Loading...
HomeMy WebLinkAboutcreekside 107Frameall.pdfMUNWERSAL" —7(� ENGINEERING SCIENCES _ INSPECTION RESULTS ! p Permit No. Inspection Date: Project: Address: 9� � c �— Check one: Regular Inspection: Date of Initial Inspection: ' ❑ Reinspection Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING Underground MECHANICAL Duct Rough -In Footing Underground Floor Rough -In Rough -In Steam Piping & Test Slab Wall Rough -In Stack Piping & Test HW Piping & Test Masonry Ceiling Rough -In Water Piping &Test CHW Piping &Test Wall/Ceiling Panel/Feeder Gas Piping &Test Cond. Piping & Test Framing Service/Ground Storm Piping &Test Insulation S!ructural Appliance/Equipment Fixtures Wall & Ceiling Sheet Rock Lighting Protection Equipment Equipment Roofing Re -inspection Re -inspection Re -inspection Final Plumbing Re -inspection P Final Mechanical Final Building Final Electrical Other Inspection Type Area Inspected/Code: l r Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed &DP -Disapproved O Not Ready 4. 5. 6. 7. Inspector's Name: � OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www te_amgfa.com