Loading...
HomeMy WebLinkAboutScan Sep 10, 2021 at 4.51 PMPlanning &Development Services Building &Code Regulation Division 2300 Virginia Ave Fort Pierce,FL 34982 772-462-2172 Fax 772-462-6443 COUNTYFLORID A CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT 3448|. PERMIT #:SLC-2009-asoy J0BADDRESS:32RO HATCHE SAEET,P piasE BUILDER/CONTRACTOR:PAUL MHN -HAUtEE coteDNS. PESTCONTROLCONTRACTOR:Reeenn ANAmat Seuices PESTCONTROLLICENSE #:J31S9C We,the undersigned,hereby certify that we have pretreated the abovedescribedconstruction for subterranean termites in accordance with the standards of the National Pest Control Association. Chemicalsused:DOmN rDN 2L. Totalgallonsused:O 6tL. TimeofTreatrment:4 00 Pm Squarefeet ifareatreated:ISO SQ T. Percentage of solution: Dateof Treatment:-10-2024 Footing Slab 1*Treatrment Re-Treat 1 Treatment Re-Treat Pools Driveway 1*Treatment Re-Treat 1 Treatment Re-Treat VPerimeter for FinalInspection Other 1 Treatment Re-Treat S cSignatureofExterminator 2-10-ZDZ{ Date Note:There must be a completed form for each requred treatment or re-treatment and this form must be on the job site to bepicked up by theinspectorat time ofeachinspectionor thescheduledinspectionwill failandare-inspection fee charged. FBC104.2.6 Certificate of ProtectiveTreatmentfor prevention oftermites.A weatherresistantjobsite posting board shall be provided to receive duplicate TreatmentCertificates as each requiredprotective treatment is completed, providing a copy for the person the permit is issued to and anotherCopyfor thebuildingpermitfiles.The Treatment Certificate shall provide the product used,identity of theapplicator,time and date of thetreatment,sitelocation,area treated,chemicalused,percentconcentrationandnumber ofgallonsused,toestablishaveritiablerecord of protective treatment.Ifthe soil chemicalbarrier method for termiteprevention isused,final exteior treatmentshal! becompleted prior to finalbuildingapproval.St Lucie County requires for the final inspection for CO,a Permanent Sticker to be placed on the eleçtrical panel boxcoOver,listing all the treatments and dates of applications.