Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Creekside 113 wire l.pdf
II ENGIHEERIFiG SCIENCES INSPECTION RESULTS m Inspecti4 Project: Address (at 1 l Check one: XRegular inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): �wO1�r MECHANI BUILDING/ RUCTURAL ELEcrnrv+� Underground Duct Rougn-m Footin Underground Rough -In Steam Piping & Tes' Slab Floor Rough In Stack Piping &Test HW Piping &Test Masonry Wall Rough -In r Piping &Test Water CHW Piping & Test Wall/Ceiling Ceilin Rough -in Gas Piping & Test Cond. Piping &Test Framing Panel/Feeder Service/Ground Storm Piping & Test _ insulation Wall & Ceiling_ Final Plumbins __( )Final Other Inspection Type: -! Area Inspected/Code: ❑ DA-Disallowed Inspection Results: ®AP-APP roved AE-Approved with Exceptions ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 2. 3. —_� 4. 5. 6. �- 7. ----------- irt Lic.#:1 /J - . S- Inspector's Name: ��OJ:F�JCESTHROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, 924-3575 .(772) 924-3580 (fax)