Project No. 21-139C Report No. 4
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Building Department
Mr. Chris Arias – Daniello & Associates, Inc.
Page 1 of 2
THRESHOLD INSPECTION REPORT
BRYN MAWR CONDOMINIUMS CONCRETE REPAIRS 2021 – BLDG. C
5055 N. HWY A1A, FORT PIERCE, FL 34949
SLC BLDG. DEPT. PERMIT NUMBER: 2106-0415
PROJECT NAME: Bryn Mawr Condominiums Concrete
Repairs 2021 – Bldg. C DATE: September 8, 2021
CLIENT: Elliott Merrill Community Management LOCATION: Fort Pierce, FL
CONTRACTOR: Daniello & Associates, Inc. PROJECT MGR: Mr. Chris Arias
INSPECTED BY: Todd Rhoten WEATHER: Sunny
WORK INSPECTED:
• Common walkways.
• Decorative topping & waterproofing – All floors where spall repairs were performed.
• Railing posts & Top rail replacement – 6th through 9th floors.
OBSERVATIONS:
Decorative topping & waterproofing
• Waterproofing and decorative top coat has been placed at all concrete repairs along the common walkways.
Railing Posts & Top Rails
• Railing posts have been replaced at the 6th through 9th floors as follows:
o Units 602, 605, 606, 703, 801, 806 & 902 – (1) rail replaced at each unit.
o Units 702, 802 & 803 – (2) rails replaced at each unit.
• Railing cap 4’ sections has been replaced at Units 803, 804 & 805.
• Stucco has been placed on the top rails to match the surrounding areas.
RECOMMENDATIONS:
• Remove and replace the remaining railing posts & rail caps at the 1st through 5th floors as per plans.
______________________________ _________________________________
Michael Lue, P.E. Todd Rhoten
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 21-139C Report No. 4
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Building Department
Mr. Chris Arias – Daniello & Associates, Inc.
Page 2 of 2
Pic 1
Unit 502
Finish top coat at common walkway.
Pic 2
Unit 804
Top rail replacement.
Pic 3
Unit 804
Top rail replacement.