Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Creekside Lot# 8.pdf
JEUNIVERSAL' ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: — ;� ( — Permit No. 6) 7 �� Project: o ] �7 Address: Check one: Regular Inspection: c� ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: ��1 /"I Inspection Results: 49 AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. i Inspector's Name: Lic.#: _�CSL LAY. OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 (772) 924-3580 (fax) www.tearngfa.com