Loading...
HomeMy WebLinkAbout21-139C - Bryn Mawr Condos 2021 - Bldg C - Rep 4 - 09.08.21M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 21-139C Report No. 4 Project Manager: Building Official: Contractor: File Mr. Gene Ross – Elliott Merrill Community Mgmt. SLC Building Department Mr. Chris Arias – Daniello & Associates, Inc. Page 1 of 2 THRESHOLD INSPECTION REPORT BRYN MAWR CONDOMINIUMS CONCRETE REPAIRS 2021 – BLDG. C 5055 N. HWY A1A, FORT PIERCE, FL 34949 SLC BLDG. DEPT. PERMIT NUMBER: 2106-0415 PROJECT NAME: Bryn Mawr Condominiums Concrete Repairs 2021 – Bldg. C DATE: September 8, 2021 CLIENT: Elliott Merrill Community Management LOCATION: Fort Pierce, FL CONTRACTOR: Daniello & Associates, Inc. PROJECT MGR: Mr. Chris Arias INSPECTED BY: Todd Rhoten WEATHER: Sunny WORK INSPECTED: • Common walkways. • Decorative topping & waterproofing – All floors where spall repairs were performed. • Railing posts & Top rail replacement – 6th through 9th floors. OBSERVATIONS: Decorative topping & waterproofing • Waterproofing and decorative top coat has been placed at all concrete repairs along the common walkways. Railing Posts & Top Rails • Railing posts have been replaced at the 6th through 9th floors as follows: o Units 602, 605, 606, 703, 801, 806 & 902 – (1) rail replaced at each unit. o Units 702, 802 & 803 – (2) rails replaced at each unit. • Railing cap 4’ sections has been replaced at Units 803, 804 & 805. • Stucco has been placed on the top rails to match the surrounding areas. RECOMMENDATIONS: • Remove and replace the remaining railing posts & rail caps at the 1st through 5th floors as per plans. ______________________________ _________________________________ Michael Lue, P.E. Todd Rhoten M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 21-139C Report No. 4 Project Manager: Building Official: Contractor: File Mr. Gene Ross – Elliott Merrill Community Mgmt. SLC Building Department Mr. Chris Arias – Daniello & Associates, Inc. Page 2 of 2 Pic 1 Unit 502 Finish top coat at common walkway. Pic 2 Unit 804 Top rail replacement. Pic 3 Unit 804 Top rail replacement.