HomeMy WebLinkAboutCreekside Lot#- 110 truss.pdf1 V E R S, AL` //U
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date:
—� Permit No.
Project:
Address: � IC, c
Check one:
ARegular Inspection:
G
0 1
❑ Reinspection
Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
Underground
g
MECHANICAL
Duct Rough -In
Footing
Underground
Floor Rough -In
Rough -In
Steam Piping &Test
Slab
Wall Rough -In
Stack Piping & Test
p g
HW Piping & Test
Masonry
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Wall/Ceiling
Panel/Feeder
Gas Piping & Test
Cond. Piping &Test
Framing
Service/Ground
Storm Piping & Test
Insulation
Structural
A Hance/Equipment
pp
Fixtures
Wall & Ceiling
Sheet Rock
Lighting Protection
Equipment
Equipment
Roofing
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Electrical
Final Plumbing
Final Mechanical
Final Building
Other Inspection Type
Area Inspected/Code: r' 11
Inspection Results:XAP-Approved ❑ AE-Approved with E cceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments
1.
2.
3.
4.
5.
6.
7.
Inspector's
Lic.#:
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www teamtfa.com