump 1800 X Dryer 5000 X Pool Pump 1800 Appliance and Other Loads total load from steps 1 & 2 1st 10 KW @ 100 Remainder @ 40% Total General Load managed? System# x System 1 Discounted Load: Total Calculated Load : Cooling A/C & Heating Load Management Summary: ( At 100% of Load Value) Total Generator Load: 22810 28,660 10,000 7,464 17464 load heat load 3,813 10,000 6500 Watts 23964 Amps: 99.85 Total Managed Load: 17,100 14,744 ( Load on Generator with discounted managed load values removed from total load) 345 113.81 vrROLvnxNG��tttvKa.swrvuun 13RRATED PLUG (FIELD SUPPLIED) F uuzrSRIJTDOWNSYVITCH ly-1r Ron -WIRELEMGi'rrit� SS 6iODULE :3W NPT (14.18-24" 05 REQU7R® FUEL PRESSURE: NATURALGAS : &S-r WATER COLUMN Well LIQUID PROPANE (VAPOR) :18-1T WATER COLUMN Lt 733 - - (28.81 Ira v 218 ._... ....._ REAR VIEW �- 14 �yC ,ta TRM tl'IMb • t set LEFT SIDE VIEW COMPACTED SOIL RIGHT SIDE VIEW 50 Installation Guidelines for 60 Hz Air -Cooled, Generators Section 2 General Information and Setup Figure 2-1. Features and Controls Know Your Smart Management Module and Carton Contents Priority Dial (A) — Sets module priority. NOTE: PRIORITY MUST BE DIFFERENT for each module in an installation. Priority sets the order in which loads recover from a load shed event. Recovery time from a load shed event is five minutes for Priority 1. Each priority after Priority 1 waits an additional 15 seconds after the initial recovery time. See Table 1. Lockout Switch (B) — Prevents load from operating when sys- tem is operating under generator power. See Table 2. NOTE: Recovery time is based on priority dial settings. See Table 1. Test Button (C) — Disables contactor output for a specified time_ LED (D) — Provides module status. See Table 3_ Contactor (E) — Controlled by a smart controller in module. Contactor remains CLOSED until generator power is required. Upon generator activation, controller moves to OPEN to handle overload conditions. NOTE: The contactor is also opened during lockout switch ACTIVE state. Mounting Holes (F) — Internal enclosure mounting holes pro- vide clean and sturdy mounting. Priority Decal (G) — Provided for recording priority of each module in installation. Should be installed on electrical panel. Owner'slInstallation Manual for SMM Table 1. Priority Dial Settings Priority Recovery Time 1 5 minutes 2 5 minutes 15 seconds 3 5 minutes 30 seconds 4 5 minutes 45 seconds 5 6 minutes 6 6 minutes 15 seconds 7 6 minutes 30 seconds 8 6 minutes 45 seconds g Not Used 0 Not Used Section 3 Installation, Tests and Troubleshooting► Electrical Specifications Input Voltage 240 VAC Current Rating 50A resistive, 40A inductive Locked Rotor Amp Rating 240A Motor Rating 3HP Contactor Coil Voltage 1240 VAC Enclosure Specifications UL Rating I Type 3R Temperature -30 to 50 deg C (-22 to 122 deg F) Remove Contents from Carton 1. Open carton. 2. Remove and verify carton contents. 3. Retain carton for mounting template. Carton Contents: • Smart Management Module (SMM) • Priority decal • Owner/Installation manual 4. Contact the place of purchase with the unit model num- ber for any missing carton contents. 5. Record date of purchase on front cover of this manual. Tools Needed For Installation • Power drill and suitable drill bit • Phillips and flat head screwdrivers • Mounting screws or wall anchors • Electrical materials Mounting Instructions The recommended installation is near the electrical panel or appliance/load. The enclosure has a UL type 3R rating and can be mounted indoors or outdoors. It provides a degree of protection against rain and sleet and is undamaged by the formation of ice on the enclosure. )1A Electrocution. Turn utility and emergency power supplies to OFF before connecting power source and load lines. Failure to do so will result in death or serious injury. (000116) 1. Turn OFF both UTILITY (NORMAL) and EMERGENCY (STANDBY) power supplies. 2. Choose mounting location (near electrical panel, appliance or load to be managed). 3. Use a flat head screwdriver to remove appropriate knockouts from module enclosure for wiring. See A in Figure 3-1. NOTE: If outdoor installation is chosen, bottom knockouts must be used to meet NEMA 3R rating and protect against water ingress. Owner's/installation Manual for SMM 4. Hold SMM enclosure against mounting surface with arrows pointing up, and mark or drill four mounting holes. See B in Figure 3-1 for arrows. S. Install SMM enclosure to mounting surface using appro- priate mounting screws or wall anchors. 000138 Figure 3 -1. Knockouts and UP Arrows �Wl 01 D1 O O o 000107 Figure 3 -2. Mounting Dimensions Height (in/mm) H1 6.171156.8 H2 2.36/60 Width (in/mm) W1 7.061179.4 W2 4.72/120 Depth (in/mm) D1 3.7/94