HomeMy WebLinkAboutCreekside Lot 35-Temp Toilet.pdfENGINEEFtING SCIENCES
INSPECTION RESULTS
Inspection Date: 1Permit No. 3 6
I
Project:
Address: �J 3
Check one:
Regular inspection:
❑ Reinspection
Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
Underground
MECHANICAL
Duct Rough -In
Footing
Underground
Floor Rough -In
Rough -In
Steam Pi ing & T
P
Slab
Wall Rough -In
Stack Piping &Test
HW Piping & Test
Masonry
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Wall/Ceiling
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Framing
Service/Ground
Storm Piping & Test
Insulation
Structural
Appliance/Equipment
Fixtures
Wall & Ceiling
g
Sheet Rock
Lighting Protection
Equipment
Equipment
Roofing
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Electrical
Final Plumbing
Final Mechanical
Final Building
Other Inspection Type:
Area Inspected/Code:
Inspection Results:OrAP-Approved ❑ AE Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments:
Inspector's Name
Lic.#:_4�
� OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teaMgfa.com