HomeMy WebLinkAboutCreekside lot 90 tt.pdfENGINEERING SCIENCES
g3UNIVERSAL
INSPECTION RESULTS
LC I ?()
Inspection Date: v -3 Permit No.
Project:
Address: 3 3 a O pO Qt 17 / Q4
Check one:
r°: Regular Inspection:
;t,a/
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
Footing
Slab
ELECTRICAL
Underground
Floor Rough -In
PLUMBING
Underground
Rough -In
MECHANICAL
Duct Rough -In
Steam Piping & Test
Masonry
Wall/Ceiling
Wall Rough -In
Ceiling Rough -In
Stack Piping & Test
Water Piping & Test
HW Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
all & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
I Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code: 1 3�
Inspection Results: ® AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments:
1.
2.
3.
4.
5.
6.
7.
Inspector's Name:
v OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com