Loading...
HomeMy WebLinkAboutCreekside lot 90 tt.pdfENGINEERING SCIENCES g3UNIVERSAL INSPECTION RESULTS LC I ?() Inspection Date: v -3 Permit No. Project: Address: 3 3 a O pO Qt 17 / Q4 Check one: r°: Regular Inspection: ;t,a/ ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL Footing Slab ELECTRICAL Underground Floor Rough -In PLUMBING Underground Rough -In MECHANICAL Duct Rough -In Steam Piping & Test Masonry Wall/Ceiling Wall Rough -In Ceiling Rough -In Stack Piping & Test Water Piping & Test HW Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures all & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical I Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: 1 3� Inspection Results: ® AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name: v OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com